Exhibit_A_of_SPRBL118Q0006_Technical_Requirements_15-Nov-2017.pdf

PDF 83 KB Posted

Attached to
225-400MHZ UHF SATCOM ANTENNA / NSN: 5985-01-590-5224
Solicitation number
SPRBL118Q0006
Issued by

About this file

EXHIBIT A - TECHNICAL REQUIREMENTS

View the file

Other files

File Type Posted
SPRBL118Q0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A SPRBL1-18-Q-0006 Page 1 of 7 Issue: 15 November 2017

TECHNICAL REQUIREMENTS

UHF SATCOM 225-400MHZ ANTENNA

Aberdeen Proving Ground, Maryland

Exhibit A SPRBL1-18-Q-0006 Page 2 of 7

TABLE OF CONTENTS

APPLICABLE DOCUMENTS

CONFIGURATION BASELINE

Part Revisions

Ozone Depleting Chemicals 3

Year 2000 3

Special Instructions

PACKAGING

Wood Packing Material

SPECIALIZED TESTING

CONTRACT SECURITY

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

Individual CDRLs

Exhibit A SPRBL1-18-Q-0006 Page 3 of 7

APPLICABLE DOCUMENTS

Military and Federal Standards MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-130N(1) Identification Marking of US Military Property MIL-STD-2073-1E Standard Practice for Military Packaging

Military and Federal Specifications

Other Documents DLAD 52.247-9012 Requirements for Treatment of Wood Packaging Material (WPM) (FEB 2007)

Commercial Documents ISPM 15 Regulation of Wood Packaging Materials in International Trade.

CONFIGURATION BASELINE

The applicable Configuration Baseline (CB) for the listed Configuration Item (CI)/Computer Software Configuration Item (CSCI) is as follows:

NSN Nomenclature Part Numbers/Drawings 5985-01-590-5224 ANTENNA, 225-400MHz UHF SATCOM 19-430-10P4

Part Revisions The Government shall be notified of any changes in parts to manufacture these items (Configuration Control/Management) per CDRL DD Form 1423 for DI-MISC-80711A. The Government does not have to accept items that have configuration changes not approved by the procuring Government activity.

Ozone Depleting Chemicals There are no Ozone Depleting Chemicals used in these items.

Year 2000 Year 2000 (Y2K) does not affect any of these items.

Special Instructions IUID: All items shall have an IUID assigned and marked in a conspicuous area of the item so as to not interfere with usage. IUID shall be IAW DFARS 252.211-7003 Item Unique Identification and Valuation.

IUID shall include but not limited to NSN, Serial Number, part number and nomenclature. Marking shall be permanent Human Readable characters per MIL-STD-130N with change 1.

Requirements for Value Engineering. The submission of VECPs is encouraged to eliminate unnecessary requirements, reduce costs, and improve functionality of Team Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) managed weapon systems. VECPs can increase the value of delivered products and services and improve contractor profit. FAR clause 52.248-1 is incorporated by reference.

Value Engineering Information. To obtain more information about Value Engineering teaming within C4ISR, contact the Value Concepts Office at:

HEADQUARTERS U.S. ARMY CECOM LCMC

Exhibit A SPRBL1-18-Q-0006 Page 4 of 7

ATTN: AMSEL-LCL-EIE (Value Concepts Office)

6001 COMBAT DRIVE

ABERDEN PROVING GROUND, MARYLAND 21005-1845

Phone: 443-861-5415

PACKAGING

Wood Packing Material: Wood Packaging Material in compliance with ISPM-15, Regulation of Wood Packaging Material in International trade, is applicable. Marking shall be in accordance with MIL-STD-129R. RFID Requirements shall be in accordance the Section ‘F’ clause, DFARS 252.211-7006, of the contract. Wood Packaging Material (WPM) shall meet the requirements below.

Nonmanufactured soft and hard wood materials identified as intended for use in the construction of wooden pallets, wood containers, and blocking and bracing shall be heat treated (HT) to a core temperature of 56 degrees Centigrade for 30 minutes, certified, and marked by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with their Nonmanufactured Wood Packing Policy and Nonmanufactured Wood Packing Enforcement Regulations, both dated 30 May 2001.

New WPM: New WPM acquired by DoD Components to include contractors, shall be compliant with International Standards for Phytosanitary Measures (ISPM) Number 15, Regulation of Wood Packaging Material in International Trade (2009), United Nations (UN), Food and Agriculture Organization (FAO). Within the United States, the DoD Components and contractors shall also adhere to the American Lumber Standard Committee (ALSC) and the National Wood Pallet and Container Association (NWPCA), guidelines on “Pest Free” WPM. In overseas areas, DoD Components shall procure all WPM in compliance with host nation implementation of UN IPPC Phytosanitary standards, if such standards have been implemented.

Exhibit A SPRBL1-18-Q-0006 Page 5 of 7

DS7029 - DS7033

NSN Prot Req PKG-REF or SPI LPK QUP ICQ Special Markings

Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM) 5985-01-590-5224 Military MIL-STD-2073-1E B 001 - 42 1 00 00 NA D ED - - - BC

Exhibit A SPRBL1-18-Q-0006 Page 6 of 7

SPECIALIZED TESTING

CONTRACT SECURITY

Any AT/OPSEC standard contract language and/or security language shall be approved by the G-2 Army Security Office prior to inclusion below.

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL Data Line No. DID Identification Title E001 DI-MISC-80711A Scientific and Technical Reports

Individual CDRLs

Exhibit A SPRBL1-18-Q-0006 Page 7 of 7

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: 0001

0002 A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ANTENNA, 225-400MHz UHF

SATCOM

COBHAM PLC

formerly CHELTON INC

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

E001 Scientific and Technical Reports Configuration Management

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80711A RD-PRA-AB INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

LT ASREQ SEE ITEM 16 b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

SEE ITEM 16

Reg

Repro

16. REMARKS: Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in on page 4- (Parts revisions) per CDRL DI-MISC-80711A.

The contractor shall prepare and submit CCDs for Government review in accordance with this document for Parts Revisions (page 4) when there is a Major change (See page 4) to or departure from a contractual baseline.

All Parts Control Documents for Major changes shall be submitted for Government review or notification.

Data shall be submitted and exchanged electronically in Microsoft Office 2003 or better suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.

RD-PRA-AB

PCO

ACO

QAR

SPRBL1

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Robert Liang

RDER-PRA-AB

Mechanical Engineer

08/04/17 Tuan Pham

RDER-PRA-AB

Chief, Avionics Branch, PRD

08/04/17

DD FORM 1423

APPLICABLE DOCUMENTS
CONFIGURATION BASELINE
Part Revisions
Special Instructions
PACKAGING
Wood Packing Material: Wood Packaging Material in compliance with ISPM-15, Regulation of Wood Packaging Material in International trade, is applicable. Marking shall be in accordance with MIL-STD-129R. RFID Requirements shall be in accordance the Sec...
SPECIALIZED TESTING
CONTRACT SECURITY
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
Individual CDRLs
DD FORM 1423

File details come from the government source that posted it.