A19_statement_of_Work.docx

DOCX document 43 KB Posted

Attached to
Control, Intercommunication Set Federal contract opportunity
Solicitation number
SPRBL117Q0005
Issued by
Defense Logistics Agency Land and Maritime

View the file

Other files for this federal contract opportunity

Other files attached to Control, Intercommunication Set, newest first.
File Type Posted
A19_Amendment_0001_SPRBL117Q0005.pdf PDF
A19_SPRBL117Q0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A SOW SPRBL1-17-Q-0005

Statement of Work

1. Scope. This Statement of Work (SOW) defines the efforts required to produce and deliver the Control, Intercommunication Set, Part Number 653302, NSN: 5831-01-491-9407, in accordance with the documents listed below. The Control, Intercommunication Set is used in Blackhawk and Chinook Helicopters.

2. Applicable Documents. The following documents or the latest revision are applicable to the extent cited.

2.1 Military
and Federal Stds
Document
No.
Document Title
Applicability
MIL-STD-
129 P
Military Marking for Shipment and Storage

w/Change 4 Required

MIL-STD-

130 N

Identification Marking of U.S. Military Property

Required

2.2 Military
and Federal Specs
Document
No.
Document Title
Applicability

NONE

2.3 Other
DoD Documents
Document
No.
Document Title
Applicability

NONE

2.4 Com’l
Documents
Document
No.
Document Title
Applicability
ISPM
Number 15
Regulation of Wood Packaging Material in International Trade
Required
ASTM
D3951-15
Standard Practice for Commercial Packaging
When Commercial Packaging is Required

3. Requirements. The contractor shall establish a manufacturing capability for delivering acceptable hardware on schedule at minimal costs in accordance with (IAW) this SOW. Any changes or additions will be negotiated and approved by the Procuring Contracting Officer (PCO) prior to being implemented. The functional capabilities for which the Control, Intercommunication Set was designed shall not be changed, modified, or altered unless such changes are directed by the PCO.

3.1. Requirements for Packaging. Preservation, packaging and marking for shipment shall be In accordance with (IAW) the packaging and marking section of the contract. Packaging/packing shall be IAW ASTM D3951-15, Standard Practice for Commercial Packaging. Level of Protection (LOP): Commercial, Level of Pack (LPK): Commercial, Quantity Unit Pack (QUP): 001

3.1.1. Wood packaging materials shall meet the following requirements.

3.1.1.1. Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames and cleats. This requirement excludes materials that have under gone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board.

3.1.1.2. All WPM shall meet the requirements of the International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulation of Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.

3.1.1.3. All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KDHT) in accordance with American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).

3.1.1.4. All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

3.1.1.5. Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.

3.2. Requirements for Marking Commercial Items. Each item delivered under contract, along with each assembly, sub assembly, component and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, etc., need not be marked. This requirement should be entirely met by the contractor’s standard commercial marking. However, if there is any question about marking, it shall be directed to the Contracting Officer for resolution.

3.3. Requirements for Item Unique Identification (IUID). The contractor shall mark all contract deliverables In Accordance With (IAW) DFARS clause 252.211-7003 in Section F of this contract and the following requirements.

3.3.1. New items: The contractor shall provide IUID, or DoD recognized equivalent, for all items delivered with an acquisition cost of $5000 or more. For long term contracts, any items that have range quantity prices established, that will exceed the $5000 unit price shall have IUID markings from the beginning of the contract. IUID markings shall be IAW MIL-STD-130N.

3.3.2. Commercial Markings. All other items shall have acceptable commercial markings that meet the guidelines in Department of Defense (DoD) Guide to Uniquely Identifying Items http://www.acq.osd.mil/dpap/pdi/uid/index.html.

3.3.3. Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-STD-130N.

3.3.4. Deleterious Effect. Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.

3.3.5. IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N.

3.3.5.1. Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD 130N. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.

3.3.5.2. Markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.

3.3.5.3. The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the government at the end of the contract.

3.3.6. Correction of Noncompliant Equipment and Technical Data.

3.3.6.1. The contractor shall initiate the appropriate configuration control document to correct all affected drawings/specifications which conflict with or omit the marking requirements stipulated above.

3.3.7. Pricing of IUID Requirements. All efforts required by this SOW and contract, including, but not limited to, the preparation of ECPs or notification of marking deficiencies, serial number data reporting at end of contract and the actual marking of hardware, will be included in the base contract price.

3.4. Acceptance Test Procedures. One hundred percent (100%) Acceptance testing shall be performed during the contract

3.5. Requirements for Quality Assurance System. The contractor shall implement and maintain a Quality Assurance System for commercial items that meets or exceeds commercial best practices. These established commercial quality requirements shall be commonly accepted practices employed by industry in both national and international manufacturing environments. The contractor shall comply with the following requirements in addition to their best practice commercial quality assurance system.

3.5.1. Quality System. The contractor shall establish/maintain a system for the final inspection and test of all purchased items to comply with contract or order requirements.

3.5.2. Inspection and Testing. The contractor shall assure that all inspections and tests were performed on completed products. The contractor shall perform any additional inspections and tests (including visual/mechanical inspections and functional tests) required to satisfy the form, fit, and function requirements of the contract or order.

3.5.3. Records. The contractor shall maintain adequate records of inspections and tests to demonstrate that the final product satisfies contract requirements.

3.5.4. Measuring, Testing, and Inspection Equipment. The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that finished products conform to contract requirements. These devices shall be calibrated against certified measurement standards, which are traceable back to national/international standards.

3.5.5. Nonconforming Material. The contractor shall maintain controls for material, which does not satisfy contract or order requirements, including procedures for the identification, segregation, and disposition (rework/repair, scrap, etc.).

3.5.6. Corrective Action. The contractor shall promptly act to correct nonconforming materials and conditions to satisfy contract or order requirements and prevent the recurrence of this problem.

3.5.7. Handling, Storage, Preservation, Packaging and Shipping. The contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.

3.5.8. Government Quality Assurance. Any in-process inspections performed by the Government shall be conducted in a manner consistent with contractor’s commercial practices.

3.6. Requirements for Configuration Management.

3.6.1. Product Definition Information. The Product Definition Information describes a product’s performance, functional and physical attributes, including the requirements and design information (specifications, drawings, design descriptions and software). Interfaces, including interfaces with other products, are also documented in the Product Definition Information. The Product Definition Information shall be specified by the Contractor’s Commercial Item Part Number (CIPN).

3.6.2. Configuration Change Process. The contractor shall establish a system for managing the configuration changes to the CIPN baseline.

3.6.3. CIPN Configuration Baseline. The Contractor’s Commercial Item Part Number (CIPN), as defined by the Contractor’s specifications, drawings, catalog page, etc, at the time of award of this contract, shall form the Configuration Baseline for this acquisition.

3.6.4. Configuration. Each unit, as developed/built and delivered, shall conform to the cited CB and (if applicable) and any subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO).

3.6.5. Application Management.

3.6.5.1. Application Management. The Commercial Item Part Number (CIPN) Application Management is the responsibility of the Contractor. The Contractor shall inform the Government of all Major changes that affect the Commercial Item Part Number (CIPN) specified in paragraph 3.6.1. A Major change is defined as any change that will impact any of the following conditions of the CIPN with regards to its form fit function or Interface (F3I) or logistical attributes:

(a) Overall performance and Form, Fit, Function and Interface (F3I) Characteristics.
(b) Reliability, Maintainability and Survivability
(c) Electromagnetic Interference (EMI), air worthiness certification, or other pertinent requirement.
(d) Safety
(e) Support, operational and training requirements
(f) Impact on Technical Manuals, Repair Parts and Special Tools Lists (RPSTLs), DMWRs,
Provisioning Parts List (PPL), etc.
(g) Impact on Cost and/or Schedule.
(h) Impact on test equipment, support equipment and associated software.
(i) Software.

3.6.5.2. Application Activity. The Government is an Application Activity (AA) for changes that affect the Contractor’s CIPN. The Government does not possess document change authority over the changes affecting the CIPN. As part of the Government’s Application Management process, the Government as AA does have a right to review or be notified of changes made by the Contractor that will affect any of the conditions identified in paragraph 3.6.5.1. Any changes that affect these conditions shall be submitted for Government review or notification IAW the procedures outlined below (para 3.6.5.3). Configuration changes not directly affecting the configuration baseline conditions identified in paragraph 3.6. 5.1 do not require Government review or notification.

3.6.5.3. Departures from CB. Changes that affect the CIPN conditions cited in paragraph 3.6.5.1 shall be submitted for Government review or notification in accordance with this SOW and the DD Form 1423 for DI-MISC-80711A. Upon receipt of notification, the Government will review the impact of the change.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Original Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0002
A
TDP X TM OTHER
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

Control, Intercommunication Set

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
E001
Scientific and Technical Reports
Configuration Management
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80711A
SOW Para 3.6.5.3
RDER-PRA-AB
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

ASREQ
SEE ITEM 16

b. COPIES

8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

SEE ITEM 16

Reg

Repro

16. REMARKS: Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in SOW 3.6.5.3.1- (Request For Change documents (RFCs)).

The contractor shall prepare and submit RFCs for Government review in accordance with the SOW section for Configuration Management (Para 3.6.5.3) when there is a Major change (See SOW para 3.6.5.1) to or departure from a contractual baseline.

All RFCs for Major changes shall be submitted for Government review or notification IAW para 3.6.5.3 within 5 working days of Contractor approval and prior to presentation for acceptance, but not later than 30 days, of any such product. The Government has up to 90 days for review of the change(s). During this review of the changed configuration the Contractor’s performance review on deliveries shall not be affected.

All deliveries shall be in digital format. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM readable by computers running Microsoft Office 2000 or later suite of applications (MS Word, MS Excel, MS PowerPoint, and MS Project, etc.).

Alternative delivery media may be discussed with the Contracting Officer prior to delivery.

RDER-PRA-AB

PCO

ACO

QAR

15. TOTAL
0
4
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Erick L. Sjoblom

RDER-PRA-AB

Mechanical Engineer

12 Jan 2017
Tuan Pham

RDER-PRA-AB

Chief, Avionics Branch 12 Jan 2017

Based upon DD Form 1423-1, 1 Jun 90

3.6.5.3.1. Request For Change (RFC). The Request For Change (RFC) includes both the engineering change and the supporting documentation by which the change is described and suggested. An RFC describes changes to the CI/CSCI and associated Contractor documents and data (if applicable) that are affected by the proposed engineering change. The RFC also describes a full impact analysis of the effect of the change on the logistics, interface, design, cost and schedule requirements of the CIPN.

3.6.5.3.1.1. RFCs could be generated as any of the following categories: Change Directive; Change Request; Engineering Change Package; Engineering Change Proposal; Engineering Change Request; Engineering Change Memo; Engineering Change Notice.

3.6.5.3.1.2. RFCs may contain some of the following elements:

(a) A unique change identifier; identification of originating organization and responsible individual.
(b) Change classification,
(c) Identification of product(s) (including components and interfacing products) affected by the change.
(d) Change description and scope (including effects on performance, operation, maintenance, servicing, operation and maintenance training, repair parts, support and test equipment, cost, schedule, and any other effect on physical, functional, and logistics characteristics of the CIPN).
(e) Reason and justification for the change and consequences of not incorporating the change.
(f) Estimated cost increase or savings.
(g) Change implementation (and effectively) and impact on delivery schedule.
(h) Criteria, if any, for retrofitting products.

3.6.6. Contractor-approved changes that adversely impact any of the CIPN conditions listed in paragraph 3.6.5.1 may require re-evaluation by the Government of the CIPN. Re-evaluation may include operational testing re-assessment or re-assessment of the logistics impact of the proposed change. An approved change to the design of the CIPN must be verified to ascertain that the CIPN has achieved the functional attributes and requirements specified in the baseline Product Definition Information (CIPN) and that it is adequate for its intended purposes. The Government is not obligated to accept any CIPNs that no longer meet the Government’s requirements as established by the CIPN at the time of contract award. In effect the Government is not obligated to procure any future items that do not meet the configuration baseline CIPN requirements of this contract.

Date: 18 Jan 2017 1 image1.wmf

File details come from the government source that posted it. Updated .