TECHNICAL REQUIREMENTS

FOR

ARMS #10432.3:

REPARABLE SPARE PARTS FOR THE ELECTRIC POWER PLANT III U/W PATRIOT

TABLE OF CONTENTS

APPLICABLE DOCUMENTS3
CONFIGURATION BASELINE3

SPECIAL INSTRUCTIONS…...………………………………………………………………………………

PACKAGING5
Wood Packing Material5
Commercial Packaging5
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-17
CDRL List7
Individual CDRLs7

APPLICABLE DOCUMENTS

Military and Federal Standards

MIL-STD-130N w/Change 1
Identification Marking of U.S. Military Property
MIL-STD-129R
Military Marking for Shipment and Storage

Military and Federal Specifications

N/A

Other Documents

N/A

Commercial Documents

ISPM Number 15
Guidelines for Regulating Wood Packaging Material in International Trade
ASTM D3951
Standard Practice for Commercial Packaging
ANSI/ISO/ASQ(E)Q 9001-2008
American National Standard, Quality Management Systems-Requirements

Data Items

DI-MISC-80711A
Scientific and Technical Reports -- Configuration Control
DI-MISC-80711A
Scientific and Technical Reports – IUID Marking Diagram/Instructions

CONFIGURATION BASELINE

The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.

NSN
Nomenclature
Part Numbers/Drawings
5945-01-577-2614
RELAY, HYBRID
9908-501

Configuration. Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). Configuration changes not directly effecting the configuration baseline do not require Government approval prior to incorporation, but must be documented by the contractor and shall be made available to the Government upon request.

Departures from CB. No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with DI-MISC-80711A and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO. Configuration Control shall be affected by the Configuration Control Documents (CCDs) as follows:

Engineering Change Proposal (ECP) includes both the engineering change and the supporting documentation by which the change is described and suggested. An ECP describes changes to the CI/CSCI and associated Government documents and data that are affected by the proposed engineering change.

A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, (one NOR per document) following approval of an ECP. The NOR is submitted as part of the ECP and is used to determine any Technical Manual (TM) impacts. The Government must be notified of any part changes in order to update the proper TMs.

A Specification Change Notice (SCN) is used to delineate the exact change(s) in a specification that will be distributed to users when the ECP is approved. The SCN is submitted as part of the ECP. The SCN is not used for a military or federal document, only a Request for Waiver can be used for those documents.

Value Engineering Change Proposal (VECP) is the same as an ECP except there are proposed cost savings for the program. The contractor shall follow the guidance in Section I of this contract for VECPs.

Request for Waiver (RFW) describes a departure from configuration documentation for a specific number of units or period of time. Contractor shall identify the impact of the RFW on performance, operational readiness and logistics support of the affected CIs. The Government will require compensation for any RFW.

Contractor shall provide all supporting program or cost data with the CCD. The contractor shall uniquely and sequentially identify (including the use of the contract number) each ECP, VECP, NOR, SCN or RFW. The identification number should use less than 16 characters.

Identification of Authorized Personnel. The contractor shall identify to the PCO, Administrative Contracting Officer (ACO), and the technical office identified on the DD Form 1423 for DI-MISC-80711A, the name(s) of the official(s) of its organization who are authorized to submit CCDs 30 Days after Contract (DAC).

Documentation. The contractor shall document by serial number each products configuration, applicable documentation, maintenance support requirements and spares in relation to the contractor’s configuration baseline. The data in use shall be available for government review and use.

Use of CB Data. The contractor shall assure that all necessary contractor’s activities have access to and use of the contractually specified configuration baseline(s), approved changes and departures, and effectivity data. The data in use shall be available for government review and use.

SPECIAL INSTRUCTIONS

Requirements for Item Marking (Commercial Off The Shelf Items). Part Number Marking. Each item delivered under contract, along with each assembly, sub assembly, and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, etc., need not be marked. This requirement should be entirely met by the contractor’s standard commercial marking. However, if there is any question about marking it shall be directed to the Contracting Officer for resolution.

Requirements for Final Inspection and Test . The contractor shall implement and maintain a Final Inspection and Test System that meets or exceeds the requirements established below. These requirements are commonly accepted practices employed by industry.

Quality System . The contractor shall establish/maintain an effective inspection and test system for final inspection and test of completed products IAW ANSI/ISO/ASQ(E) Q9001-2008.

Inspection and Testing Procedures . The contractor shall utilize documented procedures for final inspection and testing of finished products to ensure that all contract requirements are satisfied.

Inspection and Testing . The quality system shall assure that all final inspections and tests required satisfying contract requirements are conducted.

Records . The contractor shall maintain adequate records of final inspections and tests to demonstrate that the product satisfies contract requirements.

Measuring, Testing, and Inspection Equipment . The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that finished products conform to contract requirements. These devices shall be calibrated against certified measurement standards that are traceable back to national/international standards.

Inspection and Test Status . The contractor shall maintain a system for the identification of the final inspection and test status of all products.

Nonconforming Material . The contractor shall establish and maintain a system for controlling material that does not satisfy contract requirements, including procedures for its identification, segregation, and disposition (rework/repair, scrap, etc.).

Corrective Action . The contractor shall promptly act to correct nonconforming materials and processes to preclude the recurrence of the problem and to satisfy contract requirements.

Training Requirements . The contractor shall identify/provide for the training needs of their personnel performing inspections and tests.

Handling, Storage, Preservation, Packaging, and Shipping . The Contractor shall establish, maintain, control, and be responsible for the procedures for handling, storage, preservation, packaging, and shipping to protect the quality of materials and to prevent damage, loss, deterioration, degradation, or substitution of products.

PACKAGING

Requirements for Packaging. Preservation, packaging, and marking shall be in accordance with (IAW) Standard Practice for Commercial Packaging ASTM D3951 and Section ‘D’ of the contract. Wood Packaging Material (WPM) shall meet the requirements below. Level of Preservation (LOP): Commercial, Level of Pack (LPK): Commercial, Quantity Unit Pack (QUP): 001. Marking shall be in accordance with MIL-STD-129P.

Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Guidelines for Regulating Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.

All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).

All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.

Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.

Exhibit A SPRBL1-15-R-0041 Page 1

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL List

CDRL Data Line No.
DID Identification
Title
A001
DI-MISC-
80711A
Scientific and Technical Reports – Configuration Control

Individual CDRLs

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

TBD

TDP X TM OTHER

D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
Reparable Spare Parts for the Electric Power Plant III U/W PATRIOT
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

Scientific and Technical Reports
Configuration Control
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80711A
TBD
RDER-PRP-G

INSERT

7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

IN

DD

ASREQ
SEE ITEM 16

b. COPIES

SECT. B

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

A

SEE ITEM 16

Reg

Repro

16. REMARKS:

Data Item Description DI-MISC-80711A: Delete Block 10 instructions entirely and follow instructions in SOW found at para 3.2. The contractor shall prepare and submit Configuration Control Documents in accordance with the SOW section for Configuration Control (Para 3.2.) when a change to or departure from a contractual baseline document is deemed necessary. All deliveries shall be in digital format. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office. Alternative delivery media may be discussed with the Contracting Officer prior to delivery.

RDER-PRP-G

PCO

ACO

QAR

* 1 COPY VECP ONLY.

15. TOTAL
0
6
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Scott Mahoney

RDER-PRP-G

Product Realization Engineer

2 / 19 / 15
Tuan T. Pham

RDER-PRP-G

Chief, PRD Branch 4 / 15 / 15