I.P-2 SOLE SOURCE_Signed.pdf

PDF 887 KB Posted

Attached to
NUTRUNNER
Solicitation number
SPMYM426Q3622
Issued by

About this file

This is a Memorandum to the File documenting the justification for use of other than full and open competition for a simplified acquisition threshold purchase.

The acquisition is for electric wrenches from Atlas Copco (contact: Christopher Hof, 561-709-9763, located at 3301 Cross Creek Parkway, Auburn Hills, MI 48326) with a required delivery date of July 31, 2026. The wrenches are intended for research and development purposes to improve tooling. The contracting officer selected two justification bases for the single-source procurement: Brand Name (Part B) and Other Reasons (Part A.3). The rationale centers on previous wrench purchases that failed to meet required performance specifications for the calibration program, specifically lacking the necessary accuracy, reliability, and repeatability. Market research was conducted to identify alternative commercially available products capable of meeting program requirements, and Atlas brand wrenches were identified as potentially satisfying the required performance specifications. The procurement will enable additional research and development to identify a reliable, repeatable, and accurate tool for shop operations. The document is approved for contracting by Thomas Kailie, M., with a digital signature dated August 5, 2026.

View the file

Other files

File Type Posted
II.S-1 Solicitation - SPMYM426Q3622.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM TO THE FILE

SUBJECT: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION

UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE

Manufacturer or Service Provider: ___________________________________________________

Point of Contact: __________________________ Phone Number: ________________________

Street: _________________________________________________________________________

City: _______________________ State: ________________ Zip Code: ________________

Dealer Representative (if applicable): ________________________________________________

Point of Contact: __________________________ Phone Number: ________________________

Street: _________________________________________________________________________

City: _______________________ State: ________________ Zip Code: ________________

Estimated Cost

Required Delivery Date or Period of Performance: _________________________

Provide a description of the item or service required, to include its intended use. If applicable, provide manufacturer part number.

Atlas Copco

Christopher Hof 561-709-9763

3301 Cross Creek Parkway

Auburn Hills MI 48326 n/a

7/31/2026

Electric wrenches for R&D to improve tooling.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING: (select all that apply):

A. ☐ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ☐ RESTRICTIVE RIGHTS

The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.

2. ☐ EXCLUSIVE LICENSING AGREEMENTS

The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

Explain the circumstances surrounding why the item or service is only available from the manufacturer or service provider.

OR

Provide evidence of the exclusive licensing agreement as an attachment to this document.

NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank.

3. ☐ OTHER REASONS

Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

B. ☐ BRAND NAME

Item required must be a brand name product, or feature of a product, particular to one manufacturer.

Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.

Previously purchased wrench has not met the performance specifications required for the calibration program. As a result, it hasn't been able to provide the accuracy, reliability and repeatability necessary to support the requirements.

Market research was conducted to identify other commercially available alternatives capable of meeting the program requirements. Based on this research, Atlas brand wrenches were identified as product that may satisfy the required performance specifications. Procuring the Atlas brand wrenches will enable me to do additional R&D to identify a reliable, repeatable and accurate tool for the shop.

C. ☐ UNUSUAL AND COMPELLING URGENCY

The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified: _______________________________

2. Explanation of why delivery/commencement of services by the date mentioned above is required:

Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.

3. If appropriate, include any additional pertinent information.

IV. CERTIFICATIONS/APPROVALS

A. Technical / Requirements Certification (Requiring Activity):

I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature: ___________________________________________ Date: ______________

B. Approval (Contracting Activity):

Contracting Officer’s Name: ____________________________________________________

Signature: ___________________________________________ Date: ______________

2026-08-05T14:45:30-1000
THOMAS.KAILIE.M.1630183550

File details come from the government source that posted it. Updated .