SPMYM4-15-Q-0617_Amendment_2.doc

DOC document 34 KB Posted

Attached to
PREFABRICATED STEEL SYSTEM PLATFORM Federal contract opportunity
Solicitation number
SPMYM4-15-Q-0617
Issued by
Defense Logistics Agency Land and Maritime

About this file

AMENDMENT 2

View the file

Other files for this federal contract opportunity

Other files attached to PREFABRICATED STEEL SYSTEM PLATFORM, newest first.
File Type Posted
Attachment_2_Top_View_SPMYM4-15-Q-0617.pdf PDF
AMENDMENT_1_SPMYM4-15-Q-0617.doc DOC document
12'_High_Stair_Platform_Attachment_1.pdf PDF
SPMYM4-15-Q-0617.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Jun-2015 02:00 PM to 22-Jun-2015 01:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from PLATFORM, PREFABRICATED STEEL SYSTEM12' X 13' X 12' TO BE MADE FOR DRYDOCK USEFORKLIFTABLE & CRANELIFTABLEWALKING SURFACE SHALL BE 1/4" STEEL DIAMOND PLATE DESIGNED FOR 125 PSF UNIFORM LOADBROW LOCATION WILL HAVE 6' WIDE LIFT OUT GATEALL MATERIAL SHALL BE HOT DIP GALVANIZEDSEE ATTACHMENT "12' HIGH STAIR PLATFORM" FOR ADDITIONAL SPECS. to PLATFORM, PREFABRICATED STEEL SYSTEM12' X 13' X 12' TO BE MADE FOR DRYDOCK USEFORKLIFTABLE & CRANELIFTABLEWALKING SURFACE SHALL BE 1/4" STEEL DIAMOND PLATE DESIGNED FOR 125 PSF UNIFORM LOADBROW LOCATION WILL HAVE 6' WIDE LIFT OUT GATEALL MATERIAL SHALL BE HOT DIP GALVANIZEDSEE ATTACHMENT "12' HIGH STAIR PLATFORM" FOR ADDITIONAL SPECSHAND RAILS TO BE ROUND AND 2 INCHES IN OUTSIDE DIAMETERDISTANCE FROM GROUND TO START OF STAIR STRINGERS MUST BE 7 TO 9 INCHES. SEE ATTACHMENT "TOP VIEW" FOR ADDITIONAL SPECS..

(End of Summary of Changes)

File details come from the government source that posted it. Updated .