N4523A91793000
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Post revised specifications regarding 4 point pick and configuration.
2. Extend the response date to 19 September 2019 at 0600 AM Pacific time.
All other terms and conditions remain the same
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X SPMYM219Q2377
X 9B. DATED (SEE ITEM 11)
25-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Sep-2019
CODE
DLA MARITIME PUGET SOUND
ATTN: SUE PETERSON
467 W STREET
BREMERTON WA 98314-5100
SPMYM2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SPMYM219Q2377
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Sep-2019 06:00 AM to 19-Sep-2019 06:00 AM.
The following have been added by full text:
REVISED SPECIFICATION
Current:
Manufacture approved lifting attachment for lifting of the forklift that accommodate standard rigging gear (e.g., shackles, wire rope pendants, etc.) in a simple arrangement (e.g., 4 straight wires to a common pick point directly above the CG) without interference to ensure the pad eyes are loaded in the plane of the pad eye. Each pick point shall be capable of holding 1/2 of the total weight of the forklift with the impact of sling angles considered.
Orientation of lifting attachment points and proposed rigging arrangement shall be such that the padeyes are loaded in the plane of the padeye (±5°) or shall have a professional engineer’s evaluation verifying the padeyes ability to support a side-load. Lifting attachment points shall be clearly identified on the equipment or within OEM operating manuals
Replacement:
Forklift must have a means for lifting the machine with a crane. Provide OEM integral lift accessories (lift lugs) suitable for lifting the machine with a crane using common lifting gear, such as shackles and slings. Lift lugs shall be clearly identified with a crane hook symbol or other suitable marking on the equipment or within the OEM operating manuals that clearly identifies lift lugs. Custom designed lifting accessories added to the machine after manufacture to satisfy this lifting requirement must comply with OSHA 1926.251(a)(4).
Pre-award Deliverables:
Provide:
- Unladen weight of the machine.
- Working Load Limit (WLL) for each lift lug.
- Location of the machine center of gravity in relation to either front or rear lift lugs.
- Horizontal distance from front to rear lift lugs.
- Vertical distance between front and rear lift lugs.
- Distance between front lift lugs, and distance between rear lift lugs.
- Photos of actual lift lugs installed on the machine.
(End of Summary of Changes)