8234-1775_ADDITIONAL_DATA.pdf

PDF 150 KB Posted

Attached to
SPMYM2-18-Q-3975 Federal contract opportunity
Solicitation number
SPMYM2-18-Q-3975
Issued by
Defense Logistics Agency Land and Maritime

About this file

ADDED DATA

View the file

Other files for this federal contract opportunity

Other files attached to SPMYM2-18-Q-3975, newest first.
File Type Posted
8234-1775_CDRL.pdf PDF
18-Q-3975.docx DOCX document
8234-1775_SPEC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blower, with Eductor, 7May18 Figures, NO SPEC.doc

7 May 2018 Page 1 of 3

Figure 1: Silencer construction detail

A B C D A Perforated sheathing B Wire Mesh Spacer C Fiberglass Cloth D Fiberglass Insulation

Figure 2: Inlet Transition

7 May 2018 Page 2 of 3

Figure 3: Screen Construction. Screen dimensions, thickness, flange details, bolt holes, etc. are detailed separately in the specification. On some screens, slotted bolt holes are required.

Fan Intake Bellmouth

Screen

Correct Incorrect

7 May 2018 Page 3 of 3

Figure 4: One possible arrangement for the major components of the blower is shown. This Figure is not to scale and does not dictate the size, shape, design, or arrangement of components, except the dimensions shown are mandatory requirements. Forklift slot dimensions are nominal. Pipe, hose, and valve supports are not shown.

File details come from the government source that posted it.