SPMYM2-20-Q-2847 (SYSTEM SPECIFICATIONS) Heat Induction System.pdf

PDF 284 KB Posted

Attached to
HEAT INDUCTION SYSTEM, 50KW UNIT Federal contract opportunity
Solicitation number
SPMYM2-20-Q-2847
Issued by
Defense Logistics Agency Land and Maritime

View the file

Other files for this federal contract opportunity

Other files attached to HEAT INDUCTION SYSTEM, 50KW UNIT, newest first.
File Type Posted
SPMYM2-20-Q-2847 (SOLICITATION) HEAT INDUCTION 50KW UNIT.pdf PDF
SPMYM2-20-Q-2847 (CDRLS) Heat Induction System.pdf PDF
SPMYM2-20-Q-2847 (SSJA-REDACTED) Heat Induction System.pdf PDF
SPMYM2-20-Q-2847 (SALIENT CHARACTERISTICS) Heat Induction System.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification for Heat Induction System Project #009-310

17 Jun 2020

1 SCOPE

This specification reflects those characteristics that are essential to the minimum needs of the government for Heat Induction System. The scope of work shall include the “Turn-Key” installation, operational start-up, and operational testing, as specified herein. It is the government’s intent that a single (primary) contractor be awarded this contract and be responsible for the accomplishment of all work detailed by this specification.

2 APPLICABLE DOCUMENTS

The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of an invitation for bids or a request for proposals shall apply.

National Fire Protection Association (NFPA)

NFPA 54 National Fuel Gas Code NFPA 70 National Electric Code NFPA 79 Electrical Standards for Industrial Equipment

Code Of Federal Regulations

29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment 29 CFR 1926 Safety and Health Regulations for Construction

(Application for copies should be addressed to Superintendent of Documents, Government Printing Office, Washington, DC 20402)

Washington State Administration Code (WAC)

WAC 173-60 Maximum Environmental Noise Levels

International Commission on Non-Ionizing Radiation Protection (ICNIRP) ICNIRP 1998 Guidelines for limiting exposure to time-varying electric, magnetic, and electromagnetic fields (up to 300 GHz)

This document is available at http://www.icnirp.de/documents/emfgdl.pdf.

2.1 SAFETY REQUIREMENTS

• Safety Requirements for the Trident Refit Facility, Bangor Site

A copy of this document is attached to this specification (See Enclosure 1).

2.2 ADDITIONAL SAFETY REQUIREMENTS In addition to the safety requirements specified in Paragraph 2.1, the following is requisite:

2.2.1 The equipment and its component parts shall be in compliance with applicable CFR 29, Part 1910 Regulation and Standards. By definition, any equipment will be deemed acceptable and approved by TRF, Bangor Site if it meets specific OSHA conditions outlined in OSHA Part 1910; Subparts "O" and "S". Specifically, equipment will be "Accepted" by TRF, Bangor site if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party). An NRTL certification report shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report or documentation mounted on the equipment (which acknowledges it is NRTL certified) shall be provided.

2.3 ENVIRONMENTAL COMPLIANCE REQUIREMENTS

• Environmental Compliance Requirements for TRF as specified by NAVFAC NBK Bangor, PRB41 Environmental Division.

2.4 GENERAL ENVIRONMENTAL REQUIREMENTS

2.4.1 Hazardous Material Control shall include the following:

2.4.1 Estimated Contractors Hazardous Material Inventory (CHMI) Table provides quantities of each hazardous material to be used on this project. Copies of all SDS's will be submitted to the Base Environmental Office (BEO), NAVFAC PRB41 Environmental Division, which is located at Bldg. 7001. All processed and accepted SDS information must be kept on site where the work is being performed.

2.4.1.2 Contractor shall not use Hazardous Material (HM) composed of any of the following chemicals or substances: Leads, chromium, mercury, phenols, trichloroethylene, chlorofluorocarbons, halon, PCBs, asbestos, silica sand (for use as blasting agent), Class I ODS, radioactive materials or instruments capable of producing ionizing radiation, and chemicals listed in 40 CFR 355.50 Appendix B.

2.4.1.3 If additional HM is required for this project, an SDS shall be submitted to the BEO for approval before the HM is brought on board Naval Base Kitsap Bangor. The contractor shall not bring on board Naval Base Kitsap Bangor any HM until approved by the BEO. All containers of hazardous material shall be resealed, placed in a secure area while on base, and transported off base for reuse of material at other contractor projects. The Contractor shall not generate any unnecessary contractor generated hazardous or dangerous waste on this project.

2.4.2 If hazardous or dangerous waste is to be generated via the project, Waste Control measures must be implemented and at a minimum must include the following:

2.4.2.1 A trained individual from the shop or contractor with a current Waste Originator certification must be present for each shift that hazardous waste is produced.

2.4.2.2 The shop or contractor shall submit completed NBK Bangor Waste Information Specification (WIS) forms for all waste, hazardous and non-hazardous, expected to be encountered during the course of this project. The BEO will provide final waste designation along with WIS instructions. If additional wastes are produced after this plan is approved, waste is encountered not identified, or changes occur to waste streams that have already been assigned a WIS number, a new or updated WIS's for each waste stream must be submitted to the BEO for designation.

2.4.2.3 A hazardous waste label must be affixed to the appropriate container upon the first addition of waste. If more than 55 gallons of Dangerous Waste (DW) or 1 quart of Extremely Hazardous Waste (EHW) is produced, the date must be filled in on the label. All containers must be under the control of the shop and located in the same area the waste is generated.

3 REQUIREMENTS:

3.1 ENVIRONMENTAL PERMITTING REQUIRMENTS. The new Heat Induction System shall be procured and put into operation in accordance with applicable federal, Washington State and Puget Sound Clean Air Agency (PSCAA) air quality regulations, including but not limited to 40 CFR 1039 (see paragraph 3.5.2) and PSCAA Regulation I, Article 6 – New Source Review. The contractor shall provide to the Government all necessary documentation to determine whether the portable, skid mounted, self-contained 4,000 CFM Vacuum System will require an air permit from PSCAA or a formal notification of intent to operate to PSCAA.

3.1.1 Upon contract award, the contractor shall provide to the government all pertinent Heat Induction System technical data to include brochures of the make and model of equipment being supplied, assembly sketches of the overall project design with critical dimensions, sketches (with dimensions) of equipment to be provided, vendor data regarding intake and exhaust filtration systems and ventilation filter and pre-filter capture efficiencies, design system intake and exhaust airflow (in cfm), design system intake and exhaust airflow ducting, and other technical information related to the design as necessary, for submittal (if deemed necessary) of the PSCAA Notice of Construction (NOC) permit application in accordance with PSCAA Regulation I, Section 6.03.

3.1.2 If required, the government will prepare and forward the permit application package to PSCAA for approval based on the contractor’s equipment design information. The government shall be responsible for associated permit application fees. Final design approval and construction work in accordance with this contract may not commence until final permit approval is received. Final project and equipment design shall include features as necessary to comply with federal, state, and local environmental regulations and the conditions of the approved permit.

3.2 GENERAL DESCRIPTION OF SYSTEM - This specification covers the minimum government requirements for a “Turn-Key” Heat Induction System.

• The main circuit board must continuously monitor the range between 18 kHz and 40 kHz, and shut down the system if the frequency goes outside these limits.

• The system shall continuously monitor the resonance in the main circuit, comparing the voltage and current. If the resonance ceases to exist (because of frequency changes) the unit shall shut down.

• The system shall monitor for the following problems, and shut down if one is encountered:

o Cable cut (a short) o Cable breakage o Electrical short circuit in the equipment o Leakage from cooling water inside the equipment o Water flood in working area

• The generator unit shall shut down and prevent voltage from leaving the generator if:

o The voltage on the transistor is too low o There is too much current flow in the generator o The voltage on the generator is too high o The incoming voltage to the generator is too high o There is a high-frequency fault due to failure in the induction head or condensator o There is a low-frequency fault on the condensators, induction head, or generator output o There is a phase fault on the incoming power supply to the generator o There is a leak to ground (earth-leakage fault)

• The system shall be operable by human manipulation or robotic crawler.

3.3 WORK INCLUDED - The Contractor shall be responsible for the following:

• Design, manufacture, test and groom all equipment required to provide a complete system and in accordance with the requirements specified herein.

• All shipping, and crating costs associated with the transport, delivery, and unloading of said equipment specified herein.

• Complete documentation and organization of all technical data which applies to the operation, maintenance, repair and testing of the specific equipment.

• Set-up and grooming of the specified equipment with the features identified in this specification. This includes connection of the equipment to required available utilities. Provide start-up and operational testing of all said equipment.

3.4 WORK NOT INCLUDED - The government/receiving activity will provide:

• Air, electrical and other utilities services (within 50 feet) as required for the proper operation of the equipment unless otherwise stated herein.

3.5 CONDITIONS OF SERVICE AND PERFORMANCE - The following service and operational conditions shall apply to the equipment delivered under this specification.

3.5.1 Environmental Conditions – The specified system will be operated in an operated in a salt and dust laden outdoor marine industrial environment, subject to high winds, driven rain, sleet and snow, and shall be capable of continuous operation over an extended period of time with minimal maintenance and upkeep. The unit shall also be designed to operate in a non-air conditioned manufacturing building in an industrial environment.

• Temperature Range: 15 to 110 degree F

• Relative Humidity: up to 100% Non-Condensing

3.5.2 Electrical - The proposed system shall not require more than 125 AMPS (100 Amps computed FLA) of 480 VAC, 3-phase, 60 Hz electrical power, in its fully configured and operational state. Transformers will not be used for this project.

3.5.3 Water Supply – The equipment shall be operable with potable water at 10 gpm and 40 psi or less.

3.5.4 Compressed Air - Compressed air available for air-actuated mechanisms is 90 pounds per square inch gage and 100 cubic feet per minute (nominal), and air source is available within 50 feet of new equipment installation location. If the proposed system requires more air than indicated above, the excess capacity shall be provided as part of the equipment. Any proposed compressed air system shall include a regulator(s) and a filter(s) with an automatic drain.

3.5.5 Emissions – If any emissions are projected to be generated by this equipment package, then the contractor and his subcontractors must submit all known and/or requested information to NAVFAC PRB41 Air Program Manager who is located at NBK Bangor, Bldg. 7001, for regulatory evaluation, consideration, and action prior to initiating any equipment installation at NBK Bangor.

3.6 GENERAL EQUIPMENT REQUIREMENTS:

3.6.1 Standard, Off The Shelf Components - All materials and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service except as required for factory testing.

Standard, off the shelf components with proven reliability shall be used wherever possible to increase performance reliability and reduce costs. The system components shall be one of the manufacturer’s current production models which, on the day this solicitation is issued, has been designed, engineered and sold, or is being offered for sale through advertisements or manufacturer’s published catalogs or brochures. System components such as a prototype unit, pre-production model, or experimental unit DO NOT qualify as meeting this requirement. The system shall be complete, so that when connected to the utilities identified herein, it can be used for the function for which it is designed and constructed.

3.6.2 Painting - All surfaces shall be painted in conformance with the manufacturer’s standard practices and good workmanship. Painting shall result in a highly wear-resistant finish, which guarantees continued protection to the surfaces covered against the specified environment under all service conditions. The manufacturer’s standard color shall be provided. Lead base or chromium base paints are prohibited.

3.6.3 Caution - Warning Plates – Corrosion and UV resistant “Caution” or “Warning” plates shall be securely attached to system components in visible locations, with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the plates.

3.6.4 Identification Plate - Corrosion and UV resistant identification plate shall be furnished with the system. A nameplate shall be affixed to each major component of the system showing the manufacturer’s name, equipment model, year of manufacture, and any other pertinent information for identifying the part as a unique component of the system.

3.6.5 All Electrical Components including motors, starters, relays, switches, and wiring shall conform to and be located in accordance with the applicable NFPA, NEMA, and ANSI standards for the intended application.

3.6.6 Motors - Motors (if required) shall be rated for continuous duty. Motors shall be equipped with ball bearings of the sealed and permanently lubricated type. All electrical motors shall meet NEMA-MG1 requirements.

3.6.7 Audible Noise Level - During normal operation, the dust collector assembly shall not produce noise levels greater than 84 dB (A) as measured on the “A” scale and 84 dB(C) as measured on the “C’ scale, at any point three feet from the unit of standard sound level meter as slow response per 29 CFR 1910.95, Occupational Noise Exposure Standard, paragraph 4.1.1, for noise level testing.

3.6.8 Emergency Stop Button – Each system shall be provided with an emergency stop button at the operator’s station. This stop button shall be the mushroom type, shall be colored red, and shall be labeled as such. When activated, the emergency stop button shall disconnect all electrical power to the equipment such that the all operations or functions will immediately stop or cease.

3.7 EQUIPMENT TO BE PROVIDED – One (1) Heat Induction System shall include the following:

3.7.1 A Heat Induction System heat induction system, with accessories needed to reach 300’ from the base unit and remove 5/8” thick tile from steel substrate in a 20cm wide path, and to remove paint from the interior 5cm of 90 degree angles of I-beams and C-channels. The heat induction system must be provided with programming and configuration accepted by the USN (documentation must be provided with quote), with current/upgraded computer display and processor.

3.7.2 One piece induction generator for removal of paint, scale, and adhesives, with equipment for hand-held use.

3.7.3 Control system enabling control of frequency, temperature and heat penetration. The control shall limit temperature of the bulk temperature of the substrate to 400 degrees F. and shall be capable of limiting temperature excursions anywhere in the substrate (directly under the head or elsewhere) between 400 degrees F to 650 F maximum for more than 20 seconds.

3.7.4 Input 440/480V, 50-60 Hz, 3 phase 100-150 Amp; Output 50 kW at 100% power.

3.7.5 Portable wheeled induction generator with lift points, not to exceed 475 lbs, which can be easily moved by two people.

3.7.6 Induction generator with a maximum size of 32”L x 24”W x 32”H, must be small enough to navigate scaffolding and support structures, with a footprint not to exceed 100 square feet.

3.7.7 Dual mode power control with manual and automatic induction coil power shutoff fail safes, with pass code protection.

3.7.8 OEM shall provide technical support by telephone from 6:30 a.m. to 3:00 p.m. weekdays.

3.7.9 System shall have a fault control panel warning system.

3.7.10 System shall be capable of producing an EMF field to penetrate and remove coatings or surface treatments greater than ½” thick.

3.7.11 System shall be NAVSEA approved to meet radio frequency interference (RFI) in gamma detection and refueling load cell alarm tests.

3.7.12 The Heat Induction system shall consist of the following components:

3.7.12.1 One (1) 50KW base power (current design) and control unit to support the processing heads. This unit, when used with the options specified and all required pumps and ancillary equipment, shall be capable of operating the induction process head at 300 ft. or more from the base unit.

3.7.12.2 One (1) heat induction process head (and any related equipment required for operation, such as “whip extensions”) capable of removing the following materials at or above the following rates on the specified materials, in a 20 cm wide path for 80% duty cycle with 500 hrs. MTBF:

3.7.12.2.1 Fast Clad paint, 30 mil thick, at 2.49 sq. ft./minute.

3.7.12.2.2 Non-skid deck coating, 100 mil thick, at 0.54 sq. ft./minute.

3.7.12.2.3 Navy sound tile 5/8” thick, at 0.147 sq. ft./minute.

3.7.12.3 Power and cooling cabling appropriate for 80% duty cycle to provide process operations to 300 feet from the base unit.

3.7.12.4 Water booster pump, valves, fittings, and gauges appropriate for 80% duty cycle required to extend the processing range to 300 feet from the base unit.

3.7.12.5 One (1) 4:1 hand transformer with capacitor and whip end (15 ft).

3.7.12.6 One (1) 10 cm standard flat shape coil (for the process head) for 4:1 transformer, flat with wheels, capable of removing materials specified in paragraphs 3.7.12.2.1 through 3.7.12.2.3.

3.7.12.7 One (1) 20 cm standard flat shape coil (for the process head) for 4:1 transformer, flat with wheels, capable of removing materials specified in paragraphs 3.7.12.2.1 through 3.7.12.2.3.

3.7.12.8 Five (5) 65 ft. each extension cable package, main generator to disbonder.

3.8 CONTRACTOR SET-UP SERVICES TO BE PROVIDED - The specified equipment and all associated equipment shall be assembled, set-up and tested by the contractor in the area(s) designated as its functional work area by the Receiving Activity Point of Contact. The contractor shall provide all personnel, and supplies necessary for the complete set-up of the proposed system (except as noted elsewhere in this specifications). The Contractor shall contact the Receiving Activity Point of Contact with a proposed set-up schedule (at least one week before the proposed set-up schedule).

3.9 SET-UP SUPPORT SERVICES PROVIDED BY THE GOVERNMENT - The activity will provide the following in support of the installation:

3.9.1 Receiving Activity Point Of Contact - Upon contract award, the receiving activity designated as Trident Refit Facility, at NBK Bangor shall designate a Receiving Activity Point of Contact who shall be responsible for appropriate surveillance and coordination of all services to be performed under this contract. The Receiving Activity Point of Contact shall serve as the contractor’s primary contact for all interaction with Government activities.

3.9.2 Utilities - Reasonable amounts of water, shop air (80-90 psi) and electricity shall be made available adjacent (within 50 feet) to the assembly site at no cost to the contractor (for temporary use during the installation of the specified equipment). The Contractor shall be responsible for any costs incurred in connecting, converting and transferring the utilities to the work site.

3.9.3 Storage - Lay-down area will be provided within the vicinity of installation site for storage of Contractor materials and tools. The Government does not accept responsibility for security of Contractor’s materials or tools.

The area must be kept clean and orderly, free of rags, paper and other debris. Failure to maintain area in a clean condition may result in the loss of the area. The Contractor shall be responsible to restore the storage area to original condition after use.

3.9.4 Hazardous Waste Disposal - Please see Section 2.5.1

3.9.5 Non-Hazardous Waste Disposal – The contractor is responsible for disposing of all non-hazardous waste.

3.9.6 Start-Up Supplies – The contractor shall be required to furnish any and all start-up supplies in order to perform proper functional start-up of said equipment.

3.10 TECHNICAL DATA TO BE PROVIDED

3.10.1 Operator / Maintenance / Repair Manuals - The equipment shall be furnished with three (3) hard copies of the manufacturer’s standard Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s). The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/drives/controls supplied. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel. The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure. The vender shall provide critical spare parts for emergency equipment repair, a one-year supply of key consumable components, and a list of recommended consumable spare parts with reference to possible sources for spare parts procurement.

3.10.2 NRTL Certification Report - As outlined in paragraph 2.2.1

3.10.3 Technical Data for Potential Environmental Permitting Requirements – as outlined in paragraph 3.1.1.

3.11 WARRANTY - Supplies and services furnished shall be covered by a two (2) year warranty from defects in design, materials and workmanship. The warranty shall be the manufacturer’s standard commercial warranty, which shall conform to all the requirements of the contract. Acceptance of the manufacturer’s standard commercial warranty shall not minimize the rights of the Government under clauses in the contract, and in any conflict that arises between the terms and conditions of the contract and manufacturer’s warranty, the terms and conditions of the contract shall take precedence. The warranty period shall be for a minimum of 2 years. The warranty period shall commence from the date of acceptance. All warranty work shall be provided by a factory authorized distributer.

4 QUALITY ASSURANCE PROVISIONS

4.1 RESPONSIBILITY FOR INSPECTION - The Contractor shall be responsible for the performance of all inspection requirements (examinations and tests) as specified herein. The Government reserves the right to perform any of the inspections set forth in this specification, where such inspections are deemed necessary to assure supplies and services conform to the prescribed requirements.

4.2 RESPONSIBILITY FOR COMPLIANCE - All items shall meet all requirements of this specification.

The inspection(s) set forth in this specification shall become part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspections, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.

4.3 INSPECTION/TESTING AT ORIGIN - Basic performance tests (prior to shipment) shall be conducted by the manufacturer on the primary equipment and all associated equipment to the extent practicable, to demonstrate functionality, to ensure contract requirements are being met. The tests may be performed by the Contractor, either by personnel of their service organization directly, or by an independent testing agency. The contractor shall contact the government two (2) weeks before the completion of the manufacturing of the specified equipment. This shall allow the government the option of sending their technical representative(s) to witness the tests, and to ensure contract requirements are being met, prior to shipment of the unit to the government.

4.4 INSPECTION/TESTING AT DESTINATION

4.4.1 Initial Test and Grooming - The equipment delivered with the system shall be inspected by the Government for mechanical and electrical integrity as follows: All welds shall be inspected for integrity and appearance. Surfaces shall be examined for sharp edges and burrs. Fasteners shall be checked for tightness and if fixed to prevent loosening due to vibration. Paint will be checked for flaking and blistering. Electrical requirements shall be examined for compliance to the National Electrical Code, (NFPA 70/79). The fit of parts shall be observed, with particular reference to the interchangeability of those that are likely to require replacement. Faults will be duly recorded and presented to the contractor for rectification.

4.4.2 Operational Tests - Upon satisfactory completion of the tests above, the equipment shall be set up for operational tests and evaluation. The contractor shall demonstrate the ability of the equipment to perform as required in this specification. All equipment functions shall be exercised to the extent necessary to prove proper operation in accordance with specification requirements. The system shall function, without failure, for the duration of this test period. If a failure occurs during the test period, repairs shall be immediately affected by the Contractor, and the tests shall be restarted from the first test. Three failures without completion of the test period shall be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction, which requires remedial action to restore the system to full operation in accordance with contract specifications. The operational tests shall include the following:

4.4.2.1 Removal of Fast Clad Paint: Unit shall be tested to remove Fast Clad paint, applied to HY80 or HY100 per applicable NAVSEA requirements, at a minimum rate of 2.49 square feet per minute. The test area shall be at least nine (9) square feet.

4.4.2.2 Removal of non-skid coating: Unit shall be tested to remove 30 mil thick non-skid coating applied to steel deck plating per NAVSEA requirements at a minimum rate of 0.54 square feet per minute. The test area shall be at least nine (9) square feet.

4.4.2.3 Removal of sound tile: Unit shall be tested to remove 5/8” thick sound tile applied to steel plating per NAVSEA requirements at a minimum rate of 0.147 square feet per minute. The test area shall be at least nine (9) square feet.

4.5 PROVISIONS FOR REPAIR AND RETEST - In the event of a test failure, the contractor, at their discretion, may elect to correct the failed condition and request a retest of the system (vs. shipping the equipment back to the manufacturer for repairs).

4.6 FINAL ACCEPTANCE - Final acceptance shall be upon satisfactory completion of installation, inspection, start-up, testing, and training of said equipment system (as outlined in this specification).

5 DELIVERY

5.1 It is required that all goods and services provided by this solicitation be delivered prior to 120 days of contract award.

5.2 The Surveillance Officer shall be notified no less than 48 hours prior to the arrival at the site of the specified equipment and/or contractor personnel.

5.3 Material transportation from the manufacturer’s facility to the work site shall be the responsibility of the contractor. Limited secured storage areas at the facility will not permit the Government to store material for extended periods of time. Early shipment of materials, without the permission of the receiving activity shall be refused.

5.4 Packing Material - The use of shredded paper, whether newspaper, office scrap, computer sheets, or wax paper, in packing material for shipment to Navy activities, is prohibited.

5.5 It is the Government’s intent that the Contractor delivers a fully operational and functional system meeting the requirements stated herein prior to acceptance by the receiving activity and final payment by the government.

Delivery of this system shall occur when all deliverable items of this contract have been received, installed and made operational and the contractor has demonstrated and the receiving activity has confirmed that the system meets or exceeds the requirements set forth in this specification and is ready for Government use.

6 GENERAL NOTES

6.1 RESPONSE TO REQUEST - As a part of the response to this request, descriptive literature (in accordance with FAR 52.214-21) shall be furnished in sufficient detail to show that the proposed design will meet these specifications. Vendor submittals shall include brochures of the model being submitted, assembly sketches with critical dimensions, sketches (with dimensions) of all tooling provided, statements of compliance with specification, and performance statements with special attention to the key performance criteria stated herein.

6.2 ADMITTANCE TO THE WORK SITE:

6.2.1 Upon contract award, employees or representatives of the Contractor who require access to the Receiving Activity's facility at Naval Base Kitsap, Bangor (NBK, Bangor) shall be admitted to the work site only after they have been issued an appropriate Naval Region NW visitor security badge which is obtained at NBK, Bangor Pass & ID Office (located outside the NBK, Bangor Trident/ Main Gate).

6.2.2 Navy Region NW badge is required to gain access through the Operational Area Gate, or Waterfront Restricted Area, and is obtained through the on-line Base Authorization and Visit Request (BAVR) computer system. To request a Navy Region NW badge, Go on line to "https://www.bavr.cnic.navy.mil/NewRequest.ASPX", and submit a request for a badge, a minimum of five (5) business days prior to arrival. All requested information highlighted in red is mandatory. Type N/A for “Driver’s License Information”. The "Command you are visiting" is:

“Trident Refit Facility (TRF)” (or "NBK Bangor"). The “Company Name or Command” and “Work Phone” is your company/command information. The “Originating Command Security Officer Information” is Bruce Girkin, bruce.girkin@navy.mil. The "Sponsor E-Mail" for an on-line badge should be: aaron.k.peal@navy.mil (Aaron Peal, 360-315-1047, 360-471-8624 (cell)). In the "Purpose of Visit" box, please explain in detail the purpose of your visit, and include the Contract Number, the Receiving Activity Point of Contact (name and telephone number) and ALL the buildings/areas/piers you are visiting. The “Start Date” is the day you expect to pick up your badge (you cannot pick it up early, even if approvals are completed). The “End Date” is the last date of your visit. Also send a copy of the contract (or contract modification if the delivery date has been changed) to Aaron Peal at the e-mail address listed above. You will be notified at the e-mail address you provided, when all approvals have been completed. If the BAVR computer system doesn't work, try different search engines (“Firefox” search engine seems to work the best). If BAVR still doesn’t work contact the Receiving Activity Point of Contact or our security manager, Aaron Peal, 360-315-1047, 360-471-8624 (cell) to schedule a visit(s), and shall provide the following information:

* Full Legal Name

* US Citizen Status

* All Company Contact Information

* Contract Number

6.2.3 Visitors must show proof of US Citizenship (at the NBK Bangor Pass & ID Office, located outside Bangor’s Main Gate (Trident Boulevard), by having an original active US Passport, an "Enhanced Driver's License", or an unlamented official birth certificate.

6.2.4 Truck delivery personnel only need to show their Bill of Lading and show proof of US Citizenship (at the NBK Bangor Pass & ID Office) by having an original active US Passport, Enhanced Driver's License, or an unlamented official birth certificate. All deliveries must pass through the base Truck Inspection Station. All delivery vehicles are subject to inspection. Drivers should expect delays due to heightened security.

6.2.5 Contractor's vehicles requiring NBK Bangor Delta Pier/Waterfront Restricted Area access shall provide the following data to the Receiving Activity Point of Contact, who shall request a Strategic Weapons Facility, Pacific (SWFPAC) Delta Pier vehicle permit. These permits are issued by SWFPAC and are picked up (by the contractor) at the SWFPAC Pass & ID building (located next to the NBK Bangor Pass & ID Office, located outside Bangor’s Main Gate (Trident Boulevard)

* Company Name (must match the vehicle's registration):

* Vehicle Make:

* Vehicle Model:

* Vehicle Year:

* License Plate #:

* License Plate Issue State:

* Access Start/End Dates:

6.2.6 Notice: Persons who are currently on probation or parole from a felony conviction cannot qualify for security clearances, and will be denied access to the activity.

6.2.7 It shall be the Contractor's responsibility to collect, account for all identification passes issued to their personnel at the expiration of the contract or when access is no longer required. All NBK Bangor Pass & ID Office issued badges and identification passes must be returned back to the NBK Bangor Pass & ID Office no later than the expiration date.

6.2.8 Foreign Nationals or Affiliations - Foreign Nationals (non-U.S. Citizens) or persons affiliated with, or employed by, a foreign, or foreign owned company will not be granted access without proper NBK Bangor Commanding Officer's written approval. Please note that All NBK Bangor Command Foreign Nationals or Affiliations visit request must be submitted sixty (60) days prior to a requested visit date.

6.2.9 Identification. All Contractors shall clearly identify themselves as contactor personnel.

6.3 RESTRICTIONS:

6.3.1 Parking - Vehicles and equipment required by the Contractor to complete this contract must be registered with Security. Forms for obtaining vehicle passes and permits may be obtained from the Receiving Activity Point of Contact. Parking is available at or near the work site or at other authorized areas on the station. Contractor vehicles must be marked on the outside with the company name or logo or both. Failure to comply will result in ticketing and/or loss of vehicle privileges.

6.3.2 Regular Working Hours - All work is to be performed during TRF, Bangor Site's regular work hours from 6:30 a.m. to 3:00 p.m., Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturdays, Sundays, holidays, or outside the regular or specified hours/days, the Contractor shall submit a request to the Receiving Activity Point of Contact, for approval a minimum of two (2) working days prior to the anticipated work date. In no event shall a Contractor carry on work outside the hours and days specified in the contract without prior approval.

6.3.3 Restricted Colors – TRF, Bangor site uses the colors magenta and yellow to identify specially controlled materials. The Contractor is specifically prohibited from using magenta and yellow colored plastic wrapping materials or bags, tape, or other covering materials.

6.3.4 Radio Restrictions - Operation of privately owned citizens band or amateur radio equipment (receive and transmit) within the geographic limits of the activity is prohibited. All radio equipment installed in privately owned motor vehicles must be turned off upon entering the premises.

6.3.5 Contractor Electronic Devices – Use of such devices, including cell phones, and computers shall not be capable of photography or digital recording by contractor personnel at TRF, Bangor is restricted. This includes personally owned Portable Electronic Devices (PEDs) that are used for storing data, including but not limited to removable storage devices (e.g. memory sticks rewriteable CDs and DVDs, Zip and floppy disks). Contractors requiring such devices in the performance of this contract shall have the equipment inspected and approved by the PSNS & IMF Information Assurance office, located in Bremerton, WA. If this equipment is needed, it must comply with the photography regulations. Please contact Receiving Activity Point of Contact to make a request. Please allow at least 5 business days for required electronic devices to be approved.

6.3.6 Photography/Recording - Contractor personnel are prohibited from having personal reproduction equipment of any kind, including but not limited to photocopying, copying, and/or recording devices. This includes photographic equipment, tape recorders, or other recording devices in their possession while inside the Operations Area (OA). Contractors requiring the use of photographic equipment in TRF, Bangor Site spaces must request authorization through the IMF security office. Please contact the Receiving Activity Point of Contact to make a request.

6.3.7 Prohibited Items - The items listed below are prohibited (and includes any other item, which the possession of is prohibited by Federal, State or municipal law, Department of Defense or Department of Navy instruction directive or policy).

6.3.7.1 Weapons or other dangerous materials of any kind, including by not limited to firearms, ammunition, knives (blades longer than 3-inches), explosives, incendiaries, personal defense aerosols/sprays.

6.3.7.2 Alcoholic Beverages of any kind and illegal to include marijuana.

7 PERSONAL HEALTH AND SAFETY

7.1 The Contractor shall provide their employees with all necessary safety equipment during the performance of work on this contract, and ensure their employees follow safe work practices. All contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (i.e. hard-hats, steel-toe safety shoes, safety glasses and hearing protection). The Contractor shall provide all appropriate safety barricades, signs, and signal lights required to properly isolate the area of work.

7.2 All Contractors shall clearly identify themselves as contactor personnel.

7.3 Medical Treatment. Government emergency vehicles and medical personnel shall only be used in emergency situations affecting contractor personnel whose life may be in danger or who are seriously injured.

Government facilities may be used in these instances as the first point of treatment. Transfer to a non-Government medical treatment facility shall be made as soon as possible and as determined by attending medical authorities.

8 WORK SITE INFORMATION

8.1 Regular Working Hours/Shifts. Regular working hours is normally 8 hours (0630-1500), with a 30-minute lunch break, Monday through Friday. Working hour variations may be requested by contractor personnel, and approved by the Receiving Activity Point of Contact.

8.2 Holidays and Shutdown Periods. All shutdown periods, when directed by the Commanding Officer, are normally associated with holidays or inclement weather. Naval Base Kitsap policy is to continue operations during adverse weather. Severe weather may cause an electrical power outage, or snow, ice, or wind conditions may cause the base to remain closed. Other shutdown periods may be declared by Executive Order. Contact the Surveillance Officer regarding severe weather or Executive Order shutdown information. The contractor shall not be required to work during designated shutdown periods. Holidays observed by the contractor shall include all legal holidays observed by the Government. These holidays are:

New Year's Day Labor Day Martin Luther King Day Columbus Day President's Day Veterans' Day Memorial Day Thanksgiving Day Independence Day Christmas Day

8.3 Overtime is not authorized. Overtime is defined as hours worked in excess of the employee's normal workweek. The normal workweek is defined as forty (40) hours.

8.4 Nothing contained in the specifications shall relieve the Contractor from complying with applicable Federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits that may be required for the Contractor or Subcontractor(s) to perform a particular function, such as hazardous waste handling or disposal, for example.

ENCLOSURE 1

SAFETY REQUIREMENTS FOR TRIDENT REFIT FACILITY, BANGOR SITE

SCOPE

These specifications provide safety information and procedures required for any work performed at Trident Refit Facility (TRF), NBK Bangor Site. This does not include additional safety requirements from Naval Base Kitsap at Bangor which is the host activity at Bangor.

APPLICABLE DOCUMENTS

The following documents form a part of this specification. Unless otherwise indicated, the issue in effect on the date of a request for proposals or request for quotes shall apply.

National Fire Protection Association (NFPA)

NFPA 54 National Fuel Gas Code NFPA 70 National Electric Code NFPA 79 Electrical Standards for Industrial Equipment

Code Of Federal Regulations

29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment 29 CFR 1926 Safety and Health Regulations for Construction

(Application for copies should be addressed to Superintendent of Documents, Government Printing Office, Washington, DC 20402)

Washington State Administration Code (WAC)

WAC 173-60 Maximum Environmental Noise Levels

I. GENERAL REQUIREMENTS

a. All documentation/correspondence and/or communication specified in these specifications shall be submitted to the Contracting Officer or their designated Government Representative.

b. Mutual Understanding Meeting. Prior to commencing work: The Contractor shall meet in conference with the Contracting Officer, and other necessary Government personnel to discuss and develop mutual understandings regarding administration of the Safety Program, methods and schedules, security, and any other subject necessary for a smooth and successful operation.

c. Environmental & Safety Compliance, General Awareness Training, and Regulatory Interface

1. Contractors working at the TRF, Bangor Site are required to perform their work in compliance with all Federal, State, and local regulations pertaining to the environment at all times.

2. The contractor is responsible for complying with the safety regulatory notices or orders, including payment of any fines attributable to the contractor’s conduct, regardless of whether or not the contractor is the name recipient of the notice, order, or fine.

3. The contractor is responsible to perform all duties and responsibilities for environmental and safety compliance set forth in this contract. The Contracting Officer can use failure to comply with the responsibilities for environmental and safety requirements as a basis for termination for default.

4. Failure to comply with or repeated violations of local, state, or Federal regulations can result in the violator(s) losing their access to TRF, Bangor Site or the operation being suspended until the Contractor can provide properly trained personnel. Certification of training shall be presented upon request by the Contracting

Officer. The contractors (including its employees) loss of access to TRF, Bangor Site will not be considered by the Contracting Officer as a basis for an adjustment to the contract for additional costs incurred by the contractor.

5. The contractor shall be responsible for conducting routine inspections of the work and storage areas to maintain compliance with the cleanliness and safety requirements associated with this contract.

d. Definitions – Technical:

1. Contractor. The term Contractor refers to both the prime Contractor and subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of this contract

II. HEALTH AND SAFETY

a. Personal Health And Safety

Contractor work performed at TRF, Bangor Site is typically in an industrialized area and is subject to OSHA Standards. The contractor shall conduct all work in a safe manner and shall provide all necessary safety equipment.

The contractor shall make the maximum use of low-noise emission equipment as certified by the Environmental Protection Agency. Applicable regulatory requirements for maximum environmental noise levels are published in the Washington Administrative Code, WAC 173-60. The contractor shall provide hazardous noise signs and label equipment wherever work procedures and equipment produce sound-pressure levels greater than 84 dB(A) steady state and/or 140 dB peak sound pressure level for impact or impulse noise, regardless of the duration of the exposure.

b. Compliance With OSHA

Contractor’s personnel shall perform all work in accordance with the most current OSHA rules and regulations issued by the Department of Labor, as applicable.

For all electrical equipment installation, the equipment and its component parts shall be in compliance with the applicable OSHA regulations in accordance with CFR Title 29, Chapter XVII, Part 1910 and installed in accordance with NEC/NFPA requirements. Approval shall be as specified under the “Approval” and “Acceptance” criteria in the OSHA regulations Subpart “O”, Machinery and Machine Guarding paragraph 1910.212 and Subpart “S” Electrical, paragraph 1910.303 and paragraph 1910.399.

The contractor shall ensure all hazardous material (e.g. hydraulic oil, lubricants, grease, ink, paint, etc.) that is delivered with the equipment, is properly labeled and a Material Safety Data Sheet (MSDS) for each hazardous material is provided, as outlined in OSHA paragraph 1910.1200. MSDS(s) shall be delivered to the Receiving Activity Point of Contract/Surveillance Officer (who will deliver the MSDS(s) to the appropriate Hazardous Material Coordinator for addition of the material to the shop Authorized Use List, and possibly have the material labeled (by the government) with a Hazardous Material barcode).

c. PCB Certification

Provide written certification from the manufacturer that any new equipment provided by this contract contains no detectable PCBs (less than two (2) parts per million (ppm)). The certification shall be on the manufacturer’s letterhead and signed by a company official who is empowered to provide same. PCB Label Plate – A label plate containing the PCB Certification information shall be permanently affixed to the equipment in the vicinity of the manufacturer’s identification plate. The certification label shall be engraved or etched on wear and corrosion resistant material.

d. Safety Equipment

During the performance of work under this contract, all contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (i.e. hard-hats, steel-toe safety shoes, safety glasses and hearing protection).

The Contractor shall provide all appropriate safety barricades, signs, and signal lights.

e. Safety Inspections

The contractor’s workspace may be inspected periodically for compliance with OSHA Standards.

Abatement of violations will be the responsibility of the contractor and/or the Government as determined by the Contracting Officer.

The Contractor shall provide assistance to the Safety Office escort and the federal OSHA inspector if a complaint is filed. Fines levied on the Contractor by federal OSHA offices due to safety/health violations shall be paid promptly by the Contractor.

f. Energy Control

Prior to commencement of ashore work, the contractor shall provide their 29 CFR 1915.89 compliant program/procedures to the Government's Representative. The contractor is required to meet with the Government's Representative and all affected Lockout-Tags-Plus Coordinators to discuss and coordinate lockout/tags-plus interfacing and work requirements.

The contractor shall notify all employees working in the area that Hazardous Energy Control work will be performed.

Contractor personnel shall ensure Hazardous Energy Control training is current and complies with 29 CFR 1915.89.

Equipment provided by the contractor shall provide energy isolating devices (e.g. safety switches valves, etc.) to protect personnel from Hazardous energy. These energy isolating devices shall be designed and manufactured such that they can be locked to prevent inadvertent operation or unauthorized change. The contractor shall ensure all energy isolating devices installed or modified are capable of being locked. To include, but is not limited to, manual, mechanical and electrical devices.

Contractor personnel are required to know and understand all energy sources associated with their work, the means to control these sources of energy and to render the system inoperative before work can begin.

Government organizations representatives shall ensure adherence to the "Organizations that issues contracts" section located in OSHE Control Manual Chapter 250 Hazardous Energy Control.

Government representatives shall also make certain all contractors understand "Contractors and other Non-Shipyard Government Organizations Shall" section of the OSHE Control Manual Chapter 250 Hazardous Energy Control.

Contractor personnel are also required to know the Hazardous Energy Control…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .