This is a Statement of Work (SOW) for manufacturing and delivering one Advanced Secondary Propulsion Unit (ASPU) Motor for the USS JIMMY CARTER (SSN 23) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS/IMF). The contractor's scope includes updating referenced drawings, manufacturing one ASPU Motor per Curtiss-Wright Engineering Drawing 4D99141G02, and creating one shipping container per Drawing 56-00318. Deliverables include the ASPU Motor, shipping container, and a Production Unit Test Report.
The SOW specifies quality assurance requirements, with the contractor as the Original Equipment Manufacturer (OEM) being solely responsible for service quality. Security requirements are minimal, with all documents unclassified and contractor employees required to be U.S. citizens. Government contacts include a Contracting Officer Representative and Subject Matter Experts for electrical and mechanical aspects. The Quality Assurance Surveillance Plan mandates 100% compliance for equipment functionality, delivery schedule, communication, and adherence to federal trafficking regulations, with performance assessments conducted by a Government Surveillance Officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM2-25-Q-1272 (Solicitation) Unit Secondary Propulsion Advanced.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
References:
A. Curtiss-Wright EMD DWG 4D99141G02 – Model P/5-4026-A1 Advanced Secondary Propulsion Unit Assy
B. Curtiss-Wright EMD DWG 56-00318 – Shipping Fixture for the ASPU Motor Unit Assembly
1. BACKGROUND:
Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS/IMF) requires an additional spare Advanced Secondary Propulsion Unit (ASPU) Motor (Ref. A) to support USS JIMMY CARTER (SSN 23) mission readiness.
2. PURPOSE:
The purpose of this is to manufacture and deliver one (1) new ASPU Motor (Ref. A) in one shipping container Ref. (B).
3. SCOPE:
The contractor shall provide all management, labor, equipment, tools and materials necessary to:
3.1 Update Ref. (A) and associated sub-assembly drawings as necessary.
3.2 Manufacture one (1) ASPU Motor per Ref. (A).
3.3 Manufacture one (1) ASPU Shipping Container per Ref. (B).
4. DELIVERABLE ITEMS:
4.1 One (1) ASPU Motor (Ref. A).
4.2 One (1) ASPU Shipping Container (Ref. B).
4.3 One (1) Production Unit Test Report for Deliverable 4.1.
5. CONTRACTOR FURNISHED MATERIAL:
5.1 The contractor shall provide all management, labor, equipment, tools and materials necessary to accomplish all tasks and deliverables in Sections 3 & 4.
6. QUALITY ASSURANCE REQUIREMENTS:
PSNS&IMF –or- Contractor is responsible for quality assurance.
6.1 The contractor as the OEM is solely responsible for the quality of the services provided.
7. SECURITY REQUIREMENTS: None
7.1 All references and deliverable items associated with this task are unclassified. Contractor employees must be U.S. citizens to handle NOFORN information. There are no other known requirements for access to restricted information connected with the performance of this task.
STATEMENT OF WORK (SOW)
8. GOVERNMENT CONTACTS:
8.1: Contracting Officer Representative: Corey Shoemaker (360) 627-5172 corey.j.shoemaker.civ@us.navy.mil
8.2: Government Representative: TBD.
8.3: Subject Matter Expert: Jean-Christian Gagner C/120X.2, (360) 627-5157, jean-christian.g.gagner.civ@us.navy.mil or Albert Fruner C/120X.T2, (360) 627-5264, albert.f.fruner.civ@us.navy.mil for electrical. Joshua Gardner C/120X.1, (360) 627-5147, joshua.p.gardner5.civ@us.navy.mil or Patrick Tighe C/120X.1, (360) 627-5248, patrick.m.tighe3.civ@us.navy.mil for mechanical.
9. OTHER CONSIDERATIONS:
9.1 Estimated Work Hours: N/A
9.2 All technical clarifications will be coordinated through the Government Contracting Officer Representative and/or COG tech code (PSNS & IMF C/120X).
9.3 Environment and Safety Concerns: None.
9.4 Laydown and Utilities Requirements: None.
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services and delivery/installation of replacement parts required by the PWS in a timely, accurate and complete fashion.
Performance Measurement: Performance will be measured in accordance with the following table:
Services
Primary Performance Objectives
Performance Standard/AQL Performance Assessment Method
Services provided such that repaired equipment functions as intended
100% compliance Inspection performed by Government Surveillance Officer
Provide services to meet delivery schedule
100% compliance Government Surveillance Officer and product and services documents
Contractor maintain close liaison and good communication with Government
Any problems or questions encountered by either party are addressed within 24 hours (1 business day)
Government Surveillance Officer and reports
Contractor Compliance with FAR Clause 52.222-50, Combat Trafficking In Persons
100% Compliance and immediate notification of any violation
Inspection of contractor's policy by COR
AQL = Acceptable Quality Level
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)
(IAW 10 USC 235 and 2330a)
"The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the GFP Modification via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than Oct 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at: http://www/ecmra.mil