AMENDMENT 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| AMENDMENT_3.pdf | ||
| 15q0018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE PURPOSE OF THIS AMENDMENT IS TO:
1. Provide answers to the following submitted questions:
a. Question: What is the ceiling height of the building in B-171 Center and west end of north-south aisle way?
Answer: The height below the crane is defined in Attachment C Drawing #1 on page 56 of the solicitation as 28' 4" in the installation area.
b. Question: Is the customer using a lifting crane inside the building to lift and erect this machine in the building.
Answer: The customer is not erecting this machine. There is a 40,000 lb. overhead bridge crane over top of the installation area that the vendor can utilize in accordance 3.10.5.1.
c. Question: What is the floor loading rating?
Answer: The floor loading limits are clearly defined in Attachment B section 3.10.5.2 on page 51 of the solicitation, and will not be repeated here due to its length.
d. Question: Are there any floor joints, trenches or man-holes that will be affected by the machine placement?
Answer: Yes.
e. Question: Does the enclosure system around the machine have to be of NEMA 12?
Answer: There is no enclosure required around the machine. Electrical enclosures are required to meet the criteria for NEMA type 12.
f. Question: How far will the machine be located from the loading dock?
Answer: There is no loading dock. The door shown in Attachment C Drawing #1 on page 56 of the solicitation is within 20' of the installation site.
g. Question: The specification says that the Customer will off load the machine. Who will do the preliminary uncrating of the machine and all containers including lifting devices?
Answer: The contractor is required to unload the machine, not the customer, in accordance with Attachment B section 3.10 page 49 of the solicitation.
AMENDMENT NO.
REFERENCE NUMBER OF DOCUMENTATION
SPM4A8-15-Q-0018
NAME OF OFFEROR OR CONTRACTOR: TO ALL POTENTIAL OFFERORS
AMENDMENT NO.
REFERENCE NUMBER OF DOCUMENTATION
SPM4A8-15-Q-0018
NAME OF OFFEROR OR CONTRACTOR: TO ALL POTENTIAL OFFERORS
h. Question: The specification says that the electrical will be ran up to 20' with in the distance of the machine. Who will run the piping and final installation for the electrical and air requirements?
Answer: The contractor shall be responsible for this in accordance with Attachment B section 3.10 page 49 of the solicitation.
2. All other terms and conditions remain the same.
END OF AMENDMENT.