03.09.12 - P00003 PWS Overpacking Airlift.pdf
PDF 114 KB Posted
- Solicitation number
- SPM302-12-R-S004
About this file
DTS Statement of Work is attached.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPM302-12-R-S004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
OVERPACKING AND TRANSPORTATION OF PERISHABLE SUBSISTENCE
U.S. TRANSPORTATION COMMAND
(USTRANSCOM)
9 MARCH 2012 (P00003)
1.0 BACKGROUND:
1.1. This Performance Work Statement (PWS) supports two Department of Defense (DoD) agencies with requirements to deliver subsistence to end-customers in the Pacific region. The primary shipments covered in this PWS are perishable in nature and require cold chain logistics practices and standards to maintain the products’ integrity and freshness. The contract supports the Defense Commissary Agency (DeCA) and the Defense Logistics Agency (DLA).
1.2. The contractor is responsible to prepare products for transport, airlift, clearance, and delivery of shipments to end customers. Shipment contents are food items procured via a third-party supplier. Historically, the preparation, palletizing (overpacking) and transportation requirements of the food items were completed under separate contracts. This contract consolidates these two services to provide synergy and direct accountability for the temperature, quality and freshness of the product at its destination.
1.3. The primary goal of this contract is to transport regular produce shipments by providing on-time, scheduled deliveries while maintaining the quality, integrity, and temperature management of the subsistence throughout the transportation process. The secondary goal is to provide expedited transportation of perishable subsistence in support of military deployment and Pacific region emergencies.
2.0 DESCRIPTION OF SERVICES:
The contractor shall be responsible for door-to-door movement of government acquired subsistence items. The service includes the receipt of dry, chilled and frozen subsistence, preparing subsistence for air transport, airlifting subsistence, customs/agricultural clearance, fumigation/destruction, and delivery to overseas customer’s facility.
2.1 FACILITY: The contractor shall maintain a facility for the receipt and preparation of Government acquired subsistence for air transport, which includes forced-air or other acceptable cooling capability. Contractor’s facility must adhere to acceptable sanitation, pest management and OHSA food safety practices. The contractor shall provide the required equipment, supervision, and personnel necessary to receive, sort, consolidate, package and palletize subsistence items.
2.2 SHIPMENT PREPARATION: The contractor is responsible for sorting, consolidating, and palletizing products received to accommodate the applicable agricultural clearance requirements of the end destination host country. The contractor will prepare and palletize the food products to ensure cold-chain logistics and agricultural requirements are met. Familiarity with produce characteristics that encompass compatibility and temperature management will be necessary as well as familiarity with Japan, Korea, Guam and US agricultural clearance procedures.
2.3 TRANSPORTATION: The contractor shall provide the facility, equipment, supervision, and personnel needed to provide cold chain transportation from San Francisco, CA to various locations in S. Korea, Singapore, Guam, and Japan to include Okinawa. Since this contract is a performance-based, commercial service contract, the contractor is encouraged to use its existing transportation network to include use of multi-modal solutions to provide service in accordance with this PWS and the delivery schedule. The contractor’s facilty to receive Government procured perishables shall be located within a 20 mile radius of San Francisco, California.
Contractor shall maintain appropriate temperature and environment for subsistence throughout the transportation process. The contractor is responsible for transporting the shipments from their facility to the shipments’ final destination. Door-to-Door transportation includes transportation from facility to consignee, export documentation requirements, customs clearance, compliance with inspection requirements, compliance with Status of Forces Agreements (SOFA), sorting, fumigation (if required), and destruction (if required).
2.4 SHORT-NOTICE REQUIREMENTS: The contract requires regular delivery of produce and other perishable items to Japan, Okinawa, Korea and Guam. In addition to regular, consistent produce airlifts, unscheduled, high priority shipments are expected that shall require expedited service. In most cases, the contractor may only receive short notification of a high priority shipment. The contractor is responsible for providing priority service to deliver these short-notice shipments while also continuing to provide regularly scheduled service.
3.0 REQUIREMENTS:
3.1 RECIEPT /PREPARATION:
3.1.1 Receiving: The contractor is responsible for receiving subsistence items delivered via third-party supplier.
The contractor is responsible for verifying delivery against receipt invoice, rejecting damaged products and ensuring refrigerated product is delivered in refrigerated conveyances. Contractor is required to check the pulp temperature of received product to ensure it is in acceptable temperature range and may inspect the overall quality of the product(s). The contractor shall report infractions to the Contracting Officer Representative (COR) for guidance, and shall determine what if any action should be taken against the third-party supplier. The contractor should expect the Fresh Fruits and Vegetables (FF&V) to arrive in grade US #1 condition or better1. If upon inspection the contractor identifies product less than this standard, they shall notify the applicable agency (DeCA or DLA) COR. The COR will inspect the product and document its condition. The COR will make the determination as to whether or not the product is acceptable for shipment. If the COR determines the item(s) are shippable, the contractor shall annotate the shipping papers accordingly. The contractor accepts liability for the quality of the product until inspection and acceptance by the Government at the shipment’s final destination location. Any equitable adjustments, claims, or disputes arising from rejected shipments upon inspection shall be handled in accordance with Federal Acquisition Regulation (FAR) clause 52.212-4.
3.1.2 Pre-Cooling: The contractor is responsible for pre-cooling subsistence items using a forced air cooling system or another acceptable practice to rapidly cool the subsistence to the proper temperature range required to maintain quality.
3.1.3 Overpacking: The contractor is responsible for sorting, consolidating, and palletizing product received to prevent damage, to preserve shipment integrity, and adhere to agricultural clearance requirements.
Overpacking also entails all necessary processes needed to ready the shipment for air transport. The contractor must be knowledgeable of produce compatibility and temperature management practices to meet shipment re-packaging and palletization requirements. Contractor shall use appropriate commercial practices to ensure shipments maintain appropriate temperature during transit. In addition, the contractor shall over-pack shipments to allow for efficient processing and compliance with countries’ customs and agricultural clearance procedures. The contractor is responsible for building sample inspection pallets that adhere to Guam USDA, Plant Quarantine Japan (PQJ), Plant Quarantine Korea and any other domestic or foreign authority that has jurisdiction over deliveries covered under this contract. This may require individually wrapping each sample pallet carton with fly guard or another insect proof material. Produce pallets shall also be wrapped with fly guard material or other packaging material to adhere to host country’s customs and agricultural clearance requirements.
3.1.4 Sample Pallets: In order to expedite the inspection process on arrival the contractor should be prepared to make sample pallets which are separate from the primary load. The same temperature maintenance requirements are required for sample pallets as are required for the primary load. The contractor is responsible to comply with current host nation sample pallet, or similar, procedures and any changes during
1http://www.ams.usda.gov/AMSv1.0/ams.fetchTemplateData.do?template=TemplateN&navID=U.S.GradeStandards &rightNav1=U.S.GradeStandards&topNav=&leftNav=&page=FreshGradeStandardsIndex&resultType=&acct=fres hgrdcert the course of the contract. The following are current procedures, but are subject to change at the discretion of host nation procedures.
Guam: One item of each product should be separately packed and marked for inspection.
Japan: The contractor is required to be familiar with the Japan PQJ requirements for selection of items for inspection. Following PQJ requirements, item selections are loaded on sample pallets which are separate from the main load.
Korea: The contractor is required to prepare sample pallets for the joint US Vet-Korea PQ inspections at Yongsan Army Post. One item of each product should be separately packed and marked for inspection.
3.1.5 Cold Chain: Contractor is responsible for maintaining shipment environment and temperature requirements according to guidelines as provided in the Produce Market Guide (http://producemarketguide.com/commodity_info/) published by the produce publication The Packer. The contractor shall maintain product temperatures to within 5 degrees Fahrenheit of the suggested transportation temperature in the guide. In the event that a commodity or shipment item is not addressed in the publication, the contractor shall provide temperature and environmental conditions in accordance with commercially accepted principles and practices. The contractor shall transport items using commercially accepted perishable shipping solutions. One possible shipping solution requires all refrigerated shipments to be packed with gel-packs, wet, or dry ice to meet cold chain logistic requirement. This solution would require temperature control insulated material to be utilized in conjunction with ice to maintain the required temperature for the duration of the transit time. This perishable shipping solution is only one method of meeting the requirement. The contractor may use any method to provide cold chain logistics so long as the method meets the requirements of this PWS (i.e. on-time delivery, shipments free of damage, temperature integrity, etc.).
3.1.6 Temperature Data Recorders: Mobile temperature recorders shall be placed in pallets to ensure cold chain logistic requirements are met. The contractor shall use a temperature recording device to provide continuous monitoring and recording of a shipment’s temperature. Each pallet shall include an active temperature monitoring device. The temperature monitoring device is a quality assurance measure to ensure shipment temperature variances comply with the terms of this PWS while in transit. The contractor may propose an alternate method of temperature monitoring and recording procedures.. Any alternative method proposed must be able to provide each shipment with continuous temperature monitoring and recording. The contractor will be responsible to adhere to this procedure unless the Contracting Officer (CO) approves alternate procedures. The Government is not responsible for any temperature recording/monitoring devices.
3.2 SHIPPING DOCUMENTATION
3.2.1 Documentation: The contractor shall receive a third party supplier invoice from the delivery driver, and a
SF 2005 from the ordering office. For every shipment, the contractor shall generate a DD Form 250.
Additionally, for Korea shipments, the contractor coordinate with the COR to generate a Government Bill of Lading. From these documents the contractor shall generate an Air Way Bill (AWB) and submit it along with the DD 250 to Defense Distribution Center (DDC) and DeCA, as applicable, for payment. In instances of non-scheduled, emergency shipments, the order for services may be generated through the Government Approved Third Party Payment System (i.e. Syncada).
3.2.2 Clearance: The contractor is expected to prepare all the necessary documentation to adhere to host country customs and agricultural authority requirements and to ensure on-time delivery. The contractor shall provide duty-free customs clearance for all shipments.
3.3 SHIPMENTS
3.3.1 The contractor shall transport the total shipment ordered. Shipments include all cargo destined for a single customer (i.e. the order could range from less than a full pallet to multiple pallets). Shipments will include primarily fresh fruits and vegetables (FF&V). Some shipments, primarily those identified as short-notice emergency shipments, may include chilled meat, chilled fish, frozen processed foods and dry subsistence.
The contractor shall maintain appropriate temperature for specific products per commercial guidelines discussed in paragraph 3.1.5 of this PWS.
3.3.2 Cargo shall be packaged appropriately to maintain the temperature integrity of the shipment throughout the transportation process. The contractor is responsible for maintaining shipment temperature to within a five degree (Fahrenheit) variance of the commercially recommended temperature throughout the transportation process.
3.3.3 Contractor shall take appropriate measures to ensure temperature integrity during times of extended delays while in transit such as delays experienced while awaiting customs clearance. Appropriate measures may include, but is not limited to, temporary storage in refrigerated facility or refrigerated trucks or re-icing of shipments.
3.3.4 When shipments require fumigation, the contractor is responsible for the destruction of any packing, insulation, or refrigeration materials or other disposable items. The contractor is also responsible to re-pack, as appropriate, to maintain the cold-chain and temperature integrity.
3.3.5 RESERVED
3.3.6 Emergency requirements: The contractor shall be notified via e-mail of an unscheduled, emergency or high priority shipment by a DeCA or DLA Troop Support representative. The representative shall provide the contractor with the estimated weight, commodities involved, ship to location and other pertinent information. The contractor shall respond to the COR within 12 hours of notification in order to establish and coordinate delivery times. Guam, Japan, and Singapore are among the primary destinations for emergency shipments. The contractor is required to deliver emergency shipments to the end destination within 72 hours after receipt of goods. Emergency shipments that are not delivered within the 72 hour timeframe will be subject to the credit terms indicated in paragraph 3.5.5. For emergency shipments delivered to the overpacking facility that exceed 60,000 lbs, the volume shall be divided into separate shipments whereby each shipment is at or below 60,000 lbs. The 72 hour delivery requirement is then extended 24 hours for each incremental shipment volume exceeding 60,000 lb.
3.3.6.1 For example, if an emergency shipment with total aggregate weight of 150,000 lbs requires service, the breakdown provides an example of how the timeframe requirement would be calculated for the different incremental shipments of the total 150,000 lb requirement.
Portion of 150,000 lb shipment Required Delivery Time-frame First 60,000 lbs 72 hours after receipt of goods Second 60,000 lbs 96 hours after receipt of goods Final 30,000 lbs 120 hours after receipt of goods
3.3.7 The contractor shall offer a percentage discount off their commercial rate for international shipments requiring cool-chain logistics transportation originating from and arriving to other locations not identified in the price schedule. Shipments originating from locations other than the contractor’s packing facility shall only require door-to-door transportation and cold chain maintenance while in transit. These shipments shall not include overpacking services.
3.4 CUSTOMS & COUNTRY SPECIFIC AGRICULTURAL PROCESSING PROCEDURES: The current procedures are provided. These procedures are subject to third-party policies and procedures. The contractor is responsible for compliance with these and any future changes to these requirements. The contractor is responsible for compliance with any other procedures not identified here. The contractor is responsible for all fumigation and destruction costs.
3.4.1 Guam: Produce shipments transported to Guam that transit other countries prior to entry into Guam must be sealed in a way as to ensure there was no tampering during transit. Methods to accomplish this may be sealed air containers or other approved method by Guam Customs and Agriculture. Upon arrival into Guam, Guam Customs and Agriculture will inspect the produce for pests prior to entry into Guam.
Produce found with pests will be put on hold/quarantined until all pests are removed. The produce must be re-inspected before allowing final delivery.
3.4.2 Japan: Produce shipments transported to Japan will be inspected for pests by the PQJ on arrival into Japan. Produce found with pest will be put on hold/quarantined until the pests are removed. Depending on the type of pest, the removal methods are fumigation with Cyanide or Methyl Bromide gas. The contractor is responsible for removal of pests before PQJ will clear and allow entry into Japan.
3.4.3 Korea: After shipments clear host nation customs, the sample pallets shall be transported to US Army Garrison Yongsan to undergo the joint plant quarantine inspection. The shipments consigned to locations other than Yongsan are not required to be transportred to Yongsan, but delivery cannot be completed until the plant quarantine inspection of the sample pallets is completed and cleared. The plant quarantine inspection is conducted to identify any pests within the shipment. The intent of the sample pallets and the pest inspection is to ensure that every type of produce entering Korea is inspected for pests per the Status of Forces Agreement (SOFA). The contractor should allow 24 hours for the inspection process, but it is typically finished within 3 to 4 hours. Produce found with pests must be either fumigated or disposed of.
If inspection of a particular product within the sample pallet finds unauthorized pests, the entire shipment of that product would need to be fumigated or disposed of.
3.5 DELIVERY
3.5.1 Government inspection and acceptance of services will be accomplished at the final destination points where the cargo manifest/acceptance document is signed and annotated with date and time of delivery by an authorized Government representative. The shipment shall be delivered within acceptable temperature ranges and free from significant visible damage. Significant visible damage is defined as damage to the shipment contents in which a reasonable person would not consider the product(s) suitable for resale as indicated by the overall appearance or inherent characteristics (e.g. texture, ripeness, etc.). A shipment shall be considered to have incurred a cold-chain failure if:
3.5.1.1 Shipment is delivered outside acceptable temperature ranges,
3.5.1.2 Shipment delivered with significant visible damage with no justifiable documentation on product condition upon receipt, or
3.5.1.3 Shipments in which temperature recorder data indicates unacceptable temperature variance.
3.5.2 Customers are located on military installations and as such the contractor is required to submit the necessary documents to complete installation access application. This shall be completed within 90 days from contract award.
3.5.3 Contractor will make tail gate deliveries to each of the customers unless requested otherwise by the customer. Exceptions are to be reported to COR for resolution.
3.5.4 On-time Performance: The contractor shall deliver the total ordered amount (shipment), according to the schedule in Exhibit B or as required for emergency shipments. Other delivery times that result in quicker, more efficient delivery may be established between the contractor and the applicable end customers, but must be approved by the CO. The delivery times in the delivery schedule are the minimum standard during contract performance.
3.5.5 Delivery Commitment Guarantee: Contractor shall make delivery of all shipments on the scheduled date
(unless adjusted due to holiday) listed in Exhibit B. Contractor must meet this delivery commitment (applies to both scheduled and emergency shipments) or the shipper will be entitled to a shipper-initiated credit of 14%.
3.5.6 If credit is requested by shipper within 30 days of the contractually required delivery date, the contractor shall either reduce their next invoice or credit the customer’s account for those shipments that do not meet the delivery commitment.
3.5.7 In the event a delivery cannot occur during normal business hours, the contractor may contact the consignee to see if they will accept the shipment after hours. If the customer will remain open to accept delivery, the shipment will not be entitled to a credit, but will still be considered late. This will be done on an exception basis only.
3.5.8 Excusable Delay: Shipments delayed due to uncontrollable reasons will not be considered late (i.e., Japanese customs destroys shipment due to infestation). Timely delivery is important to fulfill orders for DeCA stores or troop dining facilities. Failure to deliver the shipments during the delivery period, for reasons other than causes beyond the control and without the fault or negligence of the contractor, may be grounds for termination or assessment of liquidated damages. Determination as to whether the delay is beyond the control and without the fault and negligence of the contractor will be determined by the CO in accordance with FAR clause 52.212-4(f), Commercial Terms and Conditions – Commercial Items (Jun 2010).
3.5.9 Service Interruptions: Prior to the beginning of the contract year and each option year, the contractor shall provide the customer with a list of expected service interruptions such as foreign holidays or dates and/or times when customs inspectors are not available to process shipments and the contractor is prevented from performing full service. Any unexpected service interruptions that could impact the delivery schedule should be brought to the customer’s attention immediately. Shipments will not be scheduled on federal holidays.
3.6 NOTIFICATIONS/REPORTS
3.6.1 Delay Notification: The Contractor shall notify the customer of any delays. An email/fax explanation as to the cause of delay and what action has been taken to preclude a recurrence shall be provided within three business days to the CO. A copy of this explanation shall be provided to the customer.
3.6.2 Pre-Alert Notification: When shipments arrive in the destination country late, the contractor shall provide telephone or e-mail pre-alert notices to each consignee to inform them of estimated time of delivery.
3.6.3 The contractor shall email/fax proofs of delivery (PODs) to DeCA and DDC weekly. PODs shall be sent to the CO monthly via email by the 20th of each month.
3.6.4 Monthly Report: The contractor shall provide each customer and the CO with a monthly report, through e-mail, that includes the following information: date and time Government goods received, shipment date, date of delivery, TCN, Airway Bill number, time delivered at end location, recipient name, consignee location, customer agency information (DeCA, DLA, Prime Vendor), weight in lbs for each general commodity type (dry, chill, frozen, or produce), shipment cost, and general shipment remarks, as necessary.
Submit reports via email by the 20th of each month.
3.6.5 Temperature Recorder Information: Within 24 hours after delivery the contractor is responsible to notify the Government if a shipment exceeded the specific temperature parameters while in transit. The contractor is responsible to maintain the temperature recorded data for each shipment for a period of 90 calendar days. At the end of each quarter, the contractor shall submit all temperature recorded data for 5 separate shipments. The CO shall identify which 5 shipments’ information the contractor is required to submit. The temperature data for any shipment within the past 90 days shall also be submitted upon request at any time by the CO or the COR.
3.6.6 Intransit Visibility (ITV): The contractor is responsible to provide intransit visibility (ITV) for all shipments from the time of pick-up to the time of delivery using a government-furnished transportation control number (TCN), shipper’s reference number, and the contractor’s unique identifying Airway Bill (AWB). ITV information shall include: dates and times for shipment origin, trans-shipment points, destination arrival time, proof of delivery with consignee’s name and reason for any delays. When shipments are delivered without obtaining a signature, the ITV system shall record the location where the shipment was left. The contractor shall update ITV shipment status information commensurate with commercial practices. ITV information shall be provided via the internet.
3.6.7 Contractor’s Report of Sales and Revenue.
3.6.7.1 The contractor shall report the semi-annual dollar value (rounded to the nearest whole dollar) of all sales and revenue received under this contract every six months. The contractor shall submit the report by the end of the month following the end of the previous six months of activity (i.e. the first report will be due 30 Apr 12). The contractor is required to verify all previously submitted data matches their semi-annual sales prior to submitting the Sales and Revenue report. The dollar value of a sale is the price billed/invoiced to each customer for products and services requested under this contract as identified in each Contract Line Item Number (CLIN)/Sub-Line Item Number (SLIN) and the revenue is the money received by the contractor. The reported sales and revenues shall be inclusive of the ASC.
3.6.7.2 The contractor shall report the semi-annual dollar value of sales to the Contracting Officer, and to:
DSSN 3877-JS/LI
ATTN: 3801 Limestone Field Site PO Box 269339 Indianapolis, IN 46226-9339
3.6.7.3 The contractor shall report sales separately for each CLIN to the SLIN level. If no sales occur, the contractor shall show zero on the report for each separate CLIN or SLIN.
3.6.7.4 The contractor shall report all sales and revenues in U.S. Dollars.
4.0 GENERAL INFORMATION:
4.1 The contractor shall utilize his or her commercial quality control program and procedures to identify, prevent and ensure non-recurrence of defective services. The government will evaluate the contractor’s performance throughout the life of the contract through on-site observations and records reviews.
4.2 The CO may request status and performance review meetings to be held at a government location at no additional charge. Meetings shall be held on an as-needed basis. The purpose of the meetings will be to discuss contract performance and address contractor/customer concerns.
4.3 Security Measures. Quality control procedures must be heightened to ensure that product entering the contractor’s facility is safe for public consumption. The following security guidance is provided:
4.3.1 The contractor shall ensure all boxes, bags, etc. are intact and demonstrate no evidence of tampering. All incoming truck drivers should provide adequate identification upon request. Visitors should also be properly identified and access limited to appropriate areas. Procedures for storing product should adequately control access to eliminate any possibility of product adulteration.
4.3.2 The contractor shall review lighting and camera conditions at their facility and consider whether fencing and locking devices are adequate. The contractor shall not leave open trucks unattended, and use seals when possible to designate loaded trailers. Security seals shall be properly placed on delivery vehicles and registered/logged in per delivery. Ensure employee background checks are up to date.
4.3.3 Review of overall organizational corporate security plans should be conducted. Additionally, the contractor shall convey to all personnel that security should not be taken lightly and any suspected adulteration or evidence of product tampering must be reported immediately.
4.4 Installation Access: While on military installations or on military portions of civil installations, contractor personnel shall comply with security regulations promulgated by the military installation commander. Security regulations are directive in nature and shall be adhered to by all contractor personnel. In addition, the contractor shall (consistent with their commercial procedures), provide a method to protect the integrity and proper functioning of all equipment and systems involved in the operation of this contract. Any equipment and information processing systems containing government information shall have security measures to protect against unauthorized disclosure.
4.5 Contractor Personnel: Not later than 5 days after contract award, the contractor shall identify to the Contracting
Officer (CO), the name, address, and telephone number of the point of contact for administrative matters.
4.6 Post Award: The government will hold a post-award conference to identify key Government personnel, discuss roles and responsibility of each person, and clarify contract implementation issues. Applicable Points of Contact to include email addresses, phone and fax numbers will be provided. The contractor shall ensure key personnel from their organization attend this conference.
4.7 Administrative Service Charge. All sales of contract items to authorized Government users shall incur contractor liability for payment of the Administrative Service Charge (ASC).
4.7.1 ASC Remittance: The contractor shall pay USTRANSCOM an Administrative Service Charge. The contractor shall remit the ASC in U.S. dollars within 30 days after the end of each semi-annual period. The ASC equals 1% (one percent) of total revenues received during the period.
4.7.2 The contractor shall consolidate all actions for the reporting period into one payment. To ensure that the payment is credited properly, the contractor shall identify the check or electronic transmissions as a “Perishables 1% Administrative Fee, EEIC 45429” and include the following information: contract number; report amount; and report period. If the contractor makes payment by check, provide this information on either the check, check stub, or other remittance material.
4.7.3 If paying the ASC by check, the contractor shall forward the check to the following address:
DSSN 3877-JS/LI
ATTN: 3801 Limestone Field Site PO Box 269339 Indianapolis, IN 46226-9339
4.8 Key Personnel and Subcontractors. The successful Offeror’s proposal is part of the contract. The contractor must request permission to substitute those key personnel or key subcontractors it identified in its proposal. The accepted proposal establishes the new minimum standard (assuming it was in full compliance with the RFP requirements). The contractor will submit information in the same detail as the original proposal for the Government to evaluate. The Government may not approve any substitute that is not equal in all aspects to the originally proposed person or firm.
4.9 Invoicing/Billing/Payment. Management Reform Memorandum (MRM) 15 directed Reengineering of Defense Transportation Documentation and Financial processes. The directive specifically addressed reengineering billing, collection, and payment processes through transition to commercially acceptable practices.
Implementation was coordinated between affected DOD installations and the commercial carrier industry. The Deputy Secretary of Defense directed the implementation of US Bank’s Transportation Solutions system to pay for transportation services. DOD contracts and voluntary tenders require the use of U.S. Bank’s freight payment system and all DOD cargo movements must be offered only to commercial carriers who utilize U.S.
Bank as their billing and payment system.
4.9.1 Third Party Payment System (TPPS) Payable in U.S. Dollars
4.9.1.1 All Transportation Service Providers (TSP) that conduct business with DOD must be TPPS capable. Even if otherwise qualified, a TSP that is not TPPS certified will not be eligible to transport DOD freight.
4.9.1.2 TPPS is an automated on-line payment processing and transaction tracking system that supports logistical transactions. A designated financial institution receives a transaction processing fee for every paid transaction. It consists of five primary functions: (1) electronic data transmission, (2) payment approval process, (3) electronic payment and billing, (4) communication for dispute resolution, and (5) customized data analysis.
4.9.1.3 The prime contractor shall have a signed Trading Partner Agreement (TPA) in place to ensure payments under this contract are made to the prime contractor (e.g. CRAF carrier). The contractor shall provide the procuring contracting office with a copy of this agreement prior to award of contract.
4.9.1.4 The current authorized TPPS is U.S. Bank Transportation Solutions. TSP’s should contact U.S> Bank at 1-
800-417-1844 or by email at customer.support@usbank.com. All services deemed payable by the customers (or USTRANSCOM) via the TPPS will be paid by U.S. Bank Transportation Solutions. A fee is required to participate in the program.
4.9.1.4.1 TSPs are required to submit the shipments’ contract number via EDI. In the event TSPs need assistance configuring their EDI file to include the contract number, you can call the U.S. Bank customer service help desk or email the customer service email box and a representative will open a Service Request to assign a U.S. Bank EDI analyst to assist you. TSPs who do not transmit EDI, must provide the contract number when entering invoices in the U.S. Bank Freight Payment web-based user interface.
4.9.2 The rates in the price schedule are all-inclusive rates for the services provided in this PWS and resultant contract.
4.10 The contractor is required to comply will all national, state, and local laws. The contractor is also required to comply with all applicable Transportation Security Administration (TSA) regulations.
4.11 For any food traceability requirements that may arise as a result of the FDA Food Safety Modernization Act or other food related statutes, of which the requirements in this PWS are found to be inadequate, a modification to the terms and conditions of this contract may result.
5.0 SERVICE DELIVERY SUMMARY (SDS)
The SDS represents the most important contract objectives. While the contractor is fully expected to comply with all requirements in the PWS, the government’s assessment of contractor performance will focus mainly on the objectives listed in the SDS.
Performance Objective Paragraph Performance Threshold
1.
Provide temperature integrity and safe-handling during transportation to ensure quality and freshness of product upon delivery
3.3/3.5.1 Less than 3 cold-chain failures per year
2. On time delivery of shipments 3.5.4 95% On-time rate
3. Provide notifications 3.6.1/3.6.2/3.6.3 100% of the time
4. Provide reports on-time 3.6.4 Less than 2 late reports in a calendar year
5. Temperature Records 3.6.5 100% of the time
EXHIBITS
Exhibit A Definitions Exhibit B Delivery Schedule
EXHIBIT A - DEFINITIONS
Cold Chain: A logistics process where temperature-sensitive cargo will maintain its integrity through multi-modal movement and be kept in ambient facilities to ensure 100% quality, freshness, and customer satisfaction.
Consignee: The recipient (unit, commissary, MWR facility) to whom cargo is addressed or consigned for final delivery.
Consignor: The originator of a shipment.
Contracting Officer (CO): The duly appointed government agent authorized to award and/or administer contracts.
The CO is the only person authorized to contractually obligate the government or interpret the contract.
Customer: The customers for this PWS are Defense Commissary Agency (DeCA) and the Defense Logistics Agency (DLA).
Delivery: Delivery of a shipment to the consignee receiving dock unless other arrangements are made between consignor and the contractor.
Emergency Requirements: Non-scheduled shipment of subsistence that needs to be expedited. Pick up and delivery times will be coordinated between customer and contractor.
Federal Holidays:
New Year’s Day Independence Day Veteran’s Day Martin Luther King Jr’s Birthday Labor Day Thanksgiving Day President’s Day Columbus Day Christmas Day Memorial Day
Government Bill of Lading: A contract between the shipper and the contractor whereby the contractor agrees to furnish transportation service subject to the conditions printed on the reverse side of the bill of lading.
International Holidays: A day in which custom or law within a foreign country or territory dictates a cessation of general business activity to celebrate or commemorate a particular event. The Contractor shall observe international holidays commensurate with commercial practice.
Overpacking: This term is meant to refer to the overall service of receiving the goods from third-party suppliers, sorting, consolidating, and using acceptable methods of packing to ensure product integrity and as required for customs clearances. This also includes any other requirements necessary to ready the shipment for airlift.
Shipment: All cargo destined for a single consignee.
EXHIBIT B – DELIVERY SCHEDULE
JAPAN (MAINLAND) DELIVERY LOCATIONS
Customer Delivery Location Delivered for Overpacking
Required Delivery Date
Delivery Time
DeCA Atsugi Naval Air Facility (NAF) Tuesday Saturday 0900-1200 Saturday Wednesday 0900-1200
DeCA
1) Iwakuni Commissary
2) Sagamihara
3) Yokoto Air Base
4) Misawa Air Base
5) Sasebo Naval Air Base
6) Hario Commissary
7) Yokosuka Naval Base
Tuesday Saturday 0700-1000
Saturday Wednesday 0700-1000
DLA Sanno Hotel Tuesday Saturday 0900-1200
OKINAWA, JAPAN DELIVERY LOCATIONS
Overpacking
Required Delivery Date
Delivery Time
DeCA
1) Kadena Air Base (AB)
2) Camp Foster
3) Camp Courtney
Tuesday Monday 0700-1200
Saturday Friday 0700-1200
DeCA Camp Kinser Tuesday Monday 0700-1000 Saturday Friday 0700-1000
DLA Camp Kinser Monday Thursday 1500-1900
SOUTH KOREA DELIVERY LOCATIONS
Overpacking
Required Delivery Date
Delivery Time
DeCA Yongsan Monday Wednesday 1500-1800 Wednesday Friday 1500-1800
DeCA Osan Monday Wednesday 1500-1800 Wednesday Friday 1500-1800
DeCA
Taegu
Tuesday Friday 0700-1200
DLA Dragon Hill Lodge (DHL), Yongsan Tuesday Thursday 1500-1800
DLA Camp Kim, Yongsan – Delivered to DHL, Yongsan Tuesday Thursday 1500-1800
DLA Navy Club – Delivered to DHL, Yongsan Tuesday Thursday 1500-1800 DLA Camp Casey, Tongduchon Tuesday Thursday 1500-1800
GUAM DELIVERY LOCATIONS
Overpacking
Required Delivery Date
Delivery Time
DeCA 1) Anderson AB
2) Orote Wednesday Friday 1800-2000
DeCA Anderson AB Friday Monday 0800 – 1200 DeCA Orote Friday Sunday 1800 – 2000 DLA Orote/Quality (Prime Vendor) Friday Sunday 1800 – 2000
NOTES – DELIVERY SCHEDULE
(1) The column labeled “Delivered for Overpacking” is the day that the third-party supplier shall deliver the customer’s order to the overpacking facility.
(2) Third-party supplier deliveries will be between 0700 – 1200 on the day of delivery.
(3) End Destinations for each country location with the same delivery days and times were grouped together in the same row (Example ~ Okinawa locations: Kadena, Camp Foster, and Camp Courtney were grouped together in 1 row).
(4) All days and times are local.
File details come from the government source that posted it. Updated .