Spectro Arcos (ICP) PWS.docx.pdf

PDF 499 KB Posted

Attached to
Spectro Arcos ICP Instrument Federal contract opportunity
Solicitation number
FA8227-22-Q-SPEC
Issued by
Department of the Air Force

View the file

Other files for this federal contract opportunity

Other files attached to Spectro Arcos ICP Instrument, newest first.
File Type Posted
Spectro Arcos (ICP) CDRL A003 Safety Plan.pdf PDF
Spectro Arcos (ICP) CDRL A001 Maintenance Service Report.pdf PDF
Spectro Arcos (ICP) CDRL A002 Training Certificate.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE-BASED WORK STATEMENT (PWS)

FULL SERVICE MAINTENANCE, REPAIR AND CALIBRATION FOR

SPECTRO ARCOS INDUCTIVELY COUPLED PLASMA

U.S AIR FORCE

809 MXSS/MXDTAB

11/15/2021

FULL SERVICE MAINTENANCE, REPAIR AND CALIBRATION FOR SPECTRO ARCOS Inductively

Coupled Plasma i

TABLE OF CONTENTS

1 DESCRIPTION OF SERVICES

2 BASIC SERVICES

2.1 GENERAL REPAIRS

3 SERVICE SUMMARY

4 CDRL SUMMARY

5 ADDITIONAL REQUIREMENT

5.2 Base Access

6 CONFLICTS OF INTEREST

7 GENERAL INFORMATION

7.1 Hours of Operation

7.2 Conservation of Utilities

8 ENVIRONMENTAL CONTROLS

8.1 Hazardous Work Environment

8.2 Notification of Environmental Spills

8.3 Safety Program

9 GOVERNMENT OBSERVATIONS

10 FOREIGN OBJECT DAMAGE (FOD) AND TOOL CONTROL

11 ENVIRONMENTAL:

Appendix A – ACRONYMS AND ABBREVIATIONS appendix B – EQUIPMENT LISTING

Appendix C: SAFETY

1 DESCRIPTION OF SERVICES

This requirement is to provide all management, tools, supplies, equipment, and labor necessary to service, repair, maintain and calibrate all of the instruments listed below. The contractor shall provide preventive maintenance services to ensure the systems remain in operable condition.

The contractor shall comply with this PWS in its entirety

2 BASIC SERVICES

The contractor shall provide full service maintenance, repair, support and calibration of each model and instrument listed below. The below equipment and systems are located in building 100 Bay E

Room 26 at Hill Air Force Base (HAFB), Utah. The contractor shall bring the system to original working Original Equipment Manufacturer (OEM) condition. This instrumentation is used for testing hazardous waste in various control areas of HAFB. To support the current and future workload, each instrument has to be repaired, calibrated and operational per Environmental

Protection Agency (EPA) methods and National Environmental Laboratory Accreditation

Program (NELAP) certifications. The contractor shall provide the required services in accordance with (IAW) applicable guidance/regulations and/or manufacturer’s maintenance manuals.

Contractors shall provide a Maintenance Service Report NLT five (5) calendar days upon completion of service. (CDRL A001).

2.1 GENERAL REPAIRS

2.1.1 The contractor shall provide full service, maintenance, repair and calibration of the following equipment:

Spectro ICP System

Spectro Arcos FHM22 – S/N 18009857

Teledyne ASX-280 Auto sampler – S/N 121815A280

2.1.2 Contractor shall be on-site within 72 hours of Government notification.

2.1.3 Contractor shall respond to an unlimited number of service calls and provide telephone support.

2.1.4 All parts (excluding consumables), labor and travel will be included in the contract price.

2.1.5 Contractor shall perform one (1) on-site Preventive Maintenance per analytical instrument per year during the Period of Performance (POP) IAW OEM requirements and as approved by the 809 MXSS/MXDTAB Management.

2.2 SPECIAL REQUIREMENTS

2.2.1 The contractor shall be able to fully service, repair, support and calibrate each model and instrument listed above on one complete service contract without requiring a preventative maintenance or instrument prequalification inspection.

2.2.2 The contractor shall be able to perform repairs and updates to all OEM software installed on the instruments listed above.

2.2.3 The contractor shall use OEM factory recommended replacement parts.

The contractor must provide documentation to the Contracting Officer (CO) within 30 calendar days of contract award and at Government request, show that service technicians are International Organization for Standardization (ISO) 9001:2008 & ISO/International

Electrotechnical Commission (IEC) 17025-2005 certified. (CDRL A002)

3 SERVICE SUMMARY

PWS

Paragraph Performance Objective

Performance Threshold

2.0

The contractor shall provide the required services IAW applicable guidance/regulations and/or manufacturer’s maintenance manuals.

Acceptable if there are no more than one (1) validated customer complaint** within a quarterly period from the start of the task order period of performance

(POP).

2.1.1

On-Site Repair Response Time – the contractor shall have up to 72 hours of

Government notification to respond after notification.

Acceptable if the contractor is on-site within 72 hours of notification

90% of the time.

2.1.2

Preventative Maintenance Response

Time – the contractor shall performed each year, where applicable, IAW OEM requirements.

Acceptable if the contractor performs Preventive Maintenance yearly, and approved by the 809

MXSS/MXDTAB Management

95% of the time.

Para/Table

4.1

The contractor shall submit Contract

Data Requirements List (CDRLs) as required IAW the required timetable.

Acceptable if the contractor submits

Contract Data Requirements List

(CDRLs) as required IAW the required timetable

Definitions:

** Validated customer complaint – A customer complaint that is reviewed, documented, and confirmed via a Corrective Action Report (CAR).

4 CDRL SUMMARY

Contract information data shall be delivered electronically in accordance to the corresponding requirement for each Data Item listed in Table 4-1 (below). The contractor shall have no more than one error per quarter for all CDRL submittals. The contractor shall submit CDRLs according to the due date indicated and have no more than one CDRL per quarter submitted after the identified due date. Grammatical errors do not count as an error. Substantive mistakes shall be corrected within two working days and corrective action taken to prevent recurrence of inaccurate late CDRLs.

Table 4-1

DATA

ITEM

TITLE DELIVERY DATE

A001 Maintenance Service Report NLT five (5) calendar days upon completion of service.

A002 Training Certification Within thirty (30) calendar days of contract award.

A003 Safety Plan NLT fifteen (15) calendar days after contract award

5 ADDITIONAL REQUIREMENT

5.1 Government Provided Support

The Government will provide necessary working space, including heat, light, ventilation, and electrical powered outlets for the use of contractors’ maintenance personnel. The Government shall provide access to the necessary facilities where the equipment resides. The place of performance shall be Hill Air Force Base (AFB), UT.

Government telephones shall be used for official business only.

The contractor shall be responsible for safeguarding all Government property provided for contractor use.

5.2 Base Access

Contractor will schedule all visits and coordinate Base entry by contacting Mitch Smolcha, Mitchel.Smolcha@us.af.mil, (801) 586-4543, or Rhodora Niel, Rhodora.Niel@us.af.mil, (801)

586-4526. The contractor shall be escorted at all times.

6 CONFLICTS OF INTEREST

The Contractor shall not assign to contract or task order performance any person, including any employee of the U.S. Government, if employing that person would create a conflict of interest under any law, regulation or policy of the United States Government. Additionally, the

Contractor shall not assign to contract or task order performance, any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD Directive 5500.7-R and any other applicable regulation or policy of the Department of the Air Force or its subordinate commands, as applicable, including but not limited to Air Force Materiel Command.

7 GENERAL INFORMATION

7.1 Hours of Operation

7.1.1 Normal Hours of Operation: The contractor shall perform the services required under this contract during the following hours: Monday through Friday 0600-

1500 – EXCEPT FEDERAL HOLIDAYS and other base closures.

7.1.2 Federal Holidays: Unless otherwise required by the Government, the contractor shall not have access to the Government facilities on the following federal holidays: New Year’s Day, Martin Luther King’s Birthday, Washington’s

Birthday, Memorial Day, Independence Day, Juneteenth, Labor Day, Columbus

Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If a holiday falls on

Saturday, it is observed on Friday and working hours are Monday through

Wednesday for that week. If the holiday falls on a Sunday, it is observed on

Monday. Any other circumstances that may prompt base closure, such as Days of

National Mourning, may also restrict opportunity to perform the exchanges. In the event of a base closure, exchanges shall be performed on the next business day. There may also be up to six AFMC Goal Days and four Wingman Days per year awarded to Government civilian employees, as well as possible weather related days and Government directed holidays. On these days, the contractor shall not generally be required to work and the Government shall not be billed for work not performed.

7.1.3 NOTE: Good Friday is regarded as a holiday by the Utah Wage Determination;

however, Good Friday is not a Federal Holiday so the Government facilities will be open for work that day. The contractor shall plan on employees working business as usual on that day, unless the Government supervisor or section chief determines that such services are either unnecessary or will be less than a full normal workday.

7.1.4 Down Days/Weather Days: The Government will notify the contractor when official notice has been given for Energy/Weather Down days. The contractor is not expected to work on any Energy/Weather Down days.

7.1.5 Rescheduling: Down Days/Weather days may be rescheduled if conditions/emergency operations require.

7.2 Conservation of Utilities

The contractor shall instruct their employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities.

8 ENVIRONMENTAL CONTROLS

8.1 Hazardous Work Environment

8.1.1 The Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas. The industrial complex at Hill AFB has the potential to expose workers to hazardous materials which may include, but is not limited to: hexavalent, chrome, cadmium, beryllium, lead, and others. While the Contractor shall not perform duties in a regulated area (where exposure are expected to exceed the permissible exposure limits set by 29 CFR1910.10xx), there may be contact hazards with these materials. The contractor shall ensure proper protective measures and training is taken to ensure contracted employees are protected from hazards. The 75th Air

Base Wing (ABW) Bio-Environmental Engineering Flight produces BIO Survey of these areas which will be made available upon award.

8.1.2 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and

Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.

8.2 Notification of Environmental Spills

If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the 809th “Spill Team” located in the BLDG 100 laboratory. The liability for the spill or release of such substances rests solely with the contractor and its agent.

8.3 Safety Program

8.3.1 The contractor shall implement a safety program that ensures protection of

Government personnel and property. (See Appendix C)

8.3.2 In the event of an accident/mishap, the contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. An email copy of the mishap / incident notification shall be sent within three calendar days to the 809th

MXSS/MXDEC Shop Supervisor, who will forward it to OO-ALC safety.

9 GOVERNMENT OBSERVATIONS

During the period that the contractor is working on the Test Stands, Government personnel, other than CO, may, from time-to-time, observe contractor operations. However, these personnel may not interfere with contractor performance.

10 FOREIGN OBJECT DAMAGE (FOD) AND TOOL CONTROL

10.1 The contractor shall follow the applicable guidance in chapters/paragraphs/sections of AFI

21-101 and HQ AFMC, Hill AFB, and 309 MXW supplements to the AFI 21-101 concerning base tool (chapter 10 section B), and FOD control policies (chapter 14, and sub paragraphs designated as 41), daily. Cloth rags are considered tools and will follow the same regulations and procedures as tools.

10.2 If tools, and/or equipment are lost, the contractor will report the loss to the GM/COR no later than two hours after discovery. If tools are lost or not accounted for, then the contractor shall implement the lost tool procedures of AFMC supplement to AFI 21-101, chapter 10, section B.

10.3 Contractors performing functions in industrial areas on the center shall have a method for controlling and accounting for all tools used. All contractors working on the center shall inventory their tools at the beginning and end of each shift and at the end of each task to check for any lost or missing tools.

11 ENVIRONMENTAL:

Weather Hazards. Workers may encounter hazardous weather conditions including snow, heavy rain, lightning, extreme dust, and other conditions that warrant appropriate precautions.

APPENDIX A – ACRONYMS AND ABBREVIATIONS

Acronym/Abbreviations Definition AF Air Force

AFB Air Force Base

AFI Air Force Instruction

AFMC Air Force Material Command

ANSI American National Standards Institute

ASO American Standards Organization

CAC Common Access Card

CAR Corrective Action Report

CDRL Contractor Data Requirements Listing

CFR Code of Federal Regulation

CMRA Contractor Manpower Reporting Application

CO Contract Officer

COR Contracting Officer Representative

DoD Department of Defense

EPA Environmental Protection Act

FAR Federal Acquisition Regulation

FE Facility Engineer

FOD Foreign Object Damage

HAFB Hill Air Force Base

IAW In Accordance With

IC Ion Chromatography

IEC International Electrotechnical Commission

ISO International Organization for Standardization

NELAP National Environmental Laboratory Accreditation Program

OEM Original Equipment Manufacturer

OSHA Occupational Safety and Health Act

PE Performance Evaluation

POP Period of Performance

PWS Performance-Based Work Statement

QCP Quality Control Plan

SS Service Summary

TO Technical Order

TCIR/DART Total Case Incident Rate/Days Away Restricted or Transferred

VPP Voluntary Protection Program

APPENDIX B – EQUIPMENT LISTING

Spectro ICP System

Spectro Arcos FHM22 – S/N 18009857

Teledyne ASX-280 Auto sampler – S/N 121815A280

APPENDIX C: SAFETY

SAFETY, FIRE PROTECTION AND HEALTH

SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

OGDEN AIR LOGISTICS COMPLEX

UNITED STATES AIR FORCE

HILL AIR FORCE BASE, UTAH 84056

FULL SERVICE MAINTENANCE, REPAIR AND CALIBRATION FOR SPECTRO

ARCOS INDUCTIVELY COUPLED PLASMA

8 December 2021

Reviewed by:

Kimberly Zike

OO-ALC/SE

801-775-3957

Control Number: KZ211203

Maintenance Service Report

A. Safety Program Requirements

The contractor shall implement a safety program plan that ensures protection of

Government personnel and property. (CDRL A003) The program shall consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B1 below.

2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific

Requirements, and shall be used during the performance of the work described in the contract. The Safety Plan shall be approved by OO-ALC/SE (Safety Office) prior to commencement of any work described in this contract.

3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.

4. Competent personnel to provide surveillance of the Safety Plan.

5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.

6. All contractor personnel shall be trained and qualified to perform their duties safely.

7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.

B. Mishap Notification

1. The contractor shall notify OO-ALC/SE (801-777-3972) or the Hill AFB Command Post

(801-777-3007) after normal duty hours, and the designated Government Representative

(GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one

(1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to

DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of ALL the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (Events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor to repair/replace)

(f) Nomenclature of equipment and personnel involved in accident/incident

(g) Corrective actions (taken or proposed)

(h) Other pertinent information

2. The contractor shall cooperate with any and all government mishap investigations.

Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance

Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.

3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.

4. The contractor shall support and comply with the safety investigation and reporting requirements of DAFI 91-204, Chapters 1 – 5.

C. General Safety Requirements:

If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force

Occupational Safety and Health Standards (AFOSH STD), to include AFMAN 91-203, Air

Force Occupational Safety, Fire, and Health Standards, DAFI 91-204, Safety

Investigations and Reports, Contract Safety, and the protection of their employees.

Additionally, the contractor is responsible for the safety and health of all subcontractor employees.

The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.

Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal

Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.

http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0

SECTION II – SPECIFIC REQUIREMENTS

The contractor’s prepared Safety Plan shall:

Provide contact information for on-site personnel

Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures

Identify employee safety and health training requirements and the documentation process

The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:

PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians

DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.

MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive

5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4;

DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety

Program, 22 May 07; Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition:

AFI 13-213, Airfield Management, 29 Jan 08, Paragraphs 1.3.6 and 4.4.2.1 applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.

HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in

OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.

File details come from the government source that posted it. Updated .