SPECS-Rynglok.docx
DOCX document 28 KB Posted
- Attached to
- Rynglok Field Tubing Kit
- Solicitation number
- FA489726Q0019
About this file
This is a specification sheet for aircraft structural maintenance equipment required by the 366th Maintenance Squadron at Mountain Home Air Force Base, Idaho. The specification details requirements for two Rynglok tubing field kits that must be delivered no later than 30 days after contract award. Each kit must include a hydraulic pump with gauge rated for minimum 8,000 PSI, a hydro line connecting the pump to the swaging unit, swaging units with head sizes of -03, -04, -05, -06, -08, -10, -12, -16, -20, and -24, correlated go-no-go gauges, marking gauges, and an acceptable carrying case. The kits must demonstrate capability to swage aluminum, steel, and titanium systems.
The contractor is responsible for delivering all equipment, tools, and materials necessary to set up the Rynglok kits in accordance with manufacturer specifications, ensuring proper operation upon delivery, and diagnosing and repairing any non-functional equipment. All components include a one-year warranty. Shipping is included in the quotation, with delivery required to Building 920, Room 131, 230 Phantom Avenue, Mountain Home AFB, Idaho 83648. The contractor must provide technical support by telephone or in person following delivery if any issues arise. This solicitation (FA489726Q0019) is issued by the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPECS-Rynglok.docx | DOCX document | |
| Solicitation - FA489726Q0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION SHEET
Mountain Home AFB, ID Aircraft Structural Maintenance Rynglok Kits 20 March 2026
1. GENERAL: The 366th Maintenance Squadron located on Mountain Home AFB, ID requires Two (2) Rynglok tubing field kits to include all needed verification, axial swaging tooling,pump w/ guage and hose.
2. Rynglok field kit MINIMUM SPECIFICATIONS: Rynglok field kits must (at a minimum) comply with the following salient characteristics:
2.1. Physical Characteristics
2.1.1. Contain pump w/ gauge meeting minimum 8K PSI and connector for pump to hose.
2.1.2. Hydro line to connect from pump to swaging unit.
2.1.3. Swaging units containing -03,04,05,06,08,10,12,16,20, & 24, head units.
2.1.4. above correlated Go-no-Go gauges.
2.1.5. Above correlated marking gauges.
2.1.6 Ability to swage aluminum, steel and titanium systems.
2.1.7 Acceptable carrying case for units
2.2. Warranty
2.2.1. All components: 1 years
3. UPON DELIVERY: The Contractor shall provide all, equipment, tools, materials, and other items needed to setup the requested Rynglok kits.
3.1. The Contractor shall deliver all requested equipment in accordance with (IAW) manufacturer’s specifications.
3.2. The Contractor shall ensure proper operation of the Rynglok kits.
3.3. Any equipment not functioning properly IAW manufacture’s specifications shall be diagnosed and repaired by the Contractor.
3.4 Following completion of delivery by Contractor, the Contractor shall provide technical support if there are any issues either by telephone or in person.
4. SPECIFICS:
4.1. Shipping must be included in the quotation.
4.1.1. Contractor shall deliver to 366 Maintenance Squadron –230 Phantom Ave Bldg 920 Rm 131, Mountain Home AFB ID, 83648
4.1.2. Delivery will be no later than 30 days after date of contract (ADC).
File details come from the government source that posted it. Updated .