SPECS__Kenai_GAOA_Lower_Ski_gravel__Revised(2)_Redacted.pdf

PDF 109 KB Posted

Attached to
GRAVEL MATERIAL BY THE YARD, AK-KENAI NWR
Solicitation number
140FGA24Q0018
Issued by

About this file

This document appears to be a set of technical specifications for a gravel material delivery contract for the Lower Skilak Loop Campground road repair project on the Kenai National Wildlife Refuge.

The key details are:

  • The contract requires the delivery of 1,414 yards of gravel material, including 1,200 yards of pit run, 200 yards of D1 crushed gravel, and 14 yards of additional crushed gravel. There is also an option for up to 400 additional yards of pit run, subject to project needs and funding.
  • Delivery dates are specified, with pit run to be delivered by July 15, 2024, D1 by July 25, 2024, and crushed gravel by August 10, 2024.
  • The contracting agency is the U.S. Fish and Wildlife Service. The solicitation number is 140FGA24Q0018.
  • The government will provide the unloading area and equipment, and the vendor must specify the type of delivery trucks to be used.
  • A technical point of contact for the project is provided.

View the file

Other files

File Type Posted
Sol_140FGA24Q0018_Amd_0002.pdf PDF
Sol_140FGA24Q0018_Amd_0001.pdf PDF
MAPS_0001.zip ZIP file
AMD_1__Q_and_A_0001.pdf PDF
Sol_140FGA24Q0018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Project: Lower Skilak loop campground road repair

Item: Gravel Material

1. Product Features

Road base material delivery requested to Lower Skilak Road, located on the East side of Sterling.

Total amount of material requested: 1414 yards.

- Pit run - 1200 yards.

- D1 - 200 yards

- crushed gravel - 14 yards

- Option Line Item, Pit run: For extra material (300 yards minimum/400 yards max) subject to project needs and availability of funding. If additional material is needed the CO will exercise the option task with-in 30 days from award of base PO. This material would be delivered to the same project location.

2. Delivery

Delivery would be for the location of Lower Skilak Road, near Sterling, Alaska with the pit run delivery first followed by the D1. FWS will be responsible for providing the unloading area and personnel on the ground with equipment to stack or displace the material. Vender will need to specify the type of trucks (i.e., belly dump/14-yard truck) that will be delivering the material so we can ensure we provide a large enough space to unload and turn around.

Delivery of material would need to be:

Pit run - No later than 15, July 2024.

D1 – No later than 25, July 2024 Crushed gravel – Any time before August 10, 2024

2. Technical Point of Contact (POC):