Specs - CIP 26-04 FY 2025-2026 Alley Pavement Rehabilitation Project.pdf

PDF 12 MB Posted

Attached to
Fiscal Year 2025-2026 Alley Pavement Rehabilitation Project, CIP 26-04
Solicitation number
147066
Issued by
Los Angeles County, California

About this file

Summary

This document is a comprehensive specification package for Capital Improvement Project No. 26-04, the FY 2025-2026 Alley Pavement Rehabilitation Project, issued by the City of Downey, Los Angeles County, California. The project encompasses removal of existing asphalt or concrete pavement, placement of new asphalt or concrete pavement, construction of concrete gutters for drainage, adjustment of utility manhole and valve box covers to grade, installation of wayfinding signs, and replacement of uplifted, damaged, or non-standard curb, gutter, cross gutters, sidewalk, driveway approaches, and curb access ramps to comply with Americans with Disabilities Act (ADA) requirements. The bid scope includes 38 line items with quantities ranging from 1 to 3,250 tons of material, including 2,450 cubic yards of pavement removal, various asphalt and concrete construction tasks, and utility adjustments. Bids are due by 11:00 a.m. on Wednesday, November 25, 2026, submitted electronically through the City of Downey Vendor Registration and Bid Opportunities online portal. Pre-bid site inspection is required; bidders must certify completion of site inspection. Award will be made to the lowest responsible bidder meeting all requirements, with contract execution required within 10 days of notification.

The bidder must hold a valid State of California Contractor's License classified as General Engineering Contractor (Class A) and must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. A bid bond of not less than 10 percent of the total bid amount is required, with performance and payment bonds each set at not less than 100 percent of the total bid price. The contractor must comply with California Labor Code prevailing wage requirements (Sections 1770-1781) and shall pay workers no less than specified prevailing rates. All prices must be firm for 60 days following bid opening and include all applicable state, federal, and other taxes. The contract requires comprehensive insurance coverage including public liability, property damage, workers' compensation, and builders risk/course of construction insurance. No set-asides are specified in this solicitation. The project is funded through the City's capital improvement budget, with contract payment on a unit price basis for actual quantities constructed as determined by field measurements or certified weight tickets.

View the file

Other files

File Type Posted
FY 2025-26 Alley Rehabilitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF DOWNEY

LOS ANGELES COUNTY, CALIFORNIA

S P E C I F I C A T I O N S

FOR

CAPITAL IMPROVEMENT PROJECT NO. 26-04

FY 2025-2026 ALLEY PAVEMENT REHABILITATION PROJECT

November 06, 2026

CITY OF DOWNEY

Public Works Department

Engineering Division 11111 Brookshire Avenue

Downey, CA 90241

(562) 622-3468, FAX (562) 904-7296

71932 11/06/2026

Matthew Baumgardner

Director of Public Works/City Engineer

RCE 71932

Date

Bids are due at 11:00 a.m., Wednesday, November 25, 2026 on PlanetBids.

Capital Improvement Project No. 26-04 Table of Contents FY 2025-2026 Alley Pavement Rehabilitation Project Page 1

TABLE OF CONTENTS

SECTION 1

BID NOTICE, PROPOSALS AND INSTRUCTIONS

Notice Calling for Bids .............................................................................................................................NC-1

Proposal .....................................................................................................................................................F-1 Bidding Form ................................................................................................................................F-2 Bid Bond .......................................................................................................................................F-6 Bidder's Qualifications & References ..........................................................................................F-8 Designation of Subcontractors ....................................................................................................F-11 Noncollusion Affidavit...................................................................................................................F-14 Prebid Site Inspection Certification ..............................................................................................F-15

Instructions to Bidders ............................................................................................................................IB-1

1. Contractors Licensing Requirements ...................................................................................IB-1

2. Contractor’s Registration ......................................................................................................IB-1

3. Questions Prior to Opening Bids ..........................................................................................IB-1

4. Obtaining Plans and Specifications .....................................................................................IB-1

5. Proposal Forms-Submittal ....................................................................................................IB-1

6. Proposal Form ......................................................................................................................IB-1

7. Proposal Form-Quantities and Prices ..................................................................................IB-2

8. Bid Bond ...............................................................................................................................IB-2

9. Bidder’s Qualifications Statement ........................................................................................IB-3

10. Designation of Subcontractors .............................................................................................IB-3

11. Noncollusion Affidavit ...........................................................................................................IB-3

12. Examination of Plans, Specifications, and Site of Work ......................................................IB-3

13. Interpretation of Specifications .............................................................................................IB-4

14. Experience ............................................................................................................................IB-4

15. Prices and Payments ...........................................................................................................IB-4

16. Substitutions .........................................................................................................................IB-4

17. Modifying Bid ........................................................................................................................IB-4

18. Bid Opening ..........................................................................................................................IB-4

19. Mistakes in the Bid ...............................................................................................................IB-5

20. Award ....................................................................................................................................IB-5

21. Basis of Award......................................................................................................................IB-5

22. Execution of Contract ...........................................................................................................IB-6

23. Failure to Execute Contract ..................................................................................................IB-6

SECTION 2 THRU SECTION 5

(BLANK)

Capital Improvement Project No. 26-04 Table of Contents FY 2025-2026 Alley Pavement Rehabilitation Project Page 2

SECTION 6

GENERAL CONDITIONS

Article 1 Preliminary Provisions ..........................................................................................................GC-1

1.01 Definitions ...................................................................................................................GC-1

1.02 Representatives .........................................................................................................GC-1

1.03 Permits and Licenses .................................................................................................GC-1

1.04 Waiver ........................................................................................................................GC-1

1.05 Data to be Furnished by the Contractor ....................................................................GC-1

1.06 Plans and Specifications ............................................................................................GC-2

1.07 Lines, Grades, and Measurements ...........................................................................GC-2

1.08 Right of Way ...............................................................................................................GC-3

1.09 Contractors Operations/Storage Yard .......................................................................GC-3

1.10 Utilities ........................................................................................................................GC-4

Article 2 Performance of the Work ......................................................................................................GC-8

2.01 Performance of Work - General .................................................................................GC-8

2.02 No Assignment or Delegation ....................................................................................GC-8

2.03 Standard of Performance ...........................................................................................GC-8

2.04 Defective Work ...........................................................................................................GC-8

2.05 Communications Regarding the Work .......................................................................GC-8

2.06 Working Hours ...........................................................................................................GC-8

2.07 Cost of Overtime Construction Inspection .................................................................GC-9

2.08 Independent Contractor .............................................................................................GC-9

2.09 Emergency Work .......................................................................................................GC-9

2.10 Subcontractors ...........................................................................................................GC-9

2.11 Use of Facilities Prior to Completion of Contract ......................................................GC-10

2.12 Cooperation with Other Work Forces ........................................................................GC-11

2.13 Agreements with Property Owners ............................................................................GC-11

2.14 Protection of Property ................................................................................................GC-11

2.15 Contractor’s Responsibilities for Losses or Liabilities ...............................................GC-11

2.16 Guarantee of Work .....................................................................................................GC-12

2.17 Cleaning and Environmental Controls .......................................................................GC-13

2.18 Solid Waste Disposal and Diversion .........................................................................GC-13

2.19 Recycled, Reusable and Recyclable Products .........................................................GC-14

Article 3 Time of Commencement and Completion ..........................................................................GC-15

3.01 Commencement, Prosecution and Completion of Work ...........................................GC-15

3.02 City’s Discretion to Extend Time ................................................................................GC-15

3.03 Delays and Extensions of Time for Contractor ..........................................................GC-15

3.04 Climatic Conditions ....................................................................................................GC-16

3.05 Safety Hazard ............................................................................................................GC-17

3.06 Completion and Acceptance ......................................................................................GC-17

3.07 Liquidated Damages ..................................................................................................GC-17

Article 4 Construction Progress Schedules.......................................................................................GC-18

4.01 Initial Schedule ...........................................................................................................GC-18

4.02 Revised Schedules ....................................................................................................GC-18

FY 2025-2026 Alley Pavement Rehabilitation Project Page 3

Article 5 Suspension or Termination of Contract..............................................................................GC-19

5.01 Suspension of Work - Default By Contractor ............................................................GC-19

5.02 Suspension of Work without Fault .............................................................................GC-19

5.03 Decision of Engineer Final .........................................................................................GC-19

5.04 Remainder of Contract in Effect ................................................................................GC-19

5.05 Allocation of Cost .......................................................................................................GC-19

5.06 Termination of Contract - Default By Contractor .......................................................GC-20

5.07 Termination of Contract - Contractor without Fault ...................................................GC-21

Article 6 Changes ...............................................................................................................................GC-22

6.01 Changes Initiated By City ..........................................................................................GC-22

6.02 Change at the Contractor’s Request .........................................................................GC-22

6.03 Change Orders – Procedure ......................................................................................GC-22

Article 7 Contract Payments and Claims ............................................................................................GC-24

7.01 General .......................................................................................................................GC-24

7.02 Schedule of Values for Payments .............................................................................GC-24

7.03 Progress Payments ....................................................................................................GC-24

7.04 Final Payment and Release of Claims ......................................................................GC-25

7.05 Force-Account Payment ............................................................................................GC-25

7.06 Claims and Protests – Contract Requirements .........................................................GC-28

Article 8 Materials ...............................................................................................................................GC-30

8.01 General .......................................................................................................................GC-30

8.02 Quality and Workmanship ..........................................................................................GC-30

8.03 Trade Names, “Or Equal,” Substitutions ...................................................................GC-30

8.04 Approval of Materials .................................................................................................GC-31

8.05 Ordering Materials .....................................................................................................GC-31

8.06 Authority of the Engineer ...........................................................................................GC-31

8.07 Inspection ...................................................................................................................GC-32

8.08 Infringement of Patents ..............................................................................................GC-32

Article 9 Submittals ...............................................................................................................................GC-33

9.01 General .......................................................................................................................GC-33

9.02 Product Handling .......................................................................................................GC-33

9.03 Schedule of Submittals ..............................................................................................GC-33

9.04 Shop Drawings ...........................................................................................................GC-34

9.05 Colors .........................................................................................................................GC-34

9.06 Manufacturers’ Literature ...........................................................................................GC-34

9.07 Substitutions ...............................................................................................................GC-34

9.08 Manuals ......................................................................................................................GC-34

9.09 Record Drawings .......................................................................................................GC-35

9.10 Submittals Quantities .................................................................................................GC-35

9.11 Identification of Submittals .........................................................................................GC-35

9.12 Schedule of Submittals ..............................................................................................GC-35

9.13 Coordination of Submittals .........................................................................................GC-36

9.14 Timing for Submittals .................................................................................................GC-36

9.15 Approval by City .........................................................................................................GC-36

9.16 Changes to Approved Submittals ..............................................................................GC-37

FY 2025-2026 Alley Pavement Rehabilitation Project Page 4

Article 10 Safety ...............................................................................................................................GC-38

10.01 Protection of Persons and Property ...........................................................................GC-38

10.02 Protection from Hazards ............................................................................................GC-38

10.03 Differing Site Conditions ............................................................................................GC-39

10.04 Traffic Regulation .......................................................................................................GC-39

10.05 Traffic Control Devices ...............................................................................................GC-40

10.06 Execution ...................................................................................................................GC-40

10.07 Flagging ......................................................................................................................GC-41

10.08 Pedestrian Canopies or Barricade Payments ...........................................................GC-41

Article 11 Indemnity, Insurance and Bonds .........................................................................................GC-42

11.01 Indemnity ....................................................................................................................GC-42

11.02 Public Liability and Property Damage Insurance ......................................................GC-42

11.03 Contractor’s Failure to Obtain, Pay For, or Maintain Insurance ................................GC-43

11.04 Workers’ Compensation Insurance ...........................................................................GC-43

11.05 Builders Risk/Course of Construction Insurance .......................................................GC-43

11.06 Endorsements and Certificate ...................................................................................GC-44

11.07 Bonds .........................................................................................................................GC-44

Article 12 Labor Provisions ....................................................................................................................GC-46

12.01 General .......................................................................................................................GC-46

12.02 Compliance with State Labor Code ............................................................................GC-46

Article 13 ADA and Title VI/Non-Discrimination Assurances .......................................................GC-50

13.01 ADA and Title VI/Non-Discrimination Assurances .....................................................GC-50

SECTION 7 THRU SECTION 14

SECTION 15

SPECIAL CONDITIONS

Section 15-1 - General Requirements ....................................................................................................SC-1

15-1.1 General ......................................................................................................................SC-1 15-1.2 Project Location/Limits .............................................................................................SC-1 15-1.3 Description of Work ..................................................................................................SC-1 15-1.4 Time Limit ..................................................................................................................SC-1 15-1.5 Coordination with City of Downey, Other Agencies, and Utilities ............................SC-2 15-1.6 Working Hours .........................................................................................................SC-2 15-1.7 Construction Staking and Surveying ........................................................................SC-3 15-1.8 Notification of Residents and Businesses ................................................................SC-4 15-1.9 Traffic Control ............................................................................................................SC-4 15-1.10 Safeguarding of Equipment, Materials, and Work ....................................................SC-10 15-1.11 Protection of Work .....................................................................................................SC-10 15-1.12 Material Testing and Special Inspection ...................................................................SC-11 15-1.13 Inspection ..................................................................................................................SC-11 15-1.14 Order of Work and Work Schedule ...........................................................................SC-11 15-1.15 Potholing ...................................................................................................................SC-12 15-1.16 Record Drawings .......................................................................................................SC-12 15-1.17 Stormwater Runoff… ................................................................................................SC-12 15-1.18 Failure to Comply… ..................................................................................................SC-15

FY 2025-2026 Alley Pavement Rehabilitation Project Page 5

15-1.19 Noncompliance with Plans and Specifications .........................................................SC-15 15-1.20 Site Access… ............................................................................................................SC-15 15-1.21 Construction Water ...................................................................................................SC-15 15-1.22 Safety… .....................................................................................................................SC-15 15-1.23 Parkway Restoration .................................................................................................SC-15 15-1.24 Final Cleanup… ........................................................................................................SC-16 15-1.25 Permits and Licenses… ............................................................................................SC-16 15-1.26 Patents and Copyrights… .........................................................................................SC-17 15-1.27 Protection of Improvements… ..................................................................................SC-17 15-1.28 Mobilization… ............................................................................................................SC-18

Section 15-2 – Definition of Bid Items ....................................................................................................SC-19

SECTION 16

EXHIBITS

Contract Agreement .....................................................................................................................Exhibit A Performance Bond .......................................................................................................................Exhibit B-1 Payment Bond .............................................................................................................................Exhibit B-2 General Liability/Automobile Liability Insurance Documentation ................................................Exhibit C-1 Guidance for Submitting Evidence of Insurance to the City of Downey .....................................Exhibit C-2 Notice of Completion ...................................................................................................................Exhibit C-3 Waste Management Plan – Form A ............................................................................................Exhibit D-1 Waste Management Plan – Compliance Report – Form B ........................................................Exhibit D-2 Truck Route Map .........................................................................................................................Exhibit E-1 Trash Pick-up and Street Sweeping Schedule ...........................................................................Exhibit F-1

SECTION 17

APPENDICES

Reference Standards ...................................................................................................................Appendix A

SECTION 18

STANDARD PLANS

Standard Plans for Public Works Construction (SPPWC) 2021

Curb Ramp ...................................................................................................................................111-5 Curb and Sidewalk Joints ............................................................................................................112-2 Sidewalk and Driveway Replacement .........................................................................................113-2 Curb and Gutter Barrier ...............................................................................................................120-3 Cross and Longitudinal Gutters ...................................................................................................122-3 Alley Intersection ..........................................................................................................................130-3 Sewer Manhole Adjustment .........................................................................................................205-3

Construction Plans

CIP No. 26-04 – FY 2025-2026 Alley Pavement Rehabilitation Project

NOTICE CALLING FOR BIDS

NOTICE IS HEREBY GIVEN that the City of Downey is seeking Bids for performing all work necessary and incidental to the completion of Capital Improvement Project No. 26-04 – FY 2025-2026 Alley Pavement Rehabilitation Project.

The Plans and Specifications can be obtained through the City of Downey Vendor Registration and Bid Opportunities online portal: https://www.downeyca.org/our-city/departments/finance/vendor-registration-open-bids.

Electronically Uploaded Bids:

Contractors must upload bids to the City of Downey Vendor Registration and Bid Opportunities online portal:

https://www.downeyca.org/our-city/departments/finance/vendor-registration-open-bids on or before Wednesday, November 25, 2026 at 11:00 a.m. local time.

Bids received after the above-cited time will be considered a late bid and not accepted.

Bids will not be opened publicly, and the City will endeavor to keep such confidential until a preferred service provider is recommended to the City Council.

The work to be performed under this Contract generally consists of the removal of existing asphalt or concrete pavement, placement of asphalt or concrete pavement, construction of concrete gutters to facilitate drainage, adjustment of various utility manhole and valve box covers to grade, and wayfinding signs to direct pedestrians to various City landmarks. In addition, uplifted, damaged, or non-standard curb, gutter, cross gutters, sidewalk, driveway approaches, and curb access ramps will be replaced in order to comply with the latest Americans with Disabilities Act (ADA) requirements.in accordance to Plans and Specification entitled Capital Improvement Project No. 26-04 FY2025-2026 Alley Pavement Rehabilitation Project.

Each bid shall be accompanied by a corporate surety bond issued by a surety company, admitted to do business in the State of California, as guarantee that bidder will, if an award is made to him or her in accordance with the terms of his/her bid, promptly secure Workers’ Compensation insurance, and liability insurance, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the Contract (“Performance Bond”) and for the payment of claims of materialmen and laborers thereunder (“Payment Bond”). Said bidder's bond shall be in an amount of not less than ten percent (10%) of the amount of the bid. The Performance and Payment Bond shall be not less than one hundred percent (100%) of the total amount of the bid price named in the contract. Only bonds issued by companies admitted to do business in the State of California will be accepted in accordance with the Code of Civil Procedure Section 995.311. Failure to submit acceptable Payment and Performance Bonds as required shall result in a rejection of the bid and a forfeiture of the bid guarantee.

The Contractor shall abide by the provisions of the California Labor Code § 1770-1781, et seq. In accordance with the provisions of the California Labor Code § 1773, the general prevailing rates of per diem wages and holiday and overtime work in the locality in which the work is to be performed has been obtained from the Director of the Department of Industrial Relations, a copy of which is on file in the office of the City Clerk of the City of Downey and will be made available to any interested party upon request. The Contractor shall post a copy of the prevailing rate of per diem wages at the job site.

The Contractor, and any Subcontractor under him, shall pay not less than the specified prevailing rates of wages to all workers employed in the execution of the contract.

All projects require the successful bidder to possess a valid State of California Contractor’s License at the time of Contract Award, in accordance with Section 20103.5 of the Public Contract Code. Pursuant to Section 3300 of the Public Contract Code, the City has determined that the Contractor to whom the subject contract is awarded shall possess a valid State of

Capital Improvement Project No. 26-04 FY 2025-2026 Alley Pavement Rehabilitation Project Notice Calling for Bids

NC-2

California Contractor’s License in the Classification of A, “General Engineering Contractor”.

In accordance with California Labor Code Section 1771.1, no Contractor or Subcontractor shall be qualified to (a) bid on or be listed in a bid on or after March 1, 2015, or (b) engage in the performance of this Work after April 1, 2015, unless registered and qualified to perform the Work pursuant to Labor Code Section 1725.5.

Contractor’s performance of the Work described in this Notice Inviting Bids is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.

Each Contractor submitting a bid for his/her other work shall complete and submit all of the forms included in the Project Specifications, Proposal, including but not limited to the Bidder’s Qualifications Statement, Designation of Subcontractors, the Non-Collusion Affidavit, the Pre-Bid Site Inspection Certification and the Signature Page. Failure to include any of these documents with the bid may disqualify the bid.

The City of Downey reserves the right, after opening bids, to reject any or all bids, to waive any informality in any bid received, and to be the sole judge of the merits of the respective bids received. The award of the Contract, if it is awarded, will be to the lowest responsible Bidder whose bid complies with all the requirements prescribed.

Pursuant to California Public Contract Code § 22300, the Contractor at his/her sole cost and expense, may substitute authorized securities for any monies withheld by the City to ensure performance under the Contract.

Questions and Comments. Direct all questions, inquires, and comments regarding these Plans and Specifications only through the online Q&A at: https://www.downeyca.org/our-city/departments/finance/vendor-registration-open-bids, on or before Wednesday, November 18, 2026 at 11:00 a.m. local time.

Submittal. Bids must be uploaded to the City of Downey Vendor Registration and Bid Opportunities online portal:

https://www.downeyca.org/our-city/departments/finance/vendor-registration-open-bids.

Bid Deadline. Bids received after the scheduled Submittal Deadline will not be accepted. The City reserves the right to extend the Submittal Deadline when it is in the best interest of the City.

Bid Modifications. Any Proposer who wishes to make modifications to a bid already received by the City must withdraw his/her bid in order to make the modifications. It is the responsibility of the Proposer to ensure that modified or withdrawn bids are resubmitted before the Submittal Deadline.

Bid Withdrawal. A Proposer may withdraw bid, without prejudice.

Proprietary Information. The original copy of each bid shall be retained for official files and will become public record after the award of a contract unless the bid or specific parts of the bid can be shown to be exempt by law.

NO LATE BIDS WILL BE ACCEPTED.

CITY OF DOWNEY, CALIFORNIA

Maria Alicia Duarte, CMC City Clerk

Capital Improvement Project No. 26-04 Proposal

F-1

PROPOSAL

CAPITAL IMPROVEMENT PROJECT NO. 26-04

FY 2025-2026 ALLEY PAVEMENT REHABILITATION PROJECT

Date: , 2026

TO THE CITY OF DOWNEY, CALIFORNIA

Pursuant to the foregoing Notice Calling for Bids, the undersigned bidder herewith submits a Proposal on the bidding form or forms attached hereto and made a part hereof, and binds himself/herself on award by the City of Downey under this Proposal to execute in accordance with such award a Contract, of which this Proposal and the said Notice to Contractors, Instructions to Bidders, Specifications, and Drawings shall be a part, and to furnish the bond or bonds required by the Specifications. The attached Notice Calling for Bids, Instructions to Bidders, Specifications, and Drawings are made a part of this Proposal and all provisions thereof are hereby accepted.

In the event of a bid dispute based upon the bidder’s submission of this bid and the City’s acceptance of same, the bidder will be required to indemnify, defend and hold harmless at its expense, including the provision of legal counsel, the City, its agents, employees and officers from liability, claims, demands, damages and costs if such dispute or action arises solely upon the award of the bid in compliance with State, Federal and local laws.

The bidder further agrees that, in case of his/her default in executing the required Contract and the required bond or bonds, or furnishing the required insurance, the money payable under the bid bond accompanying his/her proposal shall be applied by the City towards payment of the damage to the City on account of such default, as provided in these Specifications.

Firm: Address:

By:

Authorized Signatory (Print Name)

By: Phone:

Authorized Signatory (Signature)

Title: FAX:

(CORPORATE SEAL)

Nature of firm (corporation, partnership, etc.) and names of individual members of the firm, or names and titles of officers of the corporation.

Corporation organized under the laws of the State of:

Note: All signatures must be notarized. Corporate seal must be impressed hereon in case of corporation.

F-2

BIDDING FORM

Name of Bidder

The undersigned, having examined the proposed Contract Documents and having visited the site and examined the conditions affecting the work, hereby proposes and agrees to furnish all labor, materials, equipment, and appliances, and to perform operations necessary to complete the work as required by said proposed Contract Documents, excluding work of alternates for.

BASE BID

ITEM

NO.

DESCRIPTION

QUANTITY &

UNIT

UNIT

PRICE

SUBTOTAL

1 MOBILIZATION AND DEMOBILIZATION 1 LS $ $

2 CONSTRUCTION STAKING 1 LS $ $

3 STAGING AND TRAFFIC CONTROL 1 LS $ $

4 PUBLIC CONVENIENCE AND SAFETY MEASURES 1 T&M $ $

REMOVE EXISTING PAVEMENT, BASE AND/OR

SUBGRADE MATERIAL

2,450 CY $ $

6 CONSTRUCT 4" AC C2-PG 64-10 OVER NATIVE 3,250 TON $ $

7 CONSTRUCT 3” AC C2-PG 64-10 OVER NATIVE 185 TON $ $

8 CONSTRUCT 2.5” AC B-PG 64-10 BASE PAVEMENT 175 TON $ $

CONSTRUCT 1.5” AC C2-PG 64-10 OVERLAY

PAVEMENT

130 TON $ $

REMOVE EXISTING PAVEMENT AND UNDERLYING

MATERIAL TO A DEPTH OF 6" BELOW EXISTING

ROADWAY FINISH SURFACE AND CONSTRUCT 6"

DEPTH DEEPLIFT

1,600 SF $ $

CONSTRUCT 3’ WIDE PCC LONGITUDINAL

GUTTER PER SPPWC STD. PLAN 122-3

3,500 LF $ $

CONSTRUCT 4’ WIDE LONGITUDINAL GUTTER

PER SPPWC STD. PLAN 122-3

540 LF $ $

CONSTRUCT CROSS GUTTER PER SPPWC STD.

PLAN NO. 122-3

685 SF $ $

REMOVE EXISTING IMPROVEMENTS AND

CONSTRUCT PCC ALLEY INTERSECTION, CASE A,

PER SPPWC STD. PLAN 130-3

5,250 SF $ $

REMOVE AND CONSTRUCT RESIDENTIAL

DRIVEWAY APPROACH PER CITY OF DOWNEY

STD. DWG. NO. 4

1,150 SF $ $

REMOVE EXISTING IMPROVEMENTS AND

CONSTRUCT 4” THICK PCC SIDEWALK PER

SPPWC STD. PLANS 112-2 AND 113-2

2,200 SF $ $

REMOVE AND CONSTRUCT CONCRETE

WALKWAY

20 SF $ $

REMOVE AND CONSTRUCT 6” PCC CURB PER

SPPWC STD. PLAN 120-3, TYPE A1-6.

100 LF $ $

REMOVE AND CONSTRUCT 6” PCC CURB AND

GUTTER PER SPPWC STD. PLAN 120-3, TYPE A2-6.

50 LF $ $

F-3

ITEM

NO. DESCRIPTION

QUANTITY &

UNIT

UNIT

PRICE SUBTOTAL

REMOVE AND RECONSTRUCT 8” PCC CURB AND

GUTTER PER SPPWC STD. PLAN 120-3, TYPE A2-8

100 LF $ $

21 REMOVE EXISTING CURB AND GUTTER 220 LF $ $

22 REMOVE EXISTING CURB 260 LF $ $

CONSTRUCT 6” CURB PER SPPWC STD. PLAN NO.

120-3, TYPE A1-6

80 LF $ $

CONSTRUCT 3” CURB & GUTTER PER SPPWC

STD. PLAN NO. 120-3, TYPE A2-6

100 LF $ $

CONSTRUCT ROLLED CURB PER DETAIL A ON

PLANS

600 LF $ $

26 REMOVE EXISTING REDWOOD HEADER 85 LF $ $

27 INSTALL 2X6X8 REDWOOD HEADER BOARD 650 LF $ $

REMOVE/REPLACE DISTURBED LANDSCAPING

AND IRRIGATION IN KIND.

1 LS $ $

29 ADJUST UTILITY BOX TO GRADE 1 EA $ $

30 ADJUST MANHOLE TO GRADE 18 EA $ $

31 ADJUST WATER VALVE TO GRADE 9 EA $ $

32 ADJUST METER BOX TO GRADE 64 EA $ $

33 ADJUST PULL BOX TO GRADE 4 EA $ $

34 ADJUST UTILITY VAULT TO GRADE 1 EA $ $

35 RELOCATE EXISTING FIRE HYDRANT 1 EA $ $

SALVAGE AND REINSTALL BRICK PAVER

WALKWAY

25 SF $ $

37 REMOVE EXISTING TREE 1 EA $ $

38 STRIPING IMPROVEMENTS 1 LS $ $

TOTAL BASE BID ITEMS - Items 1 to 38 $

(In Words)

NOTE:

1. The City will award the Contract based on the lowest Base Bid. The lowest responsible bidder shall be determined on the basis of the sum of the Total Base Bid. The City reserves the right to award or reject the Base Bid.

2. The quantities listed in the above Bid Form are estimates shown for bid comparison only. Payment will be made at the Contract Unit Price for the actual quantities constructed, based upon field measurements or certified weight tickets where appropriate. The City does not, expressly or by implication, agree that the actual amount of work will correspond therewith, and reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work, as may be deemed necessary or advisable by the Engineer. In case of variation between the unit cost and amount

F-4 shown by bidder, the unit cost will be considered to be his/her bid.

3. Items marked with an asterisk (*), if any, indicate Specialty Items.

4. The price bid shall include all State, Federal, and other taxes applicable to the project, and shall be a firm offers for a period of 60 days after the date of bid opening.

5. Acknowledge receipt of all Addenda. The cover sheet of each addendum issued is signed by the Contractor and attached herewith.

6. The undersigned, under penalty of perjury, acknowledges that they are authorized by the bidding Contractor to submit a bid for said Contractor.

F-5

Respectfully submitted:

Date:

Firm: Address:

By:

Authorized Signatory (Print Name)

By: Phone:

Authorized Signatory (Signature)

Title: FAX:

Attest: (Seal – if Bid is by a Corporation)

Contractor’s License Number:

Date of Expiration:

Contractor’s Dept. of Industrial Relations Registration Number:

Amount of Certified Check or Bid Bond:

Name of Bonding Company:

Note: All signatures must be notarized. Corporate seal must be impressed hereon in case of corporation.

FY 2025-2026 Alley Pavement Rehabilitation Project Page 6

F-6

Bond No. ______________________

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS that:

WHEREAS the City of Downey, California (“City”) has issued an invitation for bids for the work described as follows: CAPITAL IMPROVEMENT PROJECT No. 26-04 – FY 2025-2026 ALLEY PAVEMENT REHABILITATION PROJECT.

WHEREAS______________________________________________________________________________________

_______________________________________________________________________________________________ (Name and address of bidder)

("Principal"), desires to submit a bid to City for the work.

WHEREAS, bidders are required to furnish a form of bidder's security with their bid.

NOW, THEREFORE, we, the undersigned Principal, and that the said Surety’s Office is located at:

Name

Address

Telephone and the Licensed Resident Agent for said Surety is:

Name

Insurance Agent’s License No.

Address

Telephone

("Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of Dollars ($ ), being not less than ten percent (10%) of the total bid price, including alternates, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal is awarded a Contract for the work by the City and, within the time and in the manner required by the bidding specifications, enters into the written form of Contract included with bidding specifications, furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverage, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

In case suit is brought upon this bond, Surety further agrees to pay all court costs incurred by the City in the suit and reasonable attorneys' fees in an amount fixed by the court.

FY 2025-2026 Alley Pavement Rehabilitation Project Page 7

F-7

IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Date: ________________________________________

“Principal” “Surety”

By: __________________________________________ By: __________________________________________

Its lts

By: __________________________________________ By: __________________________________________

Its lts

(Seal) (Seal)

Note: This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. Corporate seal must be impressed hereon in case of corporation.

FY 2025-2026 Alley Pavement Rehabilitation Project Page 8

F-8

BIDDER'S QUALIFICATIONS STATEMENT

1. ORGANIZATION

1.1 How many years has your organization been in business as a Contractor?

1.2 How many years has your organization been in business under its present name?

1.2.1 Under what other names has your organization operated?

1.3 If your organization is a corporation, answer the following:

1.3.1 Date of incorporation:

1.3.2 State of incorporation:

1.3.3 Corporate ID number:

1.3.4 President's name:

1.3.5 Agent for Service of Process:

1.4 If your organization is a partnership, answer the following:

1.4.1 Date of organization:

1.4.2 Type of partnership (if applicable):

1.4.3 Name(s) of general partner(s):

1.5 If your organization is individually owned, answer the following:

1.5.1 Date of organization:

1.5.2 Name of owner:

1.6 If the form of your organization is other than those listed above, describe it and name the principals:

2. LICENSING

2.1 List jurisdictions and trade categories in which your organization is legally qualified to do business and indicate registration or license numbers, if applicable.

List jurisdictions in which your organization's partnership or trade name is filed.

3. EXPERIENCE

NOTE: Answers will be considered in determining bidder responsibility.

3.1 List the categories of work that your organization normally performs with its own forces.

FY 2025-2026 Alley Pavement Rehabilitation Project Page 9

F-9

3.2 On a separate sheet, list major construction projects your organization has in progress, giving the name of the project, owner, architect/engineer Contract amount, percent complete, and scheduled completion.

3.2.1 State total worth of work in progress and under Contract:

3.3 On a separate sheet, list all projects your organization has completed in the past five (5) years, giving the name of project, owner, owner's phone number, project manager, Contract amount, date of completion, and percentage of the cost of the work performed with your own forces. (’None’, ‘N/A’ or its equivalent is not an acceptable response and may be a basis for disqualifying your bid as non-responsive.)

3.3.1

State average annual amount of construction work performed during the past five (5) years:

3.4

Has your organization, acting as a Prime Contractor for a public agency, completed at least one pavement rehabilitation construction project within the last five (5) years? Please list information for such project(s) below:

Name of Project:

Agency/Owner:

Project Manager:

Phone Number:

Contract Amount:

Scope of Work:

Name of Project:

Agency/Owner:

Project Manager:

Phone Number:

Contract Amount:

Scope of Work:

NOTE: Repair, rehabilitation, or maintenance projects will not be considered as new construction.

3.5

On a separate sheet, list the construction experience and present commitments of the key individuals proposed to be used on this project.

3.6 Within the last five (5) years, has any officer or principal of your organization ever been an officer of another organization when it failed to complete a construction Contract? (If the answer is yes, please attach details.)

4. CLAIMS AND SUITS

If the answer to any of the questions below is yes, please attach details.

FY 2025-2026 Alley Pavement Rehabilitation Project Page 10

F-10

4.1 Has your organization ever failed to complete any work awarded to it? ________________________

4.2 Are there any judgments, claims, arbitration proceedings, or suits pending or outstanding against your organization or its officers within the last five (5) years?

4.3 Has your organization filed any law suits or requested arbitration with regard to construction within the last five

(5) years?

5. DEBARMENT AND SUSPENSION

NOTE: Answers will be considered in determining bidder responsibility

5.1 Is your organization or any officer or principal of your organization currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any City or County in the State of California?

5.2 Has your organization or any officer or principal of your organization ever been suspended, debarred, voluntarily excluded, or determined ineligible or ever been a principal or officer of another organization that has been suspended, debarred, voluntarily excluded, or determined ineligible from a City or County in the State of California?

5.3 Does your organization or any officer or principal of your organization have a suspension, debarment, voluntary exclusion, or determination of ineligibility by any City or County in the State of California pending?

5.4 Has your organization or any officer or principal of your organization ever been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct?

5.5 If you answered Yes to any of the above questions, please list and describe each occurrence for which the answer Yes applies along with the individual or organization to whom it applies, the dates of action, and initiating agency.

6. SURETY

6.1 If a performance and/or payment bond is required by this bid, identify the bonding company if arrangements for the bond have been made; If not, identify the bonding company for the Contractor’s most recent project:

6.2 Name and address of agent:

FY 2025-2026 Alley Pavement Rehabilitation Project Page 11

F-11

DESIGNATION OF SUBCONTRACTORS

NAME OF BIDDER: ________________________________________________________________________________

Each bidder shall set forth below:

1. The name and location of the place of business of each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work or improvement, or a subcontractor licensed in the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half of one percent of the Contractor's total bid or $10,000, whichever is greater.

2. The portion and estimated dollar amount of the work which will be done by each subcontractor. The Contractor shall list only one subcontractor for each portion as is defined by the Contractor in his/her bid.

3. If the Contractor fails to specify a subcontractor or if the Contractor specifies more than one subcontractor for the same portion for work to be performed under the Contract in excess of one-half of one percent of the Contractor's total bid or $10,000, whichever is greater, the Contractor agrees that he/she is fully qualified to perform that portion himself/herself, and that he/she shall perform that portion himself/herself.

If after award of Contract, the Contractor subcontracts any such portion of the work, the Contractor shall be subject to the statutory penalties.

This list and subsequent changes thereto, shall be subject to the approval of the City and additionally for cause cited in the public contract code. Submit an updated and approved DESIGNATION OF SUBCONTRACTORS form prior to execution of the City-Contractor Contract.

[REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]

FY 2025-2026 Alley Pavement Rehabilitation Project Page 12

F-12

Please type or legibly print (attach additional sheets as necessary).

Subcontractor’s Name, Phone, Email and Address

Subcontractor’s Item No. of Work or

Trade(s) to be Used Estimated $ Amount License No. DIR Registration No.

FY 2025-2026 Alley…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .