This is a technical specifications document for the City of St. Marys, Georgia, detailing requirements for the Wheeler Street Boat Ramp Boat Launch Dock Gangway Replacement project (Project No. 23-1003). The project involves the design, fabrication, and installation of a new prefabricated aluminum gangway system at GPS coordinates 30°43'12.16"N 81°33'0.35"W on St. Marys Street West at the south end of Wheeler Street. The gangway shall be manufactured by Ravens Marine, Gator Dock & Marine, or a Design Criteria Professional-approved equivalent. All work must comply with standards established by the Aluminum Association, American Institute of Steel Construction, American Welding Society, and applicable ASTM specifications. The gangway system must be designed for a twenty-year life expectancy and carry a five-year warranty covering all materials and workmanship. The contractor must submit engineering calculations sealed by a Georgia-registered Professional Engineer, dimensional layouts, and detailed connection specifications prior to fabrication.

The gangway shall be constructed from aluminum alloy 6061-T6 with 300 series stainless steel hardware suitable for saltwater service. The gangway must withstand a minimum uniform live load of 100 pounds per square foot with allowable deflection of L/240, feature non-skid decking, bilateral handrails with a minimum 42-inch clear distance, and include UHMW polyurethane rollers with stainless steel axles at the dock interface. The hinge connection must include secondary redundancy to prevent separation if welds fail, and the design must accommodate water level fluctuations while protecting the floating dock surface. The installing contractor must have a minimum of five years' experience in comparable gangway manufacturing and installation, and all welders must be qualified in accordance with AWS D1.1/D1.1M for steel and AWS D1.2/D1.2M for aluminum. The specifications emphasize that the contractor is responsible for verifying existing conditions, identifying conflicts, and ensuring construction does not disrupt existing boat launch and recovery operations.

Text of this file

ST. MARYS WHEELER STREET BOAT RAMP

BOAT LAUNCH DOCK GANGWAY REPLACEMENT

ST. MARYS, GEORGIA

TECHNICAL SPECIFICATIONS

Project No. 23-1003

Wheeler Street Boat Ramp Boat Launch Dock Gangway Replacement City of St. Marys

Rev #0 – March 28, 2023 BMG PN 23-1003 133600-1

SECTION 133600

ALUMINUM GANGWAY

PART 1 - GENERAL

1.1 SUMMARY

Work under this section includes the design, fabrication, and erection of a new prefabricated aluminum gangway. This shall consist of furnishing all labor, materials, tools, equipment, and incidentals to provide all metal fabrications, including connections, brackets, connection hardware, and other components as indicated on the Construction Drawings and specified herein.

All prefabricated gangway materials shall be manufactured or distributed by Ravens Marine, Gator Dock & Marine, or Design Criteria Professional-approved equivalent.

Framing/structural components of the gangways shall be designed with minimum safety factors on working stress which conform to those set forth in the latest issue of the Aluminum Association "SPECIFICATIONS FOR ALUMINUM STRUCTURES" for buildings and similar type structures.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 303 (2000) Code of Standard Practice for Steel Buildings and Bridges

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2008) Structural Welding Code – Steel

AWS D1.2/D1.2M (2008) Structural Welding Code – Aluminum

ASME INTERNATIONAL (ASME)

ASME B18.22.1 (1965; R 2003) Plain Washers

ASTM INTERNATIONAL (ASTM)

ASTM A 108 (2003) Standard Specification for Steel Bar, Carbon, and Alloy Cold Finished

ASTM A 123/A 123M (2002) Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A 153/A 153M (2004) Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A 276 (2006) Standard Specification for Stainless Steel Bars and Shapes

ASTM A 325 (2006) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

ASTM A 53 (1999b) Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded, and Seamless

ASTM A 449 (2007b) Standard Specification for Hex Cap Screws, Bolts and Studs, Steel, Heat Treated 120/105/90 ksi Minimum Tensile Strength, General Use

Rev #0 – March 28, 2023 BMG PN 23-1003 133600-2

ASTM A 500 (2003a) Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A 514 (2000a) High-Yield-Strength, Quenched, and Tempered Alloy Steel Plate, Suitable for Welding

ASTM A 572 (2006) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel

ASTM A 563 (2004a) Carbon and Alloy Steel Nuts

ASTM A 653/A 653M (2009) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc- Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A 666 (1996) Annealed or Cold Worked Austenitic Stainless Steel Sheet, Strip, Plate, and Flat Bar

ASTM A 780 (2001) Repair of Damaged and Uncoated Areas of Hot-Dipped Galvanized Coatings

ASTM A 992/A 992M (2006a) Standard Specification for Structural Steel Shapes

ASTM B 209 (2004) Aluminum and Aluminum-Alloy Sheet and Plate

ASTM B 211 (1999) Aluminum and Aluminum-Alloy Bar, Rod, and Wire

ASTM B 221 (2004a) Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM B 308 (1996) Aluminum-Alloy 6061-T6 Standard Structural Profiles

ASTM B 429 (1995) Aluminum-Alloy Extruded Structural Pipe and Tube

ASTM B 547 (1988) Aluminum-Alloy Formed and Arc-Welded Round Tube

ASTM D 1187 (1997; R 2002e1) Asphalt-Base Emulsions for Use as Protective Coatings for Metal

STM E 488 (1996; R 2003) Strength of Anchors in Concrete and Masonry Elements

ASTM F 593 (1998) Stainless Steel Bolts, Hex Cap Screws, and Studs

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS TT-P-664 (Rev D) Primer Coating, Alkyd, Corrosion-Inhibiting, Lead and Chromate Free, VOC- Compliant

THE ALUMINUM ASSOCIATION, INC. (AA)

AA (1986) Specification for Aluminum Structures

1.3 EXPERIENCE

Gangway manufacturers shall have a minimum of five (5) years of experience in the manufacturing and installation of gangway systems that are comparable in size and scope as this project. The gangway system being proposed for this project shall have been successfully installed for a minimum of three years at another location. All manufacturing and installation shall be supervised by personnel with previous satisfactory experience in the manufacturing and installation of two similar dock systems. The gangway system supplier shall have in place a quality control program for the manufacture and installation of the gangway system.

Rev #0 – March 28, 2023 BMG PN 23-1003 133600-3

1.4 WARRANTY

The gangway system, including all structural components, shall be designed for a twenty-year life expectancy. The system shall carry a warranty for five (5) years after project acceptance. The warranty shall be for all materials and workmanship related to the gangway system. The Contractor will not be responsible for damages resulting from improper maintenance or improper use of the gangway system.

1.5 ACCEPTABLE MATERIAL COMBINATIONS

The following material combinations shall be permitted.

1.5.1 Gangways

Aluminum framing and handrails with aluminum decking. The gangway decking shall have a non-skid surface.

1.6 DESIGN REQUIREMENTS

Information presented in this Specification is based upon the Owner's best estimate of those environmental and physical factors that reasonably can be expected to affect the design, performance, and durability of the proposed gangway system. These criteria shall be considered minimum requirements for any proposed gangway system; however, mere conformance to the minimum sizes, strengths, and design parameters given herein will not automatically ensure approval of the gangway system. All proposed gangway system designs shall be subject to thorough engineering analysis using all relevant criteria that could affect the structural integrity of the installed gangway system. Final design calculations shall be prepared and submitted to the Owner, and the Owner shall review the proposed gangway system prior to starting fabrication.

gangway system shall be prepared under the supervision of, and sealed and signed by, a Professional Engineer in the State of Georgia who maintains professional liability insurance with a minimum policy limit of $250,000. Insurance certificates shall be submitted with calculations.

Final calculations shall be signed and sealed by a Georgia Registered Professional Engineer and furnish proof that the floating dock system (floats, piles, pile guides, and gangways), using the criteria specified here as a minimum standard, are designed to withstand the loading, singularly or in combinations given hereinafter, without damage throughout the design life of the system. The load combinations and allowable stresses are detailed hereinafter. The design loads shall be applied at locations and areas as hereinafter defined.

1.7 SUBMITTALS

Submit the following:

A. Qualifications

a. Contractor – The installing Contractor shall be a qualified Marine Contractor or General Contractor.

b. Welders – Qualify welders in accordance with AWS D1.1/D1.1M for welding steel and AWS D1.2/D1.2M for welding aluminum. Use procedures, materials, and equipment required for the work.

B. Design Submittal – To ensure that all specified criteria have been met, the Contractor shall be required to submit the following prior to fabrication during Shop Drawing Phase:

Rev #0 – March 28, 2023 BMG PN 23-1003 133600-4

a. Dimensional layout of gangway components to be furnished under this Contract.

b. Engineering calculations showing compliance with the design criteria specified herein. All calculations will be stamped with the seal of a qualified, licensed Professional Engineer.

Computations shall include, as a minimum, compliance with loading requirements considering bending, deflection, and lateral loads.

c. Calculations shall also include compliance with combined live and dead load requirements considering bending and deflection and the effects of gangways and related loads on floating docks. Minimum load requirements shall be in accordance with the below. Also include calculations of maximum loads and strength at connections (hinges, rollers, tread plates, utilities, etc.)

i. Typical sections or details of the following:

1. Hinge and transition plate details w/ additional safety hasp;

2. Handrail and edge protection connection details;

3. Roller/dock interface detail, including transition plate; and

4. Gangway structural details.

1.8 DELIVERY, STORAGE, AND PROTECTION

Protect from corrosion, deformation, and other types of damage. Store items in an enclosed area free from contact with soil and weather. Remove and replace damaged items with new items.

PART 2 – PRODUCTS

2.1 GENERAL

The following requirements are a minimum and must be met by the Contractor in accordance with the requirements of the aforementioned part entitled general. Alternate approval must be in writing from the design criteria professional. Approval of shop drawings will be required prior to fabrication.

2.2 MATERIALS

All aluminum construction shall be aluminum alloy 6061-T6 and shall be in accordance with AA "Specification for Aluminum Structures.” The material shall be tempered and suitable for saltwater service in accordance with applicable ASTM B 209, ASTM B 211, ASTM B 221, ASTM B 308, ASTM B 429, and ASTM B 547 for various materials used. All welds shall be in accordance with AA "Specifications for Aluminum Structures.”

All bolts, etc. They shall be 300 series stainless steel in accordance with ASTM F 593 and ASTM F 594.

Rollers for gangways shall be UHMW polyurethane with a black ultra-violet light inhibitor added.

PART 3 – EXECUTION

3.1 DESIGN OF GANGWAY SYSTEM

The gangway hinge and transition plates shall be designed to withstand a minimum uniform live load of 100 pounds per square foot applied vertically. Allowable deflection shall be L/240, where "L" is the free span between contact points in inches. The hinge connection to the fixed pierhead shall be designed with a secondary means of redundancy to prevent separation if the knuckle welds fail. The dead load weight of

Rev #0 – March 28, 2023 BMG PN 23-1003 133600-5 the gangway shall be coordinated with the floating dock design to ensure adequate flotation under gangway landing so that the landing area maintains the same freeboard as the rest of the floating docks.

The minimum loads for the handrail and toe rail shall be 250 lb according to requirements of ADAAG Section 15.2. Handrails shall be placed on both sides of the gangway with a minimum clear distance between them of 42 inches. The handrail height and configuration shall conform to any applicable local access codes.

Gangways shall be securely fastened to the fixed structure as the manufacturer recommends.

The decking shall be a non-skid surface to prevent slippage when wet and at a maximum angle.

The gangway connection to the landing shall be able to pivot to compensate for the water level fluctuations and have provisions to reduce hinge wear. The gangway connection to the floating dock shall be outfitted with wheels with stainless steel axles that allow the gangway's bottom to be capable of free movement. The gangway shall include a toe plate the width of the gangway meeting local code requirements. The toe plate and gangway frame shall prevent damage to the floating dock deck during vertical gangway movement. All hardware shall be heavy-duty, suitable for the intended service, and appropriate for a saltwater environment.

3.2 FABRICATION REQUIREMENTS

A. Handrails and transition plates for gangway (see plans) shall be fabricated and installed to generally conform to section 15.2 of the most current Americans with disabilities act accessibility guidelines

(ADAAG).

B. The dockside end of the gangway shall ride on UHMW polyurethane or alternate design criteria professional-approved deck plates installed to provide protection to the dock surface and silent operation during normal and extreme water level movements.

3.3 INSTALLATION

Install items at locations indicated, according to the manufacturer's instructions. Items listed below require additional procedures.

*** End of Section 133600 ***

Technical Specifications Cover
ST. MARYS WHEELER STREET BOAT RAMP
ST. MARYS, GEORGIA
Section 133600 Aluminum Gangways
part 1 - general
1.1 SUMMARY
1.4 WARRANTY
1.5 ACCEPTABLE MATERIAL COMBINATIONS
1.5.1 Gangways
1.6 DESIGN REQUIREMENTS
1.7 SUBMITTALS
1.8 DELIVERY, STORAGE, AND PROTECTION
part 2 – products
2.1 GENERAL
2.2 MATERIALS
part 3 – execution
3.1 DESIGN OF gangway SYSTEM
3.2 FABRICATION REQUIREMENTS
A. Handrails and transition plates for gangway (see plans) shall be fabricated and installed to generally conform to section 15.2 of the most current Americans with disabilities act accessibility guidelines (ADAAG).
B. The dockside end of the gangway shall ride on UHMW polyurethane or alternate design criteria professional-approved deck plates installed to provide protection to the dock surface and silent operation during normal and extreme water level movements.
3.3 INSTALLATION

Other files

File Type Posted
Invitation to Bid —
Specs #2 —
Addendum #1 —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .