Specified_or_Sole_Source_Selection_Form_-_Fillable.pdf

PDF 1 MB Posted

Attached to
GRU Administrative Building Security Fence
Solicitation number
INVITATION TO BID 2026-033
Issued by
Alachua County, Glencoe CDP, Florida

About this file

This is a Specified or Sole Source Selection Form for Gainesville Regional Utilities (GRU), a Florida-based utility provider. The form is used to justify the selection of a single vendor or specified source for procurement rather than conducting a competitive bidding process. GRU is seeking to install a comprehensive security fencing system at its Administrative Building to enhance physical security and access control following two independent professional security vulnerability assessments. The project aims to create a hardened perimeter that deters unauthorized entry, maintains 24/7 operational continuity, integrates with existing electronic access control systems, and protects executive parking areas and high-value infrastructure entry points.

The form provides three justification pathways for sole source selection: replacement parts available only from the original equipment manufacturer (OEM), services requiring copyrighted drawings or specifications available only from the OEM or authorized distributor, or unique goods or services covered under active U.S. patent or copyright protection. Requestors must provide supporting documentation, such as explanation letters from manufacturers and patent or trademark numbers as applicable. The form requires signatures from the requestor, department head, and executive team to authorize the specified or sole source procurement method. No pricing information, set-asides, incumbent data, funding sources, or contract term details are provided in this form, as it serves solely as a justification and approval mechanism for non-competitive procurement selection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 21 Aug 2024

GAINESVILLE REGIONAL UTILITIES

SPECIFIED OR SOLE SOURCE SELECTION

PROJECT NAME: Date:

CHECK ONLY ONE METHOD OF SOURCE SELECTION

SOLE SOURCE:

This is the sole source provider because:

Replacement parts only available from the original equipment manufacturer (OEM)

(Example: Provide explanation letter from the manufacturer)

Services will require copyrighted drawings or specification documents only available from the OEM or authorized OEM service center or distributor.

(Example: Provide explanation letter from the manufacturer)

A unique good or service covered under an active U.S. patent or copyright.

(Example: Provide explanation letter from the manufacturer that includes but is not limited to Patent/Trademark and/or Copyright Number)

SPECIFIED SOURCE:

JUSTIFICATION FOR SPECIFIED SOURCE (REQUIRED):

Requestor Name: Title:

Signature:

Department Head Signature

Executive Team Signature

Fillable Form

PROJECT NAME:
Date:
CHECK ONLY ONE METHOD OF SOURCE SELECTION:
This is the sole source provider because:
undefined:
undefined_2:
undefined_3:
JUSTIFICATION FOR SPECIFIED SOURCE REQUIRED 1:
JUSTIFICATION FOR SPECIFIED SOURCE REQUIRED 2:
JUSTIFICATION FOR SPECIFIED SOURCE REQUIRED 3:
Requestor Name:
Title:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off

File details come from the government source that posted it. Updated .