SPECIFICATIONS
FOR
Wilson Lock Boom Wall Lighting Project
Scope: Contractor to create and provide new As-Built control and wiring diagrams for the Boom Wall Lighting Circuits. Drawings to be reviewed by appropriate USACE personnel. Replacement cabling to be one continuous run. Existing drawings will be provided for use by the contractor as necessary. The deck and flood lighting are to be combined as a single circuit. The Navigation, 120V receptacles, and wind sock light circuits are also to be combined as a single circuit taking the following into consideration.
The light bulb in the wind sock light is to be replaced with a 120V bulb.
A. Provide technical specification for the supply, and installation of work
B. Light Poles- 10/3 SOOW Portable Cord 600V UL/CSA
C. 480V Main Feeder- #6-3C THHN-PVC Tray Cable with Ground
D. Wire connectors/terminations should have proper capacity and properly suited for location being used.
E. Apply circuit identifiers to each conductor in the event troubleshooting is needed.
F. 120V Sock Light/Receptacle/Navigation Light - #8-2C THHN-PVC Tray Cable with
Ground
G. Replacement light bulb in the wind sock light is to be replaced with 120V bulb suitable for harsh environment.
H. 120V, 60Hz control relay(s)
I. Since the lighting fixtures are exterior, upon completion check the seals to ensure watertight integrity is maintained.
J. Upon completion ensure that the lights are still focused to illuminate the appropriate areas.
K. Upon completion of the project and testing is to begin, notify appropriate USACE personnel as they may want to be present to witness the final product.
While work is in progress the Contractor shall keep the area clean. Upon completion of operations, the Contractor shall clean up all scrap and waste resulting from operations and, in general, return the site as much possible to its original condition