Specifications_-_Roof_Replacement.pdf

PDF 2 MB Posted

Attached to
Roof Replacement - Multiple Locations Federal contract opportunity
Solicitation number
140P6422R0007
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Roof Replacement - Multiple Locations, newest first.
File Type Posted
Questions_and_Answers_0001.pdf PDF
Sol_140P6422R0007_Amd_0001.pdf PDF
Technical_Questionnaire.docx DOCX document
Attachment_-_Certification_of_Vaccination_Form.pdf PDF
Sol_140P6422R0007.pdf PDF
Technical_Questionnaire.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Attachment_-_Vaccination_Certification_Notification_Template.pdf PDF
Wage_Determination_-_Summit_Co.pdf PDF
Bid_Schedule_-_Roof_Replacement.pdf PDF
Bid_Schedule_-_Roof_Replacement_(2).xlsx XLSX spreadsheet
Attachment_-_Submittal_List.pdf PDF
Attachment_-_Drawings-Pictures.pdf PDF
Past_Performance_Questionnaire.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page | 1

Cuyahoga River National Park Brecksville, OH 44141

Leyser and Vaughn Roof Replacement

PMIS 245227

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

March 4, 2022

Page | 2

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

DIVISION 07 – THERMAL AND MOISTURE PROTECTION)

Section 07 31 13 – Asphalt Shingles

Submittal photographs plot map

SECTION 01 10 00

Page | 3

DIVISION 1 SHORT FORM GENERAL REQUIREMENTS

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: The Vaughn and Leyser properties have roof systems that have exceeded their 20-year life cycle or show accelerated wear. The gutters and downs are galvanized metal and rusting through in numerous spots with heavy leaks and need to be replaced.

Vaughn complex roof systems are 3-tab asphalt shingles:

A. Vaughn House: Roof surface approximately 2100 sq. ft.

B. Vaughn Barn: Roof surface approximately 2500 sq. ft.

C. Vaughn Gambrel Barn: Roof surface approximately 1900 sq ft with an additional 250 sq. ft. of roll roofing.

D. Vaughn Garage: Roof surface approximately 900 sq. ft.

E. Vaughn Tac House: Roof surface approximately 800 sq. ft.

F. Vaughn Milk House: Rood surface approximately 150 sq. ft.

Leyser complex roof systems are 3-tap asphalt shingles:

A. Leyser House: Roof surface approximately 2300 sq. ft.

B. Leyser Barn: Roof surface approximately 2400 sq. ft.

Work Covered by the Contract Documents:

A. Project Location:

1. Vaughn Property: 9570 Riverview Rd. Brecksville OH 44141

2. Leyser House and Barn: 9640 Riverview Rd. Brecksville OH 44141

Work consists of:

3. Full tear-off of a l l roof systems (approximately 13,300 sf) at areas indicated i n

Item 1-Description of Work, paragraph 1.1 Roof locations are on Drawings or in photographs provided. Install approximately 13,300 square feet of roof covering in kind, match existing color. COR must approve color.

4. Removal of existing roofing system down to existing roof deck.

5. Re-paper after preparation of entire roof area where tear-off occurs, including installation of new roofing system.

6. Removal and installation of approximately 75 LF flashings and counterflashing.

7. Removal and replacement of approximately 690 LF of gutters and downspouts.

New gutters with be brushed aluminum 6” half round with 4” aluminum downs. Gutter hangers will be designed and specified for round gutter installation. Gutter run will be sloped to ensure proper drainage.

Page | 4

8. Removal and replacement of approximately 7 plumbing vents and boots in kind.

9. Removal and replacement of approximately 6 roof vents in kind

10. Removal and replacement of approximately 150 lineal feet of ridge vent

11. Removal and replacement of approximately 40 lineal feet of rotten fascia. Fascia will have two coats of white exterior primer.

12. Removal and replacement of approximately 20 lineal feet of rake board. Rake board will have two coats of exterior primer.

13. Removal and replacement of approximately 1400 lineal feet of drip edge.

14. Removal and replacement of two skylight flashing on Vaughn Tack House measuring approximately 24 inch by 36 inch.

15. Removal and replacement of 250 square feet of asphalt roll roofing on Vaughn

Gambrel Barn addition.

16. Removal and replacement of approximately100 lineal feet flashing on Vaughn

Gambrel Barn.

17. Removal and replacement of approximately 3000 square feet of Ice and Water shield. All eaves and both sides of valleys will have ice and water shield installed.

18. Temporary roofing during construction where required. Temporary roofing shall maintain the project roof is watertight and able to prevent leaks and damage to the building and structure until the reroofing work is completed. Contractor is to make sure that at the completion of work each day the projects roof is 100% watertight.

19. Remove and replace the existing asphalt shingle roof system and associated roof flashings down to deck and patch any openings in the structural decking as required before installing the new roof system, associated metal roof flashings and trims.

Replace existing roof gutters and downspouts. New completed roof system will be of similar type of shingle, shade of color and maintain the same general historic appearance. All structures on the Vaughn property will have same color roof.

20. National Park Service (NPS) requires the existing roof decks to be walked after demolition has been completed with their onsite Contracting Office Representative (COR) or designated Project Inspector prior to installation of any new roof materials to ascertain if any water penetration has caused deterioration or corrosion of the existing decks which are to remain. If there are areas of concern the COR may require the Contractor to perform pull out tests to determine if the existing decking in question can remain or if it will need to be replaced. This can include visible areas of water damage or insect related damage. Testing and replacement of these types of unforeseen damaged areas will be by Change Order if required.

21. Contractor is responsible for ensuring the correct amount of materials are acquired to complete this project in it’s entirety, as listed throughout this project specification.

B. Period of Performance.

Period of performance: Work shall be completed within 120 calendar days after issuance of Notice to Proceed.

ITEM 2 - EXISTING UTILITIES

2. N/A

Page | 5

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

Refer to website: https://www.nps.gov/cuva/getinvolved/commercial-use-authorizations.htm

A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

3.2 Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Homeowners shall have access to buildings at all times.On-site work hours: Work shall be generally performed during normal business working hours of 6:30a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.

The following Federal holidays are observed by the National Park Service:

New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday;

holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan

B. Limits: Roof removal, installation and equipment used to be within a 20’ perimeter C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

http://www.nps.gov/cuva/getinvolved/commercial-use-authorizations.htm https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url%3D2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url%3D2022

Page | 6

D. Limit site disturbance to 20’ around each building

E. Utilities

a. General: Cost or use charges for temporary facilities shall be included in the Contract

Sum as required.

b. Water Service: Water from existing water system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.

c. Electric Power Service: Electric power from existing system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.

d. Toilets: Contractor provided for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.

F. Security and Protection facilities:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

1. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project

Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

2. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR.

a. Restore damaged areas to original condition, repairing or replacing damaged trees and plants, at no additional expense to the Government.

b. Provide temporary barriers to protect existing trees and plants and root zones.

c. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with Contracting Officer Representative and remove agreed-on roots and branches that interfere with construction.

d. Do not fasten ropes, cables, or guys to trees.

3. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.

4. Site Enclosure Fence: Before construction operations begin, furnish, and install portable fencing in a manner that will prevent people and animals from easily entering site and or

Page | 7 storage areas.

a. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations and storage

b. Locate pedestrian entrance gates as required to provide controlled personnel entry.

5. Security Enclosure and Lockup: N/A

6. Temporary Enclosures: N/A

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. No cost specific storage and staging area’s may be discussed at the preconstruction briefing. (l. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

3.5 Preservation of Natural Features: N/A

3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times.

a. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters

b. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

B. New Buildings/Existing Buildings Unoccupied: N/A

Page | 8

3.9 Photo Documentation:

Contractor must provide existing condition, progress and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

A. Existing Condition Images:

Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

B. Construction Progress Images:

1. Maintain organized index for photos with date, description, etc..

2. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

C. Completion Images:

1. Document all completed work within scope of work.

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

3.10 Fire and Life Safety:

As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.

B. Store and handle hazardous materials in accordance with manufacturers and OSHA

29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

i. Immediately report all spills of hazardous materials to the CO, COR and park.

ii. Maintain a spill emergency response kit.

iii. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management

A. Noise Control: Perform air compressor and generator operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or COR.

https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926

Page | 9

B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

1. Do not exceed the following dB(A) limitations at 50 feet:

Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour

2. Maximum permissible construction equipment noise levels at 50 feet:

EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75

C. Ambient Noise:

1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:

a. Residential receiving area :

Daytime: 65 dB Nighttime: 45 dB

b. Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.

Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, standards and organizations which may be used in/referred within the Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.”

https://www.nps.gov/orgs/1671/do-business-with-us.htm

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.

7.2 Submittals:

https://www.nps.gov/orgs/1671/do-business-with-us.htm

Page | 10

A. Accident Prevention (Safety) Plan (APP): Submit a site specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:

1. Name and qualifications of responsible supervisor to carry out the program.

2. First aid and rescue procedures.

3. Training, both initial and continuing.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.

5. Planning for possible emergency situations, such as, power outages and wind storms.

Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

6. Contractor to identify nearest location of medical facility for emergencies

7. Recognition that work will be performed in remote areas with limited communication or cell phone coverage if applicable.

8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute

"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA

29CFR 1926 Subpart E.

B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by

Page | 11 the Contractor in a manner satisfactory to the Contracting Officer.

C. All PPE will be serviceable at all times. At a minimum, maintain four sets of PPE including hard hats and all other Accident Prevention Plan required equipment.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE: If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Technical Specification

Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR

B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.

C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)

3. A comprehensive breakdown of the Schedule of Values.

Page | 12

4. Accident Prevention (Safety) Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Quality Control Plan.

8. Waste Management Plan

9. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP) Submitted to AHJ

(Authority Having Jurisdiction). <<define who AHJ is within this document here>>

10. Contractors Commissioning Plan

11. Historic Preservation Treatment Plan Submitted to AHJ (Authority Having Jurisdiction).

<<define who AHJ is within this document here>>

12. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selection. Paint samples shall be actual paint finish drawdown for all project colors.

1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.

D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).

E. After approving submittals, Contracting Officer and/or COR will return one copy to the Contractor.

If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

Page | 13

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendors.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.

Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application.

Submit digital copy electronically (PDF preferred) of all required documents. Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work.

For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.

ITEM 10 – TEMPORARY SERVICES

10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.

Page | 14

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.

11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be complete following the final inspection with minor comments, the

COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.

B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the CO.

D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.

E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

F. Disposition of any permits and warranties required by the specifications in this section.

11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. 1-year Construction Warranty on all labor and workmanship shall be based on date of final acceptance. This is determined/issued by COR/CO and contractor during the project closeout phase. This warranty does not include the individual manufacturer’s part or product implied warranties.

B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.

C. Information shall include operation and maintenance manuals for each warranted product.

Page | 15

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

All product/materials contained in the below sections are subject to FAR Clause 52.211-6 Brand Name or Equal.

Despite a manufacturer and product being listed, it is a suggested product, but all products/materials are brand name or “or equal”.

Brand name or equivalent product must use manufacturer’s instructions and recommendations for product installation/application.

CUVA 245227 December 15, 2021

Div. 7 V. 2021-10-18 Page | 1

ASPHALT SHINGLES 073113

SECTION 073113

ASPHALT SHINGLES

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. Project Location: Cuyahoga National Park, 15610 Vaughn Rd. Brecksville OH 44141

B. Buildings: 1. Vaugh House: 9570 Riverview Road, Brecksville, OH 44141.

2. Leyser House and barn: 9640 Riverview Road, Brecksville, OH 44141.

1.2 SUMMARY

A. Section Includes:

1. Complete roof Demolition.

2. Glass-fiber-reinforced asphalt shingles.

3. Underlayment materials.

4. Vents and plumbing stack boots.

5. Sheet metal flashing and trim.

6. Gutter and downspouts.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.4 ACTION SUBMITTALS

A. Product Data: For the following:

1. Asphalt shingles to include fasteners.

2. Underlayment materials.

3. Ridge vents.

4. Asphalt roofing cement.

5. Elastomeric flashing sealant.

6. Vents and plumbing stack boots.

7. Sheet metal flashing and trim.

Page | 2

8. Gutters and downspouts (half round 6” brushed aluminum with 4” downspouts)

9. Drip Edge

B. Sustainable Design Submittals:

1. Product Test Reports: For roof materials, documentation indicating that roof materials comply with Solar Reflectance Index requirements.

C. Shop Drawings: For sheet metal flashing and trim.

D. Samples: For each exposed product and for each color and blend specified.

1.5 INFORMATIONAL SUBMITTALS

A. Product test reports.

B. Research reports for synthetic underlayment.

C. Sample warranty.

1. Material warranty.

2. Roofing installer warranty.

1.6 SUBMITTAL COORDINATION

A. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of the submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.8 QUALITY ASSURANCE

A. Installer Qualifications: An authorized installer who is trained and approved by manufacturer.

1.9 WARRANTY

A. Materials Warranty: Manufacturer agrees to repair or replace asphalt shingles that fail within specified warranty period.

1. Materials Warranty Period: 30 years from date of Substantial Completion, prorated, with first 10 years nonprorated.

2. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds of up to 130 mph (58.1 m/s) for 15 years from date of Substantial Completion.

3. Algae-Resistance Warranty Period: Asphalt shingles will not discolor for 20 years from date of Substantial Completion.

http://www.arcomnet.com/sustainable_design.aspx?topic=6

Page | 3

B. Roofing Installer’s Warranty: Roofing installer to provide and sign a Roofing Installer’s Warranty in which Installer agrees to repair or replace components of asphalt-shingle roofing that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Five years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Exterior Fire-Test Exposure: Provide asphalt shingles and related roofing materials identical to those of assemblies tested for Class A fire resistance in accordance with American Society of Testing Materials (ASTM) E108 or UL 790 by Underwriters Laboratories or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing agency.

B. Wind Resistance: Provide asphalt shingles that comply with requirements of

ASTM D7158/D7158M, Class H.

C. Energy Performance, ENERGY STAR: Provide asphalt shingles that are listed on the DOE's "ENERGY STAR Roof Product List" for steep-slope (2:12 or greater) roof products.

D. Solar Reflectance Index (SRI): Three-year-aged SRI not less than 0.15 or initial SRI not less than 0.25 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency.

E. Shingles:

1. Mineral granular-surfaced asphalt shingles.

a. Self-sealing.

b. Square tab.

c. Fungus-resistant.

d. Impact resistant shingles, Class 4.

e. Type I, weighing not less than 290 pounds per 100 square feet.

2.2 GLASS-FIBER-REINFORCED ASPHALT SHINGLES

A. Laminated-Strip Asphalt Shingles: ASTM D3462/D3462M, laminated, multi-ply overlay construction; glass-fiber reinforced, mineral-granule surfaced, and self-sealing.

1. Basis of Design: Atlas Pinnacle Pristine High-Performance Shingles.

2. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Atlas Molded Products; a Division of Atlas Roofing Corporation.

b. CertainTeed Corporation.

c. GAF.

d. Owens Corning.

e. Tamko Building Products, Inc.

f. Other Approved Equals.

3. Strip Size: Manufacturer's standard approximately 42 inch.

4. Algae Resistance: Granules resist algae discoloration.

http://www.arcomnet.com/sustainable_design.aspx?topic=28 http://www.specagent.com/Lookup?ulid=4726 http://www.specagent.com/Lookup?uid=123457152155 http://www.specagent.com/Lookup?uid=123457152156 http://www.specagent.com/Lookup?uid=123457152154 http://www.specagent.com/Lookup?uid=123457152159 http://www.specagent.com/Lookup?uid=123457152161

Page | 4

5. Impact Resistance: Underwriters Laboratory (UL) 2218, Class 4.

6. Fire Resistance: UL 790 for Class A.

7. Color and Blends: As selected by COR from manufacturer's full range.

B. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles.

2.3 UNDERLAYMENT MATERIALS

A. Synthetic Underlayment: UV-resistant polypropylene, polyolefin, or polyethylene polymer fabric with surface coatings or treatments to improve traction underfoot and abrasion resistance;

evaluated and documented to be suitable for use as a roof underlayment under applicable codes by a testing and inspecting agency acceptable to authorities having jurisdiction.

1. Basis of design: RhinoRoof U20, as manufactured by InterWrap, Inc.

a. Product requirements include the following minimum characteristics listed below:

1) Permeability ASTM E96 - .05 perms.

2) Water Transmission ASTM D4869 – pass.

3) Tear Strength ASTM D4533 – MD 30 lbs (14 kg).

4) Tensile Strength ASTM D751 – MD 80 lbs (36 kg).

5) Bursts Strength ASTM D751 – 150 psi (1033 kPa)

6) Nominal Thickness ASTM D1777 – 6 mils (0.15 mm).

7) Width Per Roll – 36 inches.

2. Manufacturers: Subject to compliance with requirements, provide products by one of the

a. Atlas Roofing Corporation.

b. CertainTeed Saint-Gobain.

c. GAF.

d. Owens Corning.

e. Tamko Building Products, Inc.

f. Other Approved Equals.

B. Valleys, Eaves, Rake, and Roof/Wall Intersections: Install Self-Adhering, Polymer-Modified

Bitumen Sheet: ASTM D1970/D1970M, minimum 55-mil- (1.4-mm-) thick sheet; glass-fiber-mat-reinforced, polymer-modified asphalt; with slip-resistant top surface and release backing; cold applied. Material to be supplied in 36 inch wide rolls. Provide primer for adjoining concrete, masonry, and metal surfaces to receive underlayment as recommended by the manufacturer.

Approved product includes but is not limited to the following:

1. Grace Ice & Water Shield; Grace Construction Products.

2. WinterGuard Waterproofing underlayment; CertainTeed.

3. RhinoRoof Granulated Self-Adhered underlayment.

4. Other Approved Equals.

2.4 VENTS

A. Rigid Ridge Vent: Manufacturer's standard, rigid-section, high-density, UV-stabilized plastic ridge vent for use under ridge shingles. Provide vents to match the size and net free area of the existing vents being replaced.

http://www.specagent.com/Lookup?ulid=9296 http://www.specagent.com/Lookup?uid=123457152955 http://www.specagent.com/Lookup?uid=123457152918 http://www.specagent.com/Lookup?uid=123457152205 http://www.specagent.com/Lookup?uid=123457152207 http://www.specagent.com/Lookup?uid=123457152209

Page | 5

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

a. VenturiVent Plus, as manufactured by Air Vent Inc.

b. Certainteed Ridge Vent - 12".

c. Owens Corning VentSure.

d. Other Approved Manufacturers.

2. Minimum Net Free Area: 18 sq. in. per ft.

B. Hood / Static Vent: Where shown on the drawings install slant-back, box type vents with minimum free area of 50 sq. inches (0.35 sq. ft) with filters. Provide vents to match the size and net free area of the existing vents being replaced. Color to be selected by COR from manufacturer’s standard finishes. Approved products as manufactured by but not limited to the

1. Air Vent, Inc.

2. CertainTeed.

3. Broan.

4. Other Approved Manufacturers.

2.5 ACCESSORIES

A. Asphalt Roofing Cement: ASTM D4586/D4586M Type II, asbestos free.

B. Roofing Nails: ASTM F1667, , stainless steel, minimum 0.120-inch- (3-mm-) diameter, sharp-pointed, with a 3/8- to 7/16-inch- (10- to 11-mm-) diameter flat head and of sufficient length to penetrate 3/4 inch (19 mm) into solid wood decking or extend at least 1/8 inch (3 mm) through sheathing less than 3/4 inch (19 mm) thick.

1. Where nails are in contact with metal flashing, use nails made from same metal as flashing.

C. Synthetic Underlayment Fasteners: As recommended in writing by synthetic-underlayment manufacturer for application indicated.

2.6 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Full Roof Tear-off: Removal of existing roofing system down to existing roof deck or structure.

2. Temporarily protect existing roofing system and components that are to remain as required from damage.

3. Existing roof drains and roof drainage shall be protected during each stage of reroofing, and roof-drain plugs shall be installed when demolition is taking place so that debris cannot be lost down the drains. Contractor shall remove all drain plugs when demolition is completed in the area affecting the drain.

4. Do not remove more roof than can be replace in a day, and the roof will be made watertight each night.

Page | 6

5. Remove debris and materials so as not to impose excessive loads on supporting roof, structure or framing.

6. Dispose of demolished items and materials promptly.

B. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Reinstall items in locations indicated, or in original locations as required. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

3. Lightning protection to be removed and reinstalled by a certified installer.

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.

D. Inspect deck after tear-off of roofing system.

1. If broken or loose fasteners that secure deck panels to one another or to structure are observed, or if deck appears or feels inadequately attached, immediately notify COR.

a. Do not proceed with installation until directed by COR.

2. If deck surface is unsuitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify COR.

a. Do not proceed with installation until directed by COR.

E. Disposal of Demolished Materials:

1. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain NPS's property, remove demolished materials from Project site.

a. Do not allow demolished materials to accumulate on-site.

b. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

2. Burning: Do not burn demolished materials.

3. Disposal: Transport demolished materials off NPS's property and legally dispose of them.

F. Cleaning:

1. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

2.7 SHEET METAL FLASHING AND TRIM

A. Performance Requirements:

1. General: Sheet metal flashing and trim assemblies shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction.

Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.

Page | 7

2. Sheet Metal Standard for Flashing and Trim: Comply with National Roofing Contractors Association’s (NRCA's) "The NRCA Roofing Manual" and Sheet Metal and Air Conditioning Contractors National Association’s (SMACNA's) "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.

3. Single Ply Roofing Industry (SPRI) Wind Design Standard: Manufacture and install copings and roof edge flashings tested according to SPRI ES-1 and capable of resisting the following design pressure:

a. Design Pressure: 30 psf vertical design pressure.

4. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

B. Sheet Metal:

1. General: Protect mechanical and other finishes on exposed surfaces from damage by applying strippable, temporary protective film before shipping.

2. Metallic-Coated Steel Sheet: Provide zinc-coated (galvanized) steel sheet according to ASTM A 653/A 653M, G90 coating designation or aluminum-zinc alloy-coated steel sheet according to ASTM A 792/A 792M, Class AZ50 coating designation, Grade 40;

prepainted by coil-coating process to comply with ASTM A 755/A 755M.

a. Surface: Smooth, flat.

b. Exposed Coil-Coated Finish:

1) Two-Coat Fluoropolymer. American Architectural Manufacturers Association

(AAMA) 621. Fluoropolymer finish containing not less than 70 percent Polyvinylidene Fluoride (PVDF) resin by weight in color coat. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.

c. Color: As selected by COR from manufacturer's full range.

d. Concealed Finish: Pretreat with manufacturer's standard white or light-colored acrylic or polyester backer finish, consisting of prime coat and wash coat with minimum total dry film thickness of 0.5 mil.

C. Underlayment Materials:

1. Synthetic Underlayment: Laminated or reinforced, woven polyethylene or polypropylene, synthetic roofing underlayment; bitumen free; slip resistant; suitable for high temperatures over 111 deg C (220 deg F); and complying with physical requirements of ASTM D 22/D 226M for Type I and Type II felts.

D. Miscellaneous Materials:

1. General: Provide materials and types of fasteners, solder, protective coatings, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim

Page | 8 installation and as recommended by manufacturer of primary sheet metal or manufactured item unless otherwise indicated.

2. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal or manufactured item.

a. General: Blind fasteners or self-drilling screws, gasketed, with hex-washer head.

1) Exposed Fasteners: Heads matching color of sheet metal using plastic caps or factory-applied coating. Provide metal-backed Ethylene Propylene Diene Monomer (EPDM) or Polyvinyl Chloride (PVC) sealing washers under heads of exposed fasteners bearing on weather side of metal.

2) Blind Fasteners: High-strength aluminum or stainless-steel rivets suitable for metal being fastened.

b. Fasteners for Zinc-Coated (Galvanized) or Aluminum-Zinc Alloy-Coated Steel

Sheet: Series 300 stainless steel or hot-dip galvanized steel according to ASTM A 153/A 153M or ASTM F 2329.

3. Sealant Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealant tape with release-paper backing.