Specifications Mount Coolidge.pdf

PDF 62 KB Posted

Attached to
Base Course Gravel CSP
Solicitation number
23IFB8394
Issued by
Codington County, South Dakota

About this file

This document is a set of specifications for a state and local contract opportunity to purchase and deliver base course gravel to Custer State Park in South Dakota. The work involves furnishing labor, tools, equipment, and materials necessary to construct the gravel surfacing at the location shown on the plans. The aggregate for the gravel surfacing must conform to specific gradation requirements. The gravel will be picked up by National Guard trucks and hauled to Mount Coolidge between June 9-23, 2023. The contract opportunity requires bidding on two tonnage amounts: 2,000 tons or 2,500 tons, with the Custer State Park choosing the best tonnage for the project.

The pricing for this contract opportunity is not explicitly stated. There are no set-asides, incumbent information, or funding details provided. Interested bidders are required to contact Jayme Severyn at (605)280-1811 to schedule a site visit.

View the file

Other files

File Type Posted
SDVendorManual_20211221.pdf PDF
Specifications Fisherman Flats Road.pdf PDF
Fisherman Flats Road Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE COURSE GRAVEL SURFACING

PART 1 - GENERAL

1.1 DESCRIPTION

A. The work shall consist of furnishing all labor, tools, equipment and materials necessary to construct the gravel surfacing at the location shown on the plans.

PART 2 - MATERIALS

2.1 The aggregate for gravel surfacing shall consist of sound durable particles of gravel and sand, which may include limited amounts of fine soil particles. The gravel surfacing shall conform to the following gradation requirements:

Sieve Size Percent Passing by Weight

1" 100 3/4" 80-100 1/2” 68-91 No. 4 42-70 No. 8 29-58 No. 40 10-35 No. 200 3.0–20.0

Plasticity Index: 0-6

PART 3 - EXECUTION

3.1 Gravel will be picked up by National Guard Trucks and hauled to Mount

Coolidge.

Contact Jayme Severyn at (605)280-1811 to schedule a site visit.

Haul dates June 9-23, 2023.

Gravel needs to be bid in the two tonnage amounts

2,000 ton

2,500 ton

CSP will choose which tonnage will work best for the project.

File details come from the government source that posted it. Updated .