Specifications_Kenai_NWR_Enclosed_Trailer_0001.pdf
PDF 149 KB Posted
- Solicitation number
- 140FGA24Q0001
About this file
This document provides specifications for an enclosed tandem axle trailer to be delivered to the Kenai National Wildlife Refuge. The Fish and Wildlife Service requires delivery of one enclosed trailer no later than July 5, 2024 with dimensions between 7'x14'x7' and 8'x16'x7'. Acceptable manufacturers include Mirage, Wells Cargo, Pace American, and Cargo Mate. The trailer must have a rear ramp door, side man door, and ball hitch. Delivery is FOB destination with the contractor responsible for packing, marking, transport, and risk of loss or damage until receipt by the refuge. Installation is also the contractor's responsibility and must comply with industry standards. Primary and secondary points of contact are provided for delivery coordination no less than three days before the scheduled delivery date. The government will not provide labor, equipment, or assistance for unloading or installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Amendment_2_0002.pdf | ||
| Sol_140FGA24Q0001_Amd_0002.pdf | ||
| Notice_to_Offerors_0001.pdf | ||
| Sol_140FGA24Q0001_Amd_0001.pdf | ||
| Price_Schedule_0001.pdf | ||
| Sol_140FGA24Q0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Project: R7 GAOA Trailer
PR Number:
Item: Enclosed Work Trailer
1. Product Features:
Name of Item: Enclosed, tandem axel trailer
Manufacturer: Mirage, Wells Cargo, Pace American, Cargo Mate, Mission.
Model Number: Preferred equipment- none preferred
Salient Characteristics
Body Type – Enclosed, aluminum Minimal size – 7’x14’x7’ V-nose Maximum size – 8’x16’x7’ Hitch type – ball Axles – tandem Doors – rear: ramp side: man door
2. Delivery:
Deliver by: (July 5th, 2024)
Kenai NWR 33398 Ski Hill Rd, Soldotna, Alaska 99669
Prices quoted must be FOB Destination
Contractor responsibilities. The contractor shall -- (1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements.
(2) Prepare and distribute commercial bills of lading.
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract.
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract.
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery
5. Technical Point of Contact (POC):
Primary - Jason Nystrom, Jason_Nystrom@fws.gov, 907-315-8206 Secondary - Julian Torres, julian_torres@fws.gov , 907-717-1654
6. Delivery Instructions:
No later than three days prior to delivery, please contact the Point of Contact listed above, to arrange a specific time for delivery. Unloading the product is the sole responsibility of the delivery carrier. No labor or equipment will be provided by the government to unload the supplies/equipment.
7.0 Customer Specific Delivery Requirements N/A
8.0 Installation:
Prices quoted must include installation of all parts and/or accessories. All labor and parts associated with and required for installation are the sole responsibility of the contractor. No assistance or equipment will be provided by the government. Installation shall be completed according to industry standards.