SPECIFICATIONS_FOR_THE_PURCHASE_OF_TWO_145kV_CIRCUIT_BREAKERS.pdf

PDF 401 KB Posted

Attached to
SPECIFICATIONS FOR THE PURCHASE OF TWO 145kV CIRCUIT BREAKERS
Solicitation number
FKEC BID #26-10
Issued by
Florida

About this file

This is a specifications document for the purchase of two 145kV circuit breakers issued by FKEC (Florida Keys Electric Cooperative) in Florida. The power circuit breakers must be three-phase, sixty hertz units designed for outdoor use on an effectively grounded system with a maximum line-to-line voltage of 145 kV. The bid package requires potential bidders to review the complete specifications provided in the documentation to understand all technical requirements and submission procedures. The document does not specify response dates, due dates, site visits, bidder's meetings, award dates, or contract terms within the available information.

The specifications document does not contain explicit pricing terms, set-asides, incumbent information, funding amounts, or other financial details in the portions reviewed. Bidders should consult the complete bid package for comprehensive information regarding pricing requirements, payment terms, any applicable set-asides, and all other relevant procurement conditions and technical specifications necessary to submit a competitive quote.

View the file

Other files

File Type Posted
FKEC_BID_2610_AWARD_POSTING.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALL FOR QUOTES

Florida Keys Electric Cooperative Association, Inc. (FKEC), hereby gives notice to prospective bidders that quotes will be received by FKEC, at the Procurement Department, procurement@fkec.com until 2:00 p.m. on April 30, 2026 for:

FKEC BID #26-10

SPECIFICATIONS FOR THE PURCHASE OF TWO 145kV CIRCUIT BREAKERS

In order to insure an open and full competitive bidding process and maintain compliance with FEMA’s Procurement Guidance for Recipients and Subrecipients Under 2 C.F.R. Part 200 (Uniform Rules), FKEC has instituted DemandStar and Vendor Link systems to provide current information to potential bidders. These systems will allow you to receive bid information quickly and at your convenience 24 hours a day, seven days a week. Specifications may be obtained from the website at www.DemandStar.com or www.myvendorlink.com.

Registered vendors will be notified automatically of all Requests for Quotes.

Anticipated Solicitation Schedule

April 16, 2026 Call for Bid

April 27, 2026 Questions Due

April 30, 2026 Bids Due

May 7, 2026 Intent to Award

NOTE: The above anticipated solicitation schedule is subject to change. FKEC will entertain questions for clarification until April 27, 2026 at 2:00 pm. All questions must be submitted in writing by email to procurement@fkec.com, or via the VendorLink website. No questions will be answered after that date.

Each proposal should constitute an offer to FKEC, as outlined therein, and should be irrevocable after the time announced for the opening thereof.

FKEC reserves the right to reject any or all quotes, to waive irregularities and informalities in any or all quotes, and to separately accept or reject any item, items, bid schedule or bid schedules of the quote which FKEC deems to be in the best interest of FKEC.

/s/ Adam Pierce

Adam Pierce Purchasing, Procurement, and Warehouse Manager mailto:procurement@fkec.com http://www.demandstar.com/taf/agencycp.taf?_function=list&A=335 file://///10.11.24.8/Safety/Procurement/Bid%2018-05/www.myvendorlink.com mailto:procurement@fkec.com

FKEC GENERAL INFORMATION

Florida Keys Electric Cooperative (FKEC) is the private, non-profit power utility for the Upper and Middle Florida Keys. Headquartered in Tavernier, Florida, FKEC provides electricity from the Seven-Mile Bridge to Ocean Reef and the Monroe County Line, and services more than 33,000 meters. FKEC presently has an authorized workforce headcount of 123, with an actual headcount of 120. FKEC recognizes the Union as the exclusive collective bargaining agent for all employees of FKEC working in the Union classified positions. Employees are divided between two work locations: Tavernier and Marathon, and among nine departments: Executive, Finance, Human Resources, Safety, Engineering, Information Technology, Transmission, Distribution, and Member Services.

The Cooperative was formed as a corporation in the state of Florida in 1940, and in 1944 was recognized by the Internal Revenue Service as being federal income exempt tax under section 101(10) of the Revenue Act of 1939 (now section 501 (c) (12) of the Internal Revenue Code). FKEC currently imports all of its power supply and uses local generation for emergency back-up only. The utility relies on power from the mainland because it is far less expensive than local generation.

Today, FKEC maintains a highly respected position within its local community, and within the National Rural Electric Cooperative Association, for its dedication to reliable electric service and forward thinking initiatives.

FKEC and its representatives have exercised due care in preparing this Request for Quote (RFQ). All information contained herein is believed to be substantially correct. However, bidders should verify information independently if desired. FKEC and its representatives do not warrant the accuracy of information contained herein.

SCOPE OF SERVICES

I. GENERAL DESCRIPTION

FKEC is seeking quotes to purchase two 145kV circuit breakers. The Power Circuit Breakers shall be three-phase, sixty hertz for outdoor use on an effectively grounded system with maximum line-to-line voltage of 145 kV. The breaker shall be designed for three-pole gang tripping and closing.

Sulfur hexafluoride (SF6) gas shall be the dielectric and interrupting medium. The design of the interrupters shall incorporate the SF6 gas interrupting medium. The breaker design shall be dead tank.

All bids must specify a Not to Exceed (NTE) cost and the lead time of delivery including transport costs to Florida Keys Electric Cooperative substation, 105901 Overseas Highway Key Largo, FL 33037. FKEC will offload at site from Monday – Thursday from 8am-2pm with one week notice of delivery. FKEC will use a boom truck to offload the breakers from a trailer.

II. STANDARDS

The equipment shall meet the performance requirements of and be designed, manufactured, and tested in accordance with the latest applicable standards of:

A. American National Standards (ANSI)

B. International Electrotechnical Commission (IEC)

C. Institute of Electrical and Electronics Engineers (IEEE)

D. National Electrical Manufacturers Association (NEMA)

E. American Society of Mechanical Engineers (ASME)

In the event of conflicts, specifications, drawings, and standards shall govern in that order.

Standards shall take precedence over other standards in accordance with the above priority list.

Latest applicable standards shall be those in effect as of date of quotation.

III. POWER CIRCUIT BREAKER RATINGS

A. Voltage Rating.

145 kV

B. Current Rating

1. Continuous current (60 Hz) – 2000 A

2. Max. symmetrical interrupting capability - 40,000 A

3. Close and latch capability - 108,000 A (Peak)

4. Three second short time current carrying capability - 40,000 A

C. Insulation Level

1. Basic impulse level (withstand) - 650 kV

2. Low frequency (RMS) withstand - 365 kV

3. Insulators may be of porcelain, in accordance with applicable IEC, ANSI, and NESC requirements.

4. Bushings shall be of Extra-Creep (preferred minimum 177 inches) to allow for the High Contamination zone of the Florida Keys. Alternatives may be considered called out through RFP exception.

D. Operating Voltages

1. Closing voltage – 125 VDC

2. Tripping voltage - 125 VDC

3. Motor - 125 VDC

4. Heaters – 120/240 VAC

5. Light and receptacle – 1 @ 120 VAC, single phase

E. Rated maximum interrupting time (60 Hz) basis - 3 cycles.

F. The breaker shall be capable of de-energizing capacitor banks, transformers and transmission lines with charging currents as high as 400 A.

G. Breaker shall be capable of 180° out of phase switching.

H. Breaker shall be capable of O-CO-15 sec. CO duty cycle without derating.

I. Minimum number of stored CO operations, without operation of the charging motor shall be: One O-CO operating sequence.

J. The breaker shall meet all performance requirements in ambient temperatures ranging from -30°C to +60°C.

IV. CIRCUIT BREAKER CONTROL

A. Trip Circuit Requirements

1. Each breaker shall be equipped with two (2) electrically and mechanically independent trip coils. The failure of one trip coil shall not damage or impair the operation of the other coil. The design must be such that the simultaneous energization of both trip coils shall not prevent the breaker from tripping.

2. Fused disconnect switches shall be provided for the trip circuits.

3. Trip circuit operating voltage shall be 125 VDC. Trip circuits shall operate properly within the voltage ranges specified in standards, as measured at the circuit breaker.

B. Closing Circuit Requirements

1. Closing circuit operating voltage shall be 125VDC. Closing circuit shall operate properly within the voltage ranges specified in standards, as measured at the circuit breaker.

2. A fused disconnect switch shall be provided for the closing circuit.

C. Breaker Wiring

1. All control devices and alarms shall be connected to terminal blocks located in the breaker control cabinet.

2. All current transformer (CT) leads shall be connected to short circuiting type terminal blocks using States brand shorting terminals located in the breaker control cabinet. The short circuiting strips of these blocks shall be grounded. All CT leads shall be #10 AWG.

3. All terminal blocks except CT blocks shall have States sliding links (Part#: EM-25012- T) connectors and all wiring terminations shall be made using ring tongue connectors using Burndy YAV or equivalent.

4. All terminal blocks shall be adequate to receive #10 AWG control cable terminals.

5. All control wiring within the breaker cabinet shall be #14 minimum type SIS.

6. Legible machine printed sleeve type wire markers shall be provided at each end of wires over six inches in length.

D. Auxiliary Switches

1. The manufacturer shall supply multi-contact auxiliary switches.

2. Up to 20 contacts, “a” and/or “b” shall be made available for customer's use.

E. Trip and Close Devices

1. A local trip and close pushbutton shall be provided in the breaker control cabinet.

2. The breaker shall be equipped with a mechanical position indicator that is visible from the outside of the cabinet to allow positive confirmation of breaker position.

3. The breaker shall have a mechanical operation counter.

F. Control Cabinet

1. The breaker control cabinet shall be of stainless steel (316 grade is preferred) outdoor weatherproof design, with no vents or louvers in cabinet or door, including stainless steel hinges and doors for opening with provisions for holding doors in the open position (at approximately 120⁰) and a handle with three point latch and padlocking provisions for holding doors in closed position.

2. All breaker controls, terminal blocks, etc., shall be consolidated in the control cabinet, including current transformer secondaries.

3. The Purchaser shall furnish a 60 Hz, 120/240 VAC, single phase power supply to the breaker. The Manufacturer shall furnish appropriate terminals in the control cabinet for terminating the Purchaser's single-phase service and fused knife switches for the control circuit.

4. The control cabinet shall be furnished with suitable heaters, with 1 heater on an adjustable thermostat and the other heater with no thermostat, to prevent condensation. The 1 heater with no thermostat shall be of a wattage to allow continuous operation.

5. The control cabinet shall have internal, LED lighting controlled from a door switch, and a 120 VAC, 20 A, single phase, non-GFI receptacle. The receptacle shall be accessible from outside the cabinet and have a weatherproof in-use cover.

6. The control cabinet shall be mounted at an operating height and location that does not require the use of a step or ladder for maintenance.

7. All wiring and connections within the control cabinet shall be readily accessible for maintenance and not behind mechanism or other obstructions.

8. Wireway systems with removable covers shall be used and be large enough to accommodate all existing and future (remote) wiring. The use of stick-on adhesive back anchors for securing wires is unacceptable.

V. BUSHING CURRENT TRANSFORMERS

A. The circuit breaker shall have a quantity of 18 multi-ratio, bushing-type current transformers, 3 per bushing. Ratio shall be 1200:5. Bushing current transformers shall conform to the following requirements:

1. CT's shall conform to ANSI Standard C.57.13-2008, or latest revision thereof. The accuracy shall be C800.

2. Continuous Thermal Current Rating Factor (R.F.) of 2.0.

B. Current transformers shall be designed to permit addition or removal in the field without removal of bushings. Current transformer leads shall be continuous without junctions or splices to maintain the lowest possible resistance and decrease possible failure points.

Current transformers, which are integral and encapsulated in urethane material, are not acceptable.

VI. OPERATING MECHANISM

A. The breaker operating mechanism shall be electrically trip free with anti-pump feature.

B. The breaker operating mechanism shall be spring only with a “charged” / “discharged” semaphore.

C. The operating mechanism shall be capable of storing O-CO operating sequence, and furnished with a motor capable of recharging in 10 seconds.

D. The breaker shall monitor spring charge with time delayed remote alarm contacts.

E. The spring charging motor shall be provided with a DC motor.

VII. CIRCUIT BREAKER SF6 SYSTEM

A. Manufacturer shall supply an SF6 gas system with stainless steel piping using minimal connections in order to reduce leakage points. SF6 gauge shall be temperature compensated and have graduated PSI markings. Density monitor shall be temperature compensated and located external to the mechanism cabinet or frame in order to reduce vibration, which may cause shifting in set points over time. Density monitor must have a test valve in between the monitor and tank to allow testing without draining SF6 from main tanks. There shall also be a gate valve with a ¼” NPT fitting on the output end tapped into the SF6 piping located in same section of piping as the density monitor for a sample port. Density monitor shall have a 4-20mA output for SF6 pressure remote indication, in psi, to terminal block in control cabinet. Transmitter must be located near or inside density gauge to allow test valve to separate transmitter from main tanks for testing.

B. Circuit breaker pressure vessels must be tested in accordance with current ASME code requirements and include pressure relief devices as a safety measure. All vessels with volumes that necessitate the ASME pressure vessel testing shall include a “U” stamp placard.

C. Manufacturer shall perform leak integrity checks on all cast vessels at manufacturing site, using Helium as the tracer molecule under vacuum to ensure leak tightness.

D. Manufacturer, or authorized factory representative, shall perform leak integrity checks on entire breaker at commissioning and shall furnish Owner appropriate documentation.

E. The SF6 system shall have an alarm contact for remote alarming and a trip/block close scheme installed from the factory upon low SF6 at lockout SF6 level.

VIII. BUSHINGS

A. Subject to Owner approval, bushings shall be hollow, porcelain, extra-creep, 650 kV BIL minimum, filled with SF6 gas common to the breaker tanks.

B. Bushings shall be ANSI #70 Light Gray in color.

C. Terminals shall be 4-hole NEMA pads suitable for customer connections, with cable bus connectors, to be furnished by others.

IX. OTHER FEATURES AND ACCESSORIES

A. The interrupter tanks for the proposed breaker are made of cast aluminum and are not painted. Also unpainted are the spun aluminum current transformer housings. The control cabinet and hardware shall be made of stainless steel and, if applicable, will be painted ANSI #70 gray. The frame and leg extensions shall be hot-dipped galvanized or stainless steel.

B. The circuit breaker shall have all three poles mounted on a common steel frame with legs that bolt directly to the foundation.

C. Two universal ground pads shall be provided, one each on opposite sides and ends of breaker. Pads shall allow the use of NEMA 2-bolt ground paddles.

D. Maintenance Tools

1. One set of specialized general maintenance tools shall be provided for each breaker, if applicable to the breaker. Metric size wrenches or sockets are not considered as special.

2. The breaker shall have provisions for connecting a travel recorder.

E. The breaker shall be shipped fully assembled except for the extension legs and bushing terminals. The breaker shall have at least 5 psig at 20ºC SF6 gas during shipment.

Manufacturer shall provide:

1. All required SF6 gas to top off breaker at site. All SF6 shall be supplied in Aluminum cylinders (like the Dilo Part# A-122CF) and shall include papers of ownership for FKEC unless manufacturer covers shipping and packing costs for return of cylinders.

2. Test values of breaker SF6 gas for density, purity, and moisture content;

3. Owner with factory test results.

F. Nameplates

1. A breaker nameplate mounted inside the breaker control cabinet with the following data:

a. Manufacturer's name and address.

b. Breaker type and model number.

c. Breaker serial number.

d. Rated nominal and maximum voltages.

e. Rated voltage factor K.

f. Rated continuous current.

g. Rated symmetrical interrupting capacity at maximum rated voltage.

h. Rated frequency.

i. Rated BIL.

j. Quantity of insulating medium in pounds.

k. Operating ranges of control circuit voltages.

l. Date of manufacture.

2. A current transformer nameplate, also inside the control cabinet, with the following data:

a. CT ratios and polarity.

b. CT connections.

c. Drawing number of saturation and phase angle, and ratio correction factor curves, if metering accuracy.

X. TESTS

A. The circuit breaker shall receive and pass all production tests as per ANSI C37.09, including a 60 Hz. AC HIPOT test on the completely assembled three-pole breaker.

B. A complete wiring and control circuit test and check shall be made with complete verifications of all circuits.

C. The Manufacturer shall submit certified reports of production tests within two weeks of the tests being completed satisfactorily. The test results shall be submitted electronically in native test format and also PDF versions. Printed copy of test results shall be added to all print copy instruction manuals.

XI. DRAWINGS

A. One (1) set of drawings shall be sent for approval. Drawings shall include breaker outline, schematic, wiring diagram, bushing outline, nameplates, current transformer secondary excitation and phase angle, ratio correction curves for metering CT's.

B. Wiring diagrams shall be of the point-to-point type. Terminal point tabulations are not acceptable.

C. Computer generated drawings in AutoCAD (.DWG) version 2024 compatible format shall be sent for all final drawings. Copies of final drawings are not required, except for the following:

1. An electronic copy of instruction books in PDF format covering installation, operation and maintenance.

2. An electronic copy of production test reports shall be sent within two weeks of the tests being completed satisfactorily.

3. A transmittal sheet shall be sent with all drawings showing order number and list of drawings with drawing numbers.

4. One paper copy of the breaker instruction book, test results and one set of drawings shall be shipped in a pocket on the inside of the control cabinet door.

XII. PROPOSAL DATA REQUIRED

A. Coil Ratings

1. Trip coil amperes, each.

2. Close coil amperes

B. Power Requirements

1. Motor load - H.P & amps.

C. Physical Characteristics

1. Total weight of breaker

2. Overall dimensions

3. Pounds of SF6 gas.

4. Bushing terminal details.

D. Rating of Circuit Breaker Including:

1. Max. symmetrical interrupting capability - amperes (RMS).

2. Three second short time current capability - amperes (RMS).

3. Closing and latching capability - amperes (RMS).

4. Rated closing time - cycles.

5. Voltage range factor K.

6. Number of stored CO operations.

E. Product Information

1. Outline drawing.

2. Bushing drawing.

3. Other descriptive literature.

Exceptions to these Specifications.

XIII. SHIPPING

A. Manufacturer shall use only air-ride equipped trucks, which lower shipping stresses to ensure delivered product integrity, when delivering products under this contract.

B. A travel recorder shall be utilized on each breaker, recording the travel history from the factory to Owners delivery-site. Recorder results shall be made available at time of delivery to Owners facilities.

XIV. SPARE PARTS

A. If SF6 system requires a connection fitting other than a DN8 or DN20, 1 adapter per breaker ordered shall be furnished to adapt to a DN8 fitting.

B. One each of the following must be included:

1. Replacement density gauge and transmitter.

2. Replacement SF6 pressure gauge.

3. Replacement trip and close coil (2 total if same coil for trip and close).

4. Replacement spring charge motor and contactor.

5. Replacement “X” and “Y” contactors or coils if applicable.

6. Replacement heater.

7. Kit(s) line item priced in addition to the NTE price, to changeover breaker from 125VDC to 48VDC (trip/close coils, contactors, motor, etc.).

Submittal Requirements Quotes must be submitted in the format, including heading descriptions outlined below. To be considered, the quote must respond to all requirements stated below. Any other information thought to be relevant, but not applicable to the enumerated categories, should be provided as an appendix to the quote.

Required Information on Attachment A

1. Cost Quote. The cost quote shall identify all costs, including but not limited to taxes, fees, delivery/freight to FKEC Tavernier location. Include the name of Respondent’s company, address, telephone number, and contact person.

2. Description. Include a full description, image, and specifications of the item(s).

3. Schedule. Include the estimated delivery date to the Tavernier, FL Operations Center.

Addenda and Supplemental Information Any and all addenda to the RFQ will be provided to all Proposers who received the initial RFQ and provided contact information to FKEC, should it become necessary for FKEC to make revisions, request additional information, or respond to written inquiries relating to the RFQ. It is the responsibility of potential proposers to timely submit contact information to facilitate receipt of addenda and supplemental information requests, if issued.

Evaluation and Award Criteria A Selection Committee appointed by FKEC will evaluate and rank each Quote.

Review of Quote - FKEC’s designated selection committee will review responses to the RFQ. Selections will be based on completeness of quotes, cost, and delivery timeframe.

Evaluation Criteria – The Selection Committee will evaluate and score quotes on the basis of the responsiveness to the requirements of this RFQ. Quotes will be evaluated on the basis of the following criteria:

Selection Criteria

The following weighted criteria will be utilized to select the company to be awarded this contract:

Cost of Material 50

Manufacturing Quality and Past Performance 25

Availability of Material 25

TOTAL 100

FLORIDA KEYS ELECTRIC COOPERATIVE

PROFESSIONAL SERVICE AGREEMENT

TERMS & CONDITIONS

Scope of Service:

Awarded Bidder will quote for and deliver specified materials under this Agreement as requested and authorized by Florida Keys Electric Cooperative.

Payment:

For items furnished, FKEC shall pay the awarded Bidder upon delivery and receipt of invoice(s). Invoice(s) must include the “Fully Delivered/Not to Exceed” price for each material item delivered.

Change in Scope and Delay If the provisions for payment in the Agreement provide for a fixed fee or a maximum payment for services, such fee or maximum is for the Scope of Services described in the Agreement. If the Scope of Services is modified so that more or less work or time is required, and such modification is accepted by FKEC and the Company, the fee or maximum and the time shall be equitably adjusted.

Right to Inspect FKEC reserves the right to inspect materials at delivery time against the required specifications listed in the Scope of Services. If the delivered material(s) does not meet the required specifications, FKEC reserved the right to not accept delivery of said material(s).

Equal Opportunity The Company will not knowingly discriminate against any employee or applicant for employment because of age, race, color, religion, sex, national origin, marital or veteran status or physical handicap. The Company will take affirmative action to the end that applicants are employed, and that employees are treated during employment, without such discrimination.

Severability and Heading

1. If any part of this Agreement, including, but not limited to, any provision, paragraph, clause, phrase or words, is found to be in conflict with applicable laws, such part shall be inoperative, null and void insofar as it is in conflict with said laws, but the remainder shall be given full force and effect.

2. The descriptive headings used in this Agreement have been inserted for convenience of reference only and shall in no way modify or restrict any of the terms and provisions of this Agreement.

Applicable Law This Agreement shall be interpreted in accordance with the law of the State of Florida.

Work Guarantee The purchase order to procure the item(s) in this Call for Quotes will be valid for the expiration date agreed to by the parties and as depicted on this document listed as the bidder provided “delivery date”. FKEC reserves the right to terminate this purchase order on the listed expiration date, with FKEC bearing no financial responsibility for any materials, equipment, or other goods not yet received by FKEC, regardless of their status relative to fabrication or delivery. Bidders are encouraged to communicate anticipated delivery delays with FKEC to extend this purchase order as needed. Extensions to the purchase order are not binding until agreed to by both parties, in writing.

Attachment A

FKEC BID #26-10 SPECIFICATIONS FOR THE PURCHASE OF TWO 145kV CIRCUIT BREAKERS

COST QUOTE FORM

Please quote the items based on the requirements listed in the Scope of Services, along with a delivery date.

Each item is required to have a “Fully Delivered/Not to Exceed” price.

145kV Circuit Breaker $_______________________

Delivery Date _____________________________

Company Name of Bidder: ______________________________________________________________

Address of Bidder: ______________________________________________________________

Contact Name: ______________________________________________________________

Contact Phone Number: ______________________________________________________________

Contact Email: ______________________________________________________________

BIDDER’S STATEMENT

In consideration of this contract, if awarded, the Vendor agrees without reservation to FKEC’s Terms &

Conditions herein, which will become a part of the contract, the signing of this statement confirms the Vendor’s acceptance.

DATE:

COMPANY NAME: EMAIL:_______________________

SUBMITTED BY:

Print Name & Title

SIGNATURE:

WITNESS:

NOTICE: THIS SIGNATURE PERTAINS TO THE ACKNOWLEDGEMENT AND

ACCEPTANCE OF THE ENTIRE TERMS & CONDITIONS. ANY EXCEPTIONS TO

THIS AGREEMENT SHOULD BE NOTED SEPARATELY.

FAILURE TO COMPLETE ABOVE NOTED DOCUMENT WILL RESULT IN

NON-COMPLIANCE WITH THESE SPECIFICATIONS.

QUOTE ACCEPTANCE

Florida Keys Electric Cooperative Association, Inc. (FKEC) hereby accepts the foregoing Quote of the Bidder, for the delivery of the following:

FKEC BID #26-10

SPECIFICATIONS FOR THE PURCHASE OF TWO 145kV CIRCUIT BREAKERS

COST QUOTE FORM

Florida Keys Electric Cooperative Association, Inc.

By __________________________________

CEO

Scott Newberry

91630 Overseas Hwy

Tavernier, FL 33070

Date of Contract __________________

File details come from the government source that posted it. Updated .