Specifications_for_Lacassine_NWR.pdf

PDF 207 KB Posted

Attached to
CRUSHED LIMESTONE/RIP RAP FOR FWS LACASSINE NWR
Solicitation number
140FS324Q0209
Issued by

About this file

This document is a Scope of Work for the acquisition of limestone rock and rip-rap limestone for the Lacassine National Wildlife Refuge (Lacassine NWR) in Louisiana. The Scope of Work specifies the delivery of approximately 820 tons of #610 limestone and 80 tons of rip-rap limestone to the Lacassine NWR Pool and the Lacassine NWR Pool shop, respectively. The limestone must be delivered and tail-gate spread on designated pool roads, while the rip-rap must be stock-piled at the Lacassine NWR Pool shop. Deliveries are allowed Monday through Friday, excluding holidays, from 7:00 AM to 3:00 PM, and are subject to weather conditions. The Roadway Surfacing Material Form attached to the Scope of Work provides additional details on the delivery requirements. The related Federal Contract Opportunity is a quote request for the crushed limestone and rip-rap for the Lacassine NWR, issued by the U.S. Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
Sol_140FS324Q0209.pdf PDF
Clauses_4Q.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

Lacassine NWR 209 Nature Rd

Lake Arthur, LA 70549

Scope Of Work

Scope of Work for the Acquisition of rock and rip rap Lacassine NWR

Deliver and stockpile approximately 820-tons of #610 Limestone and approximately 80-tons of Rip-Rap Limestone to the following project site. All rock will be delivered, and tail gate spread at the Lacassine NWR Pool (Lat 30.00’04.41N, Lon 92 54’15.19W) except as noted:

Rip Rap to be delivered and stock piled at the Lacassine National Wildlife Refuge Pool shop (Lat 30 00’36.41N, Lon 92 53’41.38 W)

Minimum Requirements

▪ Estimates are to be priced at cost per ton of rock and rip rap per the Scope of Work.

▪ #610 Limestone shall be tail gate spread on the designated Lacassine pool roads (See

Map/Coordinates).

▪ Limestone Rip-Rap shall be stock piled at the Lacassine Pool shop location.

▪ Deliveries will be allowed Monday through Friday (except holidays) 7:00 am- 3:00 pm

▪ and as climatic conditions allow.

▪ Rock will not be delivered if raining or has rained in previous 24 hours.

▪ Weight tickets shall be provided for each load delivered.

▪ ALSO SEE : Roadway Surfacing Materials Form that is attached

ROADWAY SURFACING MATERIAL

1. Station: ____________________________ Date:_____________

Contact:______________________Telephone No.:_____________

2. Material Description (i.e., gravel, aggregate, etc.): _____________

3.

4. Check one or more: __X__ Stock Piled (spot dumped)

_____ Tail Gate Spread Thickness: __________

5. Maximum/Minimum Amount to be delivered daily: ____________ (Insert number of truck loads per day)

6. Attach a delivery and/or local site map.

7. Are there State certified scales in the area? ____ Yes ____ No

NOTE: If yes, weight tickets are required for each delivery.

If no, delivery must be by cubic yards.

8. Required commencement date for delivery: __________________

9. Last date for delivery: ___________________________

10. Local conditions (bridge restrictions, weather conditions, water levels, road flooding, etc.) that may affect delivery: ___________________

The following shall be attached to the acquisition request:

(A) A completed Roadway Surfacing Material Form

(B) Applicable Map

Then forward the acquisition package to:

(1) Appropriate Regional Office Supervisor

Contracting and General Services

Lacassine NWR 7/10/2024 Shane Baxter 337-403-9933

610 gravel (limestone), rip rap (Limestone)

Specification Section/Paragraph/No. (Reference applicable State Unknown

Department Standard and Specification, if known):_____________

Total Tons/Yards Required: _______________820 tons 610 and 80 ton Rip Rap

X 3 inches

As many as possible between the hours of 6-330

X

As soon as practicable with staff schedules

10 days from commencement

N/A

Lacassine scope of work-Limestone contract
A06-R4 Roadway Surfacing Material Form Lacassine NWR
Blank Page

File details come from the government source that posted it. Updated .