Specifications.pdf

PDF 256 KB Posted

Attached to
NOTICE OF INTENT TO SOLE SOURCE - 2. 92 mm male-male air-line calibration kit
Solicitation number
NB672010-24-02098
Issued by

About this file

This document is a Requirements / Specification Document for a 2.92 mm male-male air-line calibration kit requested by the Communications Technology Laboratory at the National Institute of Standards and Technology (NIST). The kit must include seven beadless air-line standards in various lengths, with retractable nuts, gold-coated surfaces, and pin depths within a specified range. Dimensional measurements of the components must also be provided. NIST intends to negotiate a sole-source purchase order with Maury Microwave, Inc. under the authority of FAR 13.106-1(b), as they are the only known vendor capable of providing the required proprietary connector geometry. The NAICS code is 334419 - Other Electronic Component Manufacturing. Interested parties must demonstrate their capability to meet the requirements in writing by June 27, 2024. NIST anticipates award in the 4th quarter of fiscal year 2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: 2.92 mm male-male air-line calibration kit

Requesting Laboratory / Division / Group:

Communications Technology Laboratory, Operating Unit 67 RF Technology Division, Division 672 Guided Wave Electromagnetics Group

General Statement of Need:

The Communications Technology Laboratory (CTL) at the National Institute of Standards and Technology (NIST) has a requirement to produce broadband electrical calibration artifacts as part of its calibration service for scattering parameters. Precision calibration artifacts are required to maintain accurate traceable calibrations for internal and external customers.

To calibrate the scattering parameters of microwave electronics to 40 GHz, a metrology-grade

2.92 mm air-line calibration kit is required.

Item Specifications and Quantities:

Item 1: 2.92 mm air-line calibration kit Quantity: 1 Specifications: 1.1

1.2

1.3

1.4

1.5

The calibration kit shall include the following standards.

1. 2.92 mm male to male beadless airline (1.6 cm)

2. 2.92 mm male to male beadless airline (3.0 cm)

3. 2.92 mm male to male beadless airline (3.6 cm)

4. 2.92 mm male to male beadless airline (5.9 cm)

5. 2.92 mm male to male beadless airline (6.8 cm)

6. 2.92 mm male to male beadless airline (8.5 cm)

7. 2.92 mm male to male beadless airline (15 cm)

Each calibration standard shall have at least one retractable nut that enables visibility of the reference plane when viewed from a perspective perpendicular to the axis of the calibration standard.

Surfaces involved in electromagnetic transmission and reflection shall be gold coated.

The pin depth of all calibration standards shall be in the range from flush to 0.012 mm recessed behind the reference plane.

The calibration standards shall comply with the normative specifications for 2.92 mm metrology grade pin connectors, as specified in IEEE Standard for Precision Coaxial Connectors at RF, Microwave, and Millimeter-Wave Frequencies—Part 1: General Requirements, Definitions, and Detailed Specifications (IEEE Std 287.1-2021).

Item 2: Dimensional measurements Quantity: 1 Specifications: 2.1 Dimensional measurements of conductor diameters and lengths shall be provided for the center conductor, outer conductor, and pin depth of each calibration standard.

Procurement Support Information and Ancillary Services:

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.]

☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder 325

Broadway Boulder, CO 80305

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.]

☐ Direct Delivery to OU Building Required [Explain Need for Requirement] Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:

cwn2 Cross-Out

[List Any Other Requirement]

Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

6 months after contract award date ☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software

☐ Electronic Manuals

☐ License Key

☐ Other:

[List Any Other Electronic Media Requirements]

☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation ☒ N/A

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site

☐ Rigging

☐ Uncrating / Unpackaging

☐ Removal of Packaging Material

☐ Equipment Set Up

☐ Start-Up Services

☐ Turnkey Installation

☐ Other:

[Enter Details]

NOTE: SME shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site

☐ Acceptance Not Expected to Exceed 7 Business Days

☒ Acceptance Expected to Exceed 7 Business Days:

30 days

☐ Inspection and Acceptance Plan:

[Explanation]

☐ Other:

[Enter Other Requirements]

Training ☒ N/A

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees]

☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer]

Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other [Enter Other Scope of Training Requirements]

☐ Training Materials to be Provided by Government:

[Describe Materials]

☐ Training Materials to be Provided by Vendor:

[Describe Materials]

☐ Other [Enter Other Training Requirements]

NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable or Warranty Length: 1 year What is included?

☒ Labor ☒ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period

☐ 2 Option Periods

☐ 3 Option Periods

☐ 4 Option Periods (Maximum)

Calibration ☒ N/A

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements]

☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months]

☐ 2 Option Periods

☐ 3 Option Periods

☐ 4 Option Periods (Maximum)

Maintenance ☒ N/A

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements]

☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months]

☐ 2 Option Periods

☐ 3 Option Periods

☐ 4 Option Periods (Maximum)

Government Furnished Material / Equipment ☒ N/A

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel ☒ N/A

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

☐ Other:

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above

(Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .