Specifications.pdf

PDF 242 KB Posted

Attached to
All-Glass Microwave Microfluidic Wafers Federal contract opportunity
Solicitation number
NB672010-24-02085
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This document is a Requirements/Specification Document for All-Glass Microwave Microfluidic Wafers requested by the National Institute of Standards and Technology (NIST) Communications Technology Laboratory in Boulder, CO.

The document outlines the technical specifications for two items: 1) Encapsulated All-Glass Microwave Microfluidic Wafers (8-inch wafers) and 2) Fused Silica Wafers with Calibration Artifacts (8-inch wafers). Key requirements include the use of high purity fused silica, platinum resistor and conductor layers, specific layer thicknesses and tolerances, polished silicon dioxide layers, hermetically bonded glass channels, and the ability to withstand 100 psi of applied fluid pressure. The document also provides details on procurement support requirements such as shipping, delivery, installation, inspection, warranty, calibration, and maintenance.

This Requirements/Specification Document is associated with a federal contract opportunity for the same All-Glass Microwave Microfluidic Wafers, which is currently in the pre-solicitation phase. The opportunity is being issued by the Department of Commerce National Institute of Standards and Technology, and is classified under NAICS code 334413 for Semiconductor and Related Device Manufacturers. The government is seeking responses from all responsible sources, including small businesses.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: All-Glass Microwave Microfluidic Wafers

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Guided Wave Electromagnetics Group, MS672.01

General Statement of Need:

The National Institute of Standards and Technology (NIST), CTL/RFT, in Boulder, CO has a project funded by the NIST-on-a-Chip Initiative to build on-chip microwave microfluidic devices to measure intermolecular interactions, electrochemical interfaces and biomolecules. There is an urgent need for new strategies to measure dielectric spectra for small batches of high-value pharmaceuticals, specialty chemicals, and catalysts, because the cost to develop a large-scale separation is too high. At the cutting edge of small-batch separations research, chemists control intermolecular interactions to improve the separation efficiency, yield, and purity of the target molecule.

To this end, we require all-glass microwave microfluidic devices to provide enhanced chemical resistance for electrical measurements in a range of frequencies and pressures.

The information from these measurements will be utilized to develop constitutive equations and models of the fluid dynamic response and the intermolecular interactions in solution.

Item Specifications and Quantities:

Item 1: Encapsulated All-Glass Microwave Microfluidic Wafers (8-inch wafers) Quantity: 4 EACH Specifications: 1.1 High purity fused silica for substrate and microfluidic roof wafers.

1.2 One platinum resistor deposition layer (25 nm) on substrate wafer.

1.3 One platinum conductor deposition layer (600 nm) on top of the resistor layer.

1.4 Platinum layers shall be adhered with non-magnetic adhesion layers.

1.5 Metallization layer tolerances of 0.5 microns.

1.6 One patterned silicon dioxide layer (1-5 microns thick) on top of platinum electrode layer, polished with chemical-mechanical polishing to required smoothness of RMS less than or equal to 1 nm.

1.7 Silicon dioxide layer shall be adhered to the platinum

electrode layer with silicon nitride.

1.8 All patterns will be provided by NIST as .gds files.

1.9 Hermetically bonded glass channels to substrate wafer, 100-micron depth channels.

1.10 Channels shall have straight sidewalls achieved through, for example, laser cutting.

1.11 Platinum electrodes must be directly exposed to the channel.

1.12 Platinum electrode ends (at least 500 microns width) must be fully exposed for probe station measurements.

1.13 Any etching for exposure of platinum electrodes must not exceed an over-etch of 50 nm below the substrate surface.

1.14 Temperature treatments of wafers in process should not

exceed 300 degrees Celsius.

1.15 Channel to substrate misalignment tolerance of 10 microns.

1.16 Devices should withstand 100 psi applied fluid pressure.

1.17 Vias to the fluid channels should come through the top wafer

(the wafer with channel etched out).

1.18 Wafers should be fully diced into individual chips.

Item 2: Fused Silica Wafers with Calibration Artifacts (8-inch wafers) Quantity: 1 EACH Specifications: 2.1 High purity fused silica for substrate wafer.

2.2 One platinum resistor deposition layer (25 nm) on substrate wafer.

2.3 One platinum conductor deposition layer (600 nm) on top of the resistor layer.

2.4 Platinum layers shall be adhered with non-magnetic adhesion layers.

2.5 Metallization layer tolerances of 0.5 microns.

2.6 One patterned silicon dioxide layer (1-5 microns thick) on top of platinum electrode layer, polished with chemical-mechanical polishing to required smoothness of RMS less than or equal to 1 nm.

2.7 Silicon dioxide layer shall be adhered to the platinum

electrode layer with silicon nitride.

2.8 All patterns will be provided by NIST as .gds files.

2.9 Platinum electrode ends (at least 500 microns width) must be fully exposed for probe station measurements.

2.9 Any etching for exposure of platinum electrodes must not

exceed an over-etch of 50 nm below the substrate surface.

2.10 Wafer should be fully diced into individual chips.

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☒ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number]

☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☐ Delivery Shall Be Competed No Later Than:

Click or tap to enter a date.

☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up

☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details] NOTE: SME shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☐ Acceptance Not Expected to Exceed 7 Business Days

☒ Acceptance Expected to Exceed 7 Business Days:

14 days

☐ Inspection and Acceptance Plan:

Acceptance testing may include optical inspection and/or electrical testing of representative die.

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

Material / Equipment ☒ N/A

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .