Specifications.pdf

PDF 227 KB Posted

Attached to
Salmon-Challis Forest Wide Hand Pump Repair
Solicitation number
1202NV20Q0015
Issued by

View the file

Other files

File Type Posted
Amendment4.pdf PDF
Amendment3.pdf PDF
Amendment2.pdf PDF
Amendment1.pdf PDF
Exhibit2.pdf PDF
Solicitation.pdf PDF
Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1202NV20Q0015

USDA Forest Service, R-4

FOREST WIDE HAND PUMP REPAIR OR REPLACEMENT AND WELL ABANDONMENT

INDEX OF SPECIFICATIONS

SECTION 011250 - MEASUREMENT AND PAYMENT .............................................. 011250-1 PART 1 - GENERAL .................................................................................................... 011250-1 PART 2 - PRODUCTS (NOT APPLICABLE) ............................................................. 011250-3 PART 3 - EXECUTION (NOT APPLICABLE) ........................................................... 011250-3

SECTION 011900 - MOBILIZATION ............................................................................. 011900-1 PART 1 - GENERAL .................................................................................................... 011900-1 PART 2 - PRODUCTS (NOT USED) ........................................................................... 011900-1 PART 3 - EXECUTION (NOT USED) ......................................................................... 011900-1

SECTION 024101 - DEMOLITION ................................................................................. 024101-1 PART 1 - GENERAL .................................................................................................... 024101-1 PART 2 - MATERIALS- Not Applicable ..................................................................... 024101-1 PART 3 - EXECUTION ................................................................................................ 024101-1

SECTION 033000 - CAST-IN-PLACE CONCRETE ...................................................... 033000-1 PART 1 - GENERAL .................................................................................................... 033000-1 PART 2 - PRODUCTS .................................................................................................. 033000-1 PART 3 - EXECUTION ................................................................................................ 033000-3

SECTION 099100 - PAINTING ....................................................................................... 099100-1 PART 1 - GENERAL .................................................................................................... 099100-1 PART 2 - PRODUCTS .................................................................................................. 099100-1 PART 3 - EXECUTION ................................................................................................ 099100-1

SECTION 221123 – HAND PUMP REPAIR ................................................................... 221123-1 PART 1 - GENERAL .................................................................................................... 221123-1 PART 2 - PRODUCTS .................................................................................................. 221123-2 PART 3 - EXECUTION ................................................................................................ 221123-4

SECTION 312000 - EARTHWORK ................................................................................. 312000-1 PART 1 - GENERAL .................................................................................................... 312000-1 PART 2 - PRODUCTS .................................................................................................. 312000-2 PART 3 - EXECUTION ................................................................................................ 312000-2

SECTION 329206 - SEEDING ......................................................................................... 329206-1 PART 1 - GENERAL .................................................................................................... 329206-1 PART 2 - PRODUCTS .................................................................................................. 329206-1 PART 3 - EXECUTION ................................................................................................ 329206-2

SECTION 329301 – DRY MULCH .................................................................................. 329301-1 PART 1 - GENERAL .................................................................................................... 329301-1 PART 2 - METHOD OF MEASUREMENT ................................................................ 329301-1 PART 3 - PRODUCTS .................................................................................................. 329301-1 PART 4 - EXECUTION ................................................................................................ 329301-1

SECTION 332100 – WELL ABANDONMENT .............................................................. 332100-1 PART 1 - GENERAL .................................................................................................... 332100-1

FOREST WIDE HAND PUMP REPAIR, FY20

PART 2 - PRODUCTS .................................................................................................. 332100-2 PART 3 - EXECUTION ................................................................................................ 332100-2

SECTION 332101 – WELL CASING ............................................................................... 332101-1 PART 1 - GENERAL .................................................................................................... 332101-1 PART 2 - PRODUCTS .................................................................................................. 332101-1 PART 3 - INSTALLATION .......................................................................................... 332101-2

SECTION 332102 – WELL TESTING ............................................................................. 332102-1 PART 1 - GENERAL .................................................................................................... 332102-1 PART 2 - EXECUTION ................................................................................................ 332102-1

MEASUREMENT AND PAYMENT 011250-1

SECTION 011250 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

DETERMINATION OF QUANTITIES

C. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. If in the judgment of the CO, the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

UNITS OF MEASUREMENT

D. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

2. Cubic Yard (CY): A measurement computed by one of the following methods:

MEASUREMENT AND PAYMENT 011250-2

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.

Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

3. Each (EA): One complete unit, which may consist of one or more parts.

4. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

5. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the CO and performed by the contractor.

6. Linear Foot (LF): Measurement of work along its length from point-to-point;

parallel to the base or foundation. Do not measure overlaps.

7. Lump Sum (LS): One complete unit.

8. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

9. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

10. Square Foot (SF): Measured on a plane parallel to the surface being measured.

11. Square Yard (SY): Measured on a plane parallel to the surface being measured.

12. Ton: Measured as a short ton consisting of 2,000 pounds.

METHOD OF MEASUREMENT

E. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

MEASUREMENT AND PAYMENT 011250-3

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION (NOT APPLICABLE)

END OF SECTION 011250

MAY 2006

MOBILIZATION SECTION 011900-1

SECTION 011900 - MOBILIZATION

PART 1 - GENERAL

SUMMARY

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

MEASUREMENT AND PAYMENT

B. The measurement shall be lump sum for mobilization. Payment shall be as follows:

C. Bond premiums will be reimbursed after receipt of the evidence of payment.

1. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

2. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

3. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

4. Progress payments for mobilization and preparatory work shall be subject to retainage.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 011900

July 2005

DEMOLITION SECTION 024101-1

SECTION 024101 - DEMOLITION

PART 1 - GENERAL

A. This Section includes general requirements for all demolition work shown on the drawings or included in other specifications. This includes the loading, handling, hauling, and placing of excess excavation material, unsuitable excavation material, clearing and grubbing debris, and construction debris.

B. Measurement and Payment- Work associated with replacing existing hand pumps and concrete pads will be included in Section 024101. Work associated with well abandonment will be included in Section 332100.

PART 2 - MATERIALS- Not Applicable

PART 3 - EXECUTION

A. Existing Items to Remain: Protect items to remain against damage and soiling during demolition.

B. General: Remove demolished materials from Project site and legally dispose of them off of Government property.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

C. Burning: Do not burn demolished materials.

CLEANING

D. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.

END OF SECTION 024101

FEBRUARY 2020

CAST-IN-PLACE CONCRETE 033000-1

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

SUMMARY

A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

SUBMITTALS

B. Product Data: For each type of product indicated.

C. Design Mixtures: For each concrete mixture. Indicate amounts of mixing water to be withheld for later addition at Project site.

D. Field quality-control test reports.

MEASUREMENT AND PAYMENT

E. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.

PART 2 - PRODUCTS

STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A-615/A 615M, Grade 60, deformed.

B. Plain-Steel Wire: ASTM A-82, as drawn.

C. Deformed-Steel Wire: ASTM A-496.

REINFORCEMENT ACCESSORIES

D. Joint Dowel Bars: ASTM A-615/A-615M, Grade 60, plain-steel bars, cut bars true to length with ends square and free of burrs.

E. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete.

CAST-IN-PLACE CONCRETE 033000-2

CONCRETE MATERIALS

F. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:

Portland Cement: ASTM C 150, Type II.

G. Normal-Weight Aggregates: ASTM C 33, graded, from a single source.

Maximum Coarse-Aggregate Size: 1 inch nominal.

Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

H. Water: ASTM C-94/C-94M and potable.

ADMIXTURES

I. Air-Entraining Admixture: ASTM C-260.

CURING MATERIALS

J. Absorptive Cover: AASHTO M-182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz/sq yd when dry.

K. Moisture-Retaining Cover: ASTM C-171, polyethylene film or white burlap-polyethylene sheet.

L. Water: Potable.

M. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C-309, Type 1, Class B, dissipating or non-dissipating.

CONCRETE MIXTURES, GENERAL

N. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.

O. Limit water-soluble, chloride-ion content in hardened concrete to 0.06 percent by weight of cement.

P. Admixtures: Use admixtures according to manufacturer's written instructions.

CONCRETE MIXTURE

Q. Proportion normal-weight concrete mixture as follows:

CAST-IN-PLACE CONCRETE 033000-3

Minimum Compressive Strength: 3750-psi at 28-days.

Minimum Cementitious Materials Content: 6.5-bags per cubic yard minimum Slump Limit: 3-inches, plus or minus 1-inch.

Air Content: 5-percent, plus or minus 1-percent at point of delivery.

CONCRETE MIXING

R. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C-94/C-94M and ASTM C-1116, and furnish batch ticket information.

When air temperature is between 85 and 90-deg F, reduce mixing and delivery time from 1-1/2-hours to 75-minutes; when air temperature is above 90-deg F, reduce mixing and delivery time to 60-minutes.

S. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C- 94/C-94M. Mix concrete materials in appropriate drum-type batch machine mixer.

For mixer capacity of 1-cu yd or smaller, continue mixing at least 1-1/2-minutes, but not more than 5-minutes after ingredients are in mixer, before any part of batch is released.

For mixer capacity larger than 1-cu yd, increase mixing time by 15-seconds for each additional 1-cu yd.

Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added.

PART 3 - EXECUTION

FORMWORK

A. Forms shall be clean inside, accurately set and properly secured. Forms shall be sufficiently tight and rigidly constructed to contain the concrete without leakage or distortion. Forms for concrete exposed as a finished surface shall have smooth faces with tight, flush joints. Forms shall be left in place until the concrete is safely self-supporting, and then shall be removed without damage to the concrete.

B. Chamfer or round exterior corners and edges of permanently exposed concrete.

EMBEDDED ITEMS

C. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.

STEEL REINFORCEMENT

CAST-IN-PLACE CONCRETE 033000-4

D. Reinforcing bars and members shall be accurately shaped and placed, as indicated on the drawings. Bars shall overlap a minimum of 24-diameters at all splices and be securely wired and shall be firmly held in place during the placing of concrete by spacers, chairs or other suitable supports. Extreme care shall be taken to embed steel in concrete not less than 1-1/2-inches from the finished concrete surface at any point.

E. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete.

CONCRETE PLACEMENT

F. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and has been inspected by the Contracting Officer or authorized representative.

G. Notify the CO a minimum of 24-hours prior to placing concrete.

H. Prepare a minimum of two 6-inch diameter x 12-inch long concrete test cylinders from each 5-cubic yards placed to determine if the minimum acceptable compressive strength is achieved. Perform compressive strength tests on all cylinders. Submit test results shall be to the CO.

I. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI-301.

J. Surfaces on which concrete is to be placed shall be thoroughly moistened with water immediately before placing concrete.

K. All standing water shall be removed prior to concrete placement.

L. All concrete shall be placed while fresh and before it has taken an initial set.

Retempering any partially hardened concrete with additional water will not be permitted.

M. After being deposited, concrete shall be consolidated (tamped and spaded or vibrated) until all voids are filled and free mortar appears on the surface. The concrete shall be placed as near as possible to its final position. Vibrators may not be used to transport concrete.

N. Consolidate concrete during placement operations so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

O. Maintain reinforcement in position on chairs during concrete placement.

P. Screed slab surfaces with a straightedge and strike off to correct elevations.

Slope surfaces uniformly to drains where required.

CAST-IN-PLACE CONCRETE 033000-5

Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleed water appears on the surface. Do not further disturb slab surfaces before starting finishing operations.

Q. Cold-Weather Placement: Comply with ACI-306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

When average high and low temperature is expected to fall below 40-deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI-301.

Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.

Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

R. Hot-Weather Placement: Comply with ACI-301 and as follows:

Maintain concrete temperature below 90-deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.

Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

S. Expansion Joints shall be placed as shown on the drawings. The joint space shall be 3/8-inch minimum and shall be filled with asphalt impregnated fiberboard.

T. Contraction, or Weakened Plane joints shall be placed to avoid random shrinkage cracking of the concrete. Penetrate at least 1/3 thickness of the concrete separating the coarse aggregate along the joint.

FINISHING

U. General: Comply with ACI-302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

V. Finish:

Consolidate surface by hand floating if area is small or inaccessible to power driven floats. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture.

Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with CO before application.

All edges shall be finished with an edging tool.

CAST-IN-PLACE CONCRETE 033000-6

CONCRETE PROTECTING AND CURING

W. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI-306.1 for cold-weather protection and ACI-301 for hot-weather protection during curing.

X. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching (0.2 lb/sq ft) / hr before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

Y. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces.

Z. Cure concrete according to ACI-308.1, by one or a combination of the following methods:

Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:

1. Water.

a. Continuous water-fog spray.

b. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers.

c. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape.

d. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application.

Maintain continuity of coating and repair damage during curing period.

CONCRETE SURFACE REPAIRS

AA. Defective Concrete: Repair and patch defective areas when approved by CO.

Remove and replace concrete that cannot be repaired and patched to CO's approval.

BB. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning.

CAST-IN-PLACE CONCRETE 033000-7

Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension in solid concrete, but not less than 1 inch in depth.

Make edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush-coat holes and voids with bonding agent. Fill and compact with patching mortar before bonding agent has dried. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.

Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement so that, when dry, patching mortar will match surrounding color. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface.

Repair defects on concealed formed surfaces that affect concrete's durability and structural performance as determined by CO.

CC. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and verify surface tolerances specified for each surface. Correct low and high areas. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template.

Repair finished surfaces containing defects. Surface defects include spalls, popouts, honeycombs, rock pockets, crazing and cracks in excess of 0.01-inch wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions.

After concrete has cured at least 14-days, correct high areas by grinding.

Correct localized low areas during or immediately after completing surface finishing operations by cutting out low areas and replacing with patching mortar. Finish repaired areas to blend into adjacent concrete.

Correct low areas scheduled to remain exposed with a repair topping. Cut out low areas to ensure a minimum repair topping depth of 1/4-inch to match adjacent floor elevations. Prepare, mix, and apply repair topping and primer according to manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.

Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and expose steel reinforcement with at least a 3/4-inch clearance all around.

Dampen concrete surfaces in contact with patching concrete and apply bonding agent.

Mix patching concrete of same materials and mixture as original concrete except without coarse aggregate. Place, compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete.

Repair random cracks and single holes 1 inch or less in diameter with patching mortar.

Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and loose particles. Dampen cleaned concrete surfaces and apply bonding agent. Place patching mortar before bonding agent has dried. Compact patching mortar and finish to match adjacent concrete. Keep patched area continuously moist for at least 72-hours.

CAST-IN-PLACE CONCRETE 033000-8

END OF SECTION 033000

July 2005

PAINTING 099100-1

SECTION 099100 - PAINTING

PART 1 - GENERAL

SCOPE

A. Perform all work necessary to supply and paint well casing extension.

PRODUCT HANDLING

B. All painting material shall be delivered to the site in the manufacturer's original containers with labels intact and seals unbroken.

ENVIRONMENTAL

C. Surfaces shall be painted only when they are free from moisture. No painting shall be done when temperature is below 50 degrees F., except when specifically permitted in writing by the CO.

MEASUREMENT AND PAYMENT

D. Payment for this work will be included in Item 332101.

PART 2 - PRODUCTS

MATERIALS

A. Material shall all be first quality products. The Benjamin Moore & Co. products listed are given to establish the type and quality of products to be used. Other products of equivalent quality may be submitted to the CO for review and approval. Top line products of Pratt & Lambert, Sherwin-Williams, Fuller-O'Brien, Olympic, and Pittsburgh paints and stains are equivalent to those listed in this specification.

1. Ferrous Metal: Soft gloss, alkyd modified, acrylic house paint; MoorGlo Latex House and Trim Paint, #096 (max. spread rate - 500 sq. ft./gallon. Prime with alkyd base primer formulated to protect against rust and corrosion; Retardo Rust Inhibitive Paint, #163 (max. spread rate - 600 sq. ft./gallon.

2. Prime coats and finish coats of any one paint system shall be the products of the same manufacturer, except for manufacturer-applied factory or shop primed surfaces.

PART 3 - EXECUTION

PAINTING 099100-2

PREPARATION OF SURFACES

A. Surfaces to be painted shall be clean and free of dirt, dust and any other substance which might interfere with the functioning of the painting system. All surfaces to be painted shall be in proper condition to accept, and assure the proper adhesion and functioning of the particular painting system or coating specified.

B. All steel and ferrous metal surfaces to be painted will be primed before installation.

Bolts, welds and places where prime coat has been damaged shall be wire brushed to remove all loose paint, rust, and scale. Then apply one coat of ferrous metal primer.

WORKMANSHIP AND APPLICATION

C. Paint shall be applied in accordance with the applicable specification and/or manufacturer's instructions.

D. Paints and finishing materials shall be free from skins, lumps, or any foreign matter, and kept well stirred while being applied.

E. Work shall be protected against spatters, stains, or soiling, and each type of finish shall be protected against similar defacement by other finish and shall be left clean.

F. Each coat of paint shall be evenly worked out and allowed to dry before any subsequent coat is applied or rubbing done.

G. Finish coats shall be the exact shades and textures selected.

H. The finish work shall be free from runs and sags, defective brushing, and clogging of lines or angles.

COLOR SCHEDULE

Well Casing shall be painted dark green to match hand pump.

TOUCHING UP

I. At the completion of other branches of the work, all painted and finished work shall be touched up and restored where damaged or defaced, and the entire work left free from blemished.

END OF SECTION 099100

HAND PUMP REPAIR 221123-1

SECTION 221123 – HAND PUMP REPAIR

PART 1 - GENERAL

SUMMARY

A. This Section includes the following:

Hand pump.

Pump stand.

Suction pipe.

Lift Pipe.

Pump rod.

Pump cylinder.

Crushed aggregate road base.

Concrete pad and gutter.

Gravel sump Well Testing

B. Related Sections include the following:

Section 024101 “Demolition Section 033000 “Cast-in-Place Concrete.”

Section 312000 “Earthwork.”

Section 332101 “Well Casing” Section 332102 “Well Testing”

DEFINITIONS

C. PVC: Polyvinyl chloride plastic.

D. GSP: Galvanized steel pipe.

SUBMITTALS

E. Product Data: For the following:

Pipe and fittings/ connectors.

Pump stand.

Pump cylinder.

Disinfection chemicals

F. Certification that washed rock meets gradation requirements of this section.

G. Maintenance Data: To include in maintenance manuals, and Well Data L

HAND PUMP REPAIR 221123-2

QUALITY ASSURANCE

H. All work is to be done according to applicable Federal, State, and Local codes. All products which are, or may become, in contact with water: AWWA or NSF certified for potable water.

MEASUREMENT AND PAYMENT

I. Payment will be for Each Hand Pump repaired or replaced and will include removing and resetting: the pump seals; suction pipe; lift pipe; pump rod; and, pump cylinder, and all other equipment, material, work and incidentals necessary to complete the item.

J. Payments will be as listed for the following items:

Hand Pump Repair: Payment for Each hand pump pulled, maintained or replaced, and reinstalled. To include cylinder repair components and reinstallation of all other necessary components and connectors.

Suction Pipe: Linear Feet of suction pipe required for repairs, as authorized by the CO, furnished and installed to the nearest 0.5 foot, including pipe connectors.

Lift Pipe: Linear Feet of lift pipe required for repairs, as authorized by the CO, furnished and installed to the nearest 0.5 foot, including pipe connectors.

Pump Rod: Linear Feet of pump rod required for repairs, as authorized by the CO, furnished and installed to the nearest 0.5 foot, including rod connectors and accessories.

Concrete Pad: Payment for each concrete pad required to be replaced, as authorized by the CO, including: gutter; sump; and, crushed aggregate.

DELIVERY, STORAGE, AND HANDLING

K. Products shall be kept free from damage during delivery, storage, and handling.

Protect from dirt and moisture during storage.

PART 2 - PRODUCTS

HAND PUMP

A. Pump Stand

Description: Drinking fountain pump with built in reservoir, release valve and shroud.

Capacity and Characteristics

a. Model: Monitor 1DFHFS, as manufactured by Baker Manufacturing Company or an approved equal.

B. Pump Cylinder

HAND PUMP REPAIR 221123-3

Description: Brass, 1-1/4-inch NPT.

Capacity and Characteristics

1. Dimensions: 10-inch maximum stroke, 3.5-inch O.D., 3-inch I.D.

a. Model: Monitor #00005 as manufactured by Baker Manufacturing Company or an approved equal.

C. Suction and Lift Pipe

PVC: 1 ¼” NPS, ASTM D-1785, Schedule 80; threaded joints.

1. Labeled with NSF International logo, “NSF-PW.”

a. Pre-threaded 21-foot lengths.

b. Fittings: Threaded, ASTM D-2464.

D. Pump Rod

Rod Body Characteristics

1. Pultruded, using only Type E fiberglass roving’s.

a. 21-foot rod lengths.

b. Average Modulus of Elasticity: 6.7 x 10^6 psi.

c. Density: 0.074 lbs/in^3.

Model: 5/8” AquaLite Sucker Pump Rod (without guides) and accessories as manufactured by American West Windmill Company or an approved equal.

E. Coupling Kits: 5/8” AquaLite male coupling kit.

F. Sinker Bar: 1-3/16” diameter, 5/8” male x 5/8” female couplings, 31” long, 10 pounds.

SITE PREPARATION AND CRUSHED AGGREGATE

G. Site preparation shall conform to the requirements of Section 312000 “Earthwork.”

H. Crushed aggregate shall be obtained from an approved commercial source. Crushed aggregate shall be ¾” minus crushed stone or gravel.

CONCRETE AND REINFORCEMENT

I. Concrete and reinforcing steel shall conform to the requirements of Section 033000 “Cast-in-Place Concrete.”

GRAVEL SUMP

HAND PUMP REPAIR 221123-4

J. Washed Rock: 3/4-inch to 1-inch washed and screened material containing no lumps of soil or organic material.

PART 3 - EXECUTION

INSTALLATION

A. Installation of Concrete Pad – Site preparation and grading for concrete pads shall be done according to Section 312000. Concrete pad construction shall be in accordance with Section 033000.

B. Install hand pump and all related components according to the manufacturer’s recommendations and requirements.

C. Pump cylinder, pipe and pump rod shall be assembled and lowered into the well casing to the original set depth or as determined by the CO. The suction pipe assembly shall be fixed in the well casing in such a manner to prevent it from falling further into the well when not attached to the pump stand, but will allow the pipe assembly to be withdrawn for servicing of the pump cylinder.

D. Install pump stand by connecting the suction/lift pipe assembly and bolting the pump stand to the casing. Ensure that suction pipe and casing flange connections are watertight. After bolting the pump stand to the casing, run a bead of high stretch urethane acrylic caulk, ASTM-C920 Type S, Grade NS, Class 25, between the base of the pump stand and the well casing.

E. Drill a 1/16-inch weep-hole in the lift pipe so that it is located about 8 feet below the ground surface.

CLEANING

F. All chemicals used to disinfect the well shall meet ANSI/NSF 60.

G. Prior to assembly and installation of the suction pipe assembly, clean the cylinder, pipe and rod of all foreign substance and then disinfect the components with a 200-ppm chlorine solution.

H. Upon completion of the hand pump installation, disinfect well according to AWWA- A100 and AWWA-C654.

Disinfect well with a solution equal to 100-ppm free chlorine, after mixing with the water in the well.

Introduction of Chlorine Solution to the Well: The method of introducing the chlorine into the well shall be one of the following as recommended by AWWA-C654 and approved by the CO:

HAND PUMP REPAIR 221123-5

1. Calcium Hypochlorite: Dribble tablets of approximately 5-gram size down the casing vent and wait at least 30 minutes for the tablets to fall through the water and dissolve.

2. Sodium Hypochlorite: Suspend a tube through the well casing vent so that it reaches the bottom of the well. Withdraw the tube as the sodium hypochlorite solution is pumped through the tube.

The water in the well must be agitated to mix the solution thoroughly. Surfaces of all components above the water level must be flushed or washed down with the sterilizing solution.

The chlorine solution shall remain undisturbed in the well for a period of a least 12 hours, but not more than 24 hours.

Removing Disinfection Solution from the Well: After disinfection, the well shall be pumped for a minimum of 15 minutes beyond the time that a zero chlorine residual is first detected by the Contractor.

The chlorinated water shall be “quenched” of free chlorine by the use of sodium thiosulfate, food grade vitamin C, or other approved method prior to discharge, to bring the free chlorine level in the discharge stream to less than 0.5-ppm.

Have onsite at all times during the disinfection, a Colorimeter, capable of testing to 200-ppm of dissolved chlorine, and 0-10-ppm free chlorine. Provide CO opportunity to observe testing of the chlorine levels.

END OF SECTION 221123

JANUARY 2020

EARTHWORK 312000-1

SECTION 312000 - EARTHWORK

PART 1 - GENERAL

SUMMARY

A. This Section includes the following:

Preparing subgrades for concrete pads.

DEFINITIONS

B. Backfill: Soil materials used to fill an excavation.

C. Borrow or Select Borrow: Satisfactory soil material used for embankment, backfill, or fill construction that is either imported from off-site or excavated from designated locations at the site.

D. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by CO. Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction of the CO. Unauthorized excavation, as well as remedial work directed by CO, shall be without additional compensation.

Unclassified Excavation: Excavation to subgrade elevation and to lines and dimensions indicated regardless of the character of surface and subsurface conditions encountered, including rock, soil materials, and obstructions.

E. Fill: Soil materials used to raise existing grades.

F. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

G. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below subbase, aggregate base, drainage fill, initial or subsequent backfill, or topsoil materials.

H. Utilities include on-site underground pipes, conduits, ducts, and cables, as well as underground services within building.

MEASUREMENT AND PAYMENT

EARTHWORK 312000-2

I. There will be no separate measurement or payment for work in this Section. Payment will be included in the contract unit price as shown on the Schedule of Items.

PART 2 - PRODUCTS

BACKFILL MATERIALS, GENERAL

A. Excavated material may be processed and used for backfill if the material can be demonstrated to comply with that specified to the satisfaction of the CO. If excavated material is not sufficient to meet requirements, import needed material.

B. Backfill and Fill: Satisfactory soil materials.

Remove rocks over 8 inches in maximum dimension, ice or frozen earth, muck, debris, and earth with high void content.

Remove rocks over 4 inches in maximum dimension for backfill placed within 12 inches of foundation.

PART 3 - EXECUTION

LOCATION, ALIGNMENT AND GRADE

A. The location of all structures shall be staked out and grades established for approval by the CO before excavation is started.

PREPARATION

B. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout and other hazards created by earthwork operations.

C. Protect subgrades and foundation soils against freezing temperatures or frost. Provide protective insulating materials as necessary.

D. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

DEWATERING

E. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

EARTHWORK 312000-3

F. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.

Install a dewatering system to keep subgrades dry and convey ground water away from excavations. Maintain until dewatering is no longer required.

EXCAVATION

G. Excavate to indicated elevations and dimensions. Extend excavations a sufficient distance from structures for placing and removing concrete formwork.

H. All surfaces shall be restored to the required grade (usually original ground line), mounded over or smoothed off as directed, and left in a uniform and neat condition, to the satisfaction of the CO. Uniformly grade areas to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.

END OF SECTION 312000

SEEDING 329206-1

SECTION 329206 - SEEDING

PART 1 - GENERAL

1.1 SUMMARY

A. This item shall consist of broadcast seeding designated areas using specified seed mixtures with fertilizer, and raking the seed into the soil.

B. The areas to be seeded shall be areas disturbed by the work.

1.2 METHOD OF MEASUREMENT

A. There will be no separate measurement or payment for work in this Section. Payment will be included in the contract unit price as shown on the Schedule of Items.

1.3 REFERENCE SPECIFICATIONS - The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

A. Federal Specifications JJJ-S-181

PART 2 - PRODUCTS

1.4 SEED

A. The seed mix shall be as follows:

Grass Species Common Name Recommended Lbs./Acre Bromus marginatus Mountain Brome 6 Elymus elymoides Bottlebrush Squirreltail 4 Poa secunda ssp. sandbergii Sandberg’s Bluegrass 1 Koeleria macrantha Prairie Junegrass 1 Totals 12

1. All seed shall conform to the requirements of Federal Specifications JJJ-S-181;

State Laws; and U.S. Department of Agriculture Rules and Regulations under the Federal Seed Act; in effect on the date of invitation of bids. Seed which has become wet, moldy or otherwise damaged in transit or storage will not be accepted.

2. Seed shall be furnished separately or in mixture in standard containers clearly marked or labeled with (1) Seed name, (2) Lot number, (3) Net weight, (4) Percentage of purity and of germination and hard seed, (5) Percentage of weed seed content, and (6) all seed shall be certified as noxious weed-free seed.

3. Furnish duplicate signed copies of a statement by the vendor certifying that each lot of seed has been tested by a recognized laboratory for seed testing within 6 months of date of delivery.

a. This statement shall include: (1) Name and address of laboratory, (2) Date of test, (3) Lot number of each kind of seed, and (4) Results of tests as to name percentages of purity and of germination, and percentage of weed content, for each kind of seed furnished, and in case of a mixture, the proportions of each kind of seed.

B. FERTILIZER

1. The fertilizer shall be 16% total nitrogen, 16% available phosphoric acid, and

16% total water soluble potash applied at the rate of 400 pounds per acre.

SEEDING 329206-2

2. Fertilizer shall be dry, free-flowing type suitable for application with broadcast seeding. It shall be a standard commercial fertilizer supplied separately or in mixtures in standard containers with name, weight, and guaranteed analysis of contents clearly marked.

3. Fertilizer which has become wet or otherwise damaged in transit or storage will not be accepted.

PART 3 - EXECUTION

3.1 GENERAL

A. The specified seed mixture, with fertilizer, shall be uniformly spread on the designated areas to the density in pounds of live seed per acre as specified.

B. Each area or suitable section of the area to be seeded shall be seeded as soon as the grading and finishing work have been completed and the area prepared and approved for seeding.

C. Seeding shall follow the finishing work as closely as feasible and if possible before the ground has become packed or hardened.

D. No regard shall be given to the season of the year except that no seeding shall be done during windy weather or when the ground is excessively wet or deeply frozen.

3.2 PREPARATION OF SEEDING AREA

A. Cut slopes, fill slopes, embankments or other areas to be seeded shall be shaped and finished as specified under the Sections involved.

B. The area shall then be hand raked or otherwise worked such that the surface is loose to a depth of at least one inch.

C. Each area shall be approved for seeding by the Contracting Officer before seed is applied.

3.3 SEEDING

A. The seed or seed mixtures, with or without fertilizer, shall be accurately proportioned as stipulated and thoroughly mixed. They shall be remixed as necessary so that a uniform mixture will result as each loading of the seeder is made.

B. Seed, with fertilizer, shall be applied with a rotary hand seeder, other approved type commercial seeder, or other method, as approved by the CO. All portions of the area shall be uniformly covered to the required density.

C. Immediately after seeding the contractor shall rake in the seed such that the seed becomes integrated with the soil.

3.4 MAINTENANCE OF SEEDED AREA

A. The Contractor will not be required to maintain an area which has been satisfactorily seeded except that he shall protect the area against traffic by warning signs or barricades or other methods approved by the Contracting Officer.

B. When a seeded area has become damaged by storm or otherwise prior to final acceptance of the project, the Contracting Officer may order the area reworked. The damage shall then be repaired as directed and the area reseeded.

END OF SECTION 329206

February 2020

DRY MULCH 329301-1

SECTION 329301 – DRY MULCH

PART 1 - GENERAL

1.1 This work consists of furnishing and placing dry applied mulch on designated seeded areas.

PART 2 - METHOD OF MEASUREMENT

2.1 There will be no separate measurement or payment for work in this Section. Payment will be included in the contract unit price as shown on the Schedule of Items.

PART 3 - PRODUCTS

3.1 MULCH

A. Consist of thermally processed virgin wood fiber, and natural wood cellulose fiber.

Mulch shall be produced from clean, whole wood chips and have property of dispersing readily in water.

B. The material shall contain no weed seed and shall be heat processed to eliminate factors that inhibit growth and germination.

C. Have integrated tackifiers, and wetting agents.

D. Manufacturer recommended for application by:

1. Hydromulch

2. Machine spreading

3. Hand spreading

E. Mulch shall be SeedAide - CoverGrow as manufactured by Profile Products, 750 W.

Lake Cook Road, Suite 440, Buffalo Grove, IL 60089, (profileproducts.com), or an approved equal.

F. The application rate shall be at the manufacturers recommended rate for the slopes to which applied.

PART 4 - EXECUTION

4.1 WEATHER AND SOIL CONDITIONS - Seeding materials shall not be…