Specifications.pdf
PDF 182 KB Posted
- Attached to
- PIRO - TRAIL AND STAIR SUPPLIES
- Solicitation number
- 140P6423Q0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_AnswersPIRO_0001.pdf | ||
| Sol_140P6423Q0019_Amd_0001.pdf | ||
| Sol_140P6423Q0019.pdf | ||
| Price_Schedule.pdf | ||
| Price_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pictured Rocks National Lakeshore
Munising, MI 49862
Specifications for Construction Materials (Trail and Stair Supplies)
NATIONAL PARK SERVICE
MIDWEST REGION
OHIO MAJOR ACQUISITION BUYING OFFICE
• Material to be supplied: Provide material according to Supply List below to be
Brand name or “or equal” requirement, must meet or exceed, based on the following specifications:
Item Project Name Quanity unit
Chapel Parking to Chapel Beach - Seeds Project
1 Dimensional Lumber (2"x12"x12' actuall size) rough cut, green treat 418 board
2 green treat lumber 4"x6"x12' 75 board
3 green treat lumber 2"x8"x16' 4 board
4 Rebar 1/2" x 20' 165 stick
5 4.5" 30d hot dipped galvanized nails 2 50 lb
6 screws 3 1/2 inch coated deck screws t-25 drive 5 box of
Project Name
Miners Castle to Sand Point Junction - Seeds Project
Dimensional Lumber (2"x12"x12' actuall size) rough cut, green treat 230 board
8 green treat lumber 4"x6"x12' 57 board
9 Rebar 1/2" x 20' 90 stick
10 4.5" 30d hot dipped galvanized nails 1 50 lb box
11 screws 3 1/2 inch coated deck screws t-25 drive 5 box of
Project Name
CUA Trail and Stair Structure Project
CUA Parking Lot and Trail
12 6x6x16' green treat lumber 80 boards
13 cedar split rail fencing strait posts two rail 130 post
14 cedar split rail fenching horizontal rail 10' in length 260 rail
15 cedar split rail fencing corner posts 9 posts
16 cedar split rail fencingend end posts 6 post
17 1/4 to 3/8 limestone aggreagate with fines 160 cubic yards
CUA Stair Structure
18 Simpson Strong Tie H1 18 GA Seismic and Hurricane Tie with ZMAX Coating or equal 25 brackets
19 Simpson Strong Tie H1A-2 18GA Seismic and Hurricane Tie with ZMAX Coating or equal 15 brackets
Simpson Strong Tie Seismic and Hurricane Tie EPCS 18GA End Post Bracket for 6x6 construction with ZMAX Coating or equal 10 brackets
Simpson Strong Tie Seismic and Hurricane Tie PCS 18GA Post cap Bracket for 6x6 construction with ZMAX Coating or equal 8 brackets
22 Simpson Strong Tie E-Z black powder coated post base wood to concrete for 4x6 wood posts or equal 10 brackets
Fs Industries safety-grip stair treads osha and boca type Metal stair treads 7"x1 1/2" x 13GA galvanized x 4' long with end plates Shur Grip -Safety Grip brand or equal 150 treads
24 2x8x14' green treat lumber 10 boards
25 2x4x16' green treat lumber 15 boards
26 2x12x14' green treat lumber 40 boards
27 4x6x10' green treat lumber 15 boards
28 4x6x20' green treat lumber 6 boards
29 6x6x8'' green treat lumber 8 boards
30 1/2" X 8" galvanized carraige bolts 30 bolts
31 Galvanized washers for 1/2" galvanized carraige bolts 80 washers
32 Galvanized nuts to fit 1/2" galvanized carraige bolts 40 nuts
33 Galvanized locking washers to fit 1/2" galvanized carraige bolts 2 box of 25
34 sono tubes 12" diameter X 4' length. 12 tubes
35 RSS with ziptip and ceethread #10x5" structural screws or equal 6 box of
36 screws 3 1/2 inch coated deck screws t-25 drive 5 box of
37 60lb bag of sackreet concrete or equal 100 bags woven mesh metal panels 36"x8' 3/8″ thick steel (zinc primed and powder coated matte black) -tahoe Hog Railing
PanelsHogwild railing or equivlant 12 panels
Mcmaster-Carr vibration dampining loop clamp (galvanized steel, vinyl plastic cushioned 1/4" ID, 1-1/4" long part number 8863T12 or equal 16 pack of
• The location of the material to be delivered:
a. Deliver to: E9758 County Road H-58, Munising MI 49862
• The delivery schedule:
a. Delivery: 90 Days after Contract Award
• Any applicable performance standards:
a. Delivery will be FOB Destination.
b. Delivery must be compliant with MNDOT standards.
c. Vendor must contact park with delivery schedule 1 (one) week prior to delivery.
d. Award to be made as ONE LOT of material.
e. If quoting "or equal;" item, must submit detailed product specification documents to ensure items are comparable.
File details come from the government source that posted it. Updated .