Specifications.pdf
PDF 512 KB Posted
- Attached to
- Structural Wall Repair, Main Laboratory, Cold Regions Research and Engineering Laboratory, Hanover, NH
- Solicitation number
- W912WJ20Q0098
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ20Q0098-0003.pdf | ||
| Amendment W912WJ20Q0098-0002.pdf | ||
| Amendment W912WJ20Q0098-0001.pdf | ||
| Solicitation W912WJ20Q0098.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number:
W912WJ20Q0098
CMU Wall Removal MTS Lab
Cold Regions Research and Engineering Laboratory (CRREL) Hanover, New Hampshire
Construction Solicitation and Specifications
June 16, 2020
16 June 2020
CMU WALL REMOVAL
MTS Lab
Cold Regions Research and Engineering Laboratory (CRREL) Hanover, New Hampshire
STATEMENT OF WORK
Solicitation Number: W912WJ20Q0098 June 16, 2020
A. General Description of the Work to be Performed
The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under the project documents.
1. Location and Background of Project: This project is at the Cold Regions Research and Engineering Facility (CRREL) in Hanover, NH, which is approximately 65 miles northwest of Concord, New Hampshire and is accessible from Exit 13 off Interstate 91 (I-91). The work to be performed is at the Main Laboratory Building at CRREL. This building is conjoined with the Laboratory Addition Building. While the two buildings primarily function as one facility, the structures are two separate entities.
A wall in the basement level, Room 58, of the two structures is constructed of original unfilled concrete masonry units (CMU) on the Main Lab side and drywall with aluminum studs on the Lab Addition side.
CRREL had awarded and administered an asbestos removal contract, which included the demolition of a portion of the aforementioned wall in the basement of the Main Lab/Lab Addition. During the course of demolition in August 2019, it was revealed that there exists a brick veneer on the west side of the CMU wall face. This brick veneer rests on the edge of the CMU wall, approximately one foot from the bottom of the first floor concrete beam. The existing brick veneer runs from the supporting CMUs to the roof of the Main Lab Building. Several wood studs were inserted in the gap between the CMUs and the brick veneer for temporary support. Demolition work was halted at that point and the asbestos removal work was not performed.
2. Description of Work. The work of this project involves the temporary stabilization of the wall to permit safe removal of asbestos containing materials, the removal of the asbestos containing materials, the removal of the suspended portion of brick veneer below the concrete beam and existing CMU wall, and installation of a new shoring system along the wall opening to support the remaining brick veneer above.
The shoring system includes providing and installing two structural steel beams with four supporting posts.
The Contractor shall note that space to perform the work is limited, as there is existing equipment located in close proximity to the wall. The work requires the relocation of one 4-inch abandoned electrical conduit.
Patching of existing CMU walls and existing columns is required. Finishes to final surfaces of installed materials, e.g. paint, gypsum board, or other, is not required.
Asbestos to be removed is found in two separate building features, both of which include asbestos-containing vermiculite material. Filler material in all blocks of the CMU wall is composed of asbestos-containing vermiculite, and plaster applied to three columns has asbestos-containing vermiculite as one of its components. All of this asbestos-containing material shall be removed. The CMU Wall is approximately 13 feet by 28 feet and is composed of 506 individual concrete masonry units. The three columns are each 9-inches by 14-inches and 169-inches high, with a 2-inch thick coating of the asbestos-containing plaster applied to the full dimensions and height.
The Contractor shall note that temporary stabilization of the existing wall and complete removal of all of the asbestos containing material, from the wall and from the three columns, is required prior to performing the permanent shoring and wall work.
The Contractor shall also note that only the rooms immediately surrounding the project work area will be unoccupied (the two rooms on either side of the wall to be repaired) during the performance period of this contract. The remainder of the Main Laboratory Building and the Laboratory Addition Building will be occupied by CRREL pesonnel.
B. General Project Requirements
1. Work Site. The site of the work is on a US Army Corps of Engineers Laboratory Facility, in Hanover, New Hampshire. All rules and regulations of the Facility covering general safety, security, site access, sanitary requirements, pollution control and traffic regulations shall be observed by the Contractor. Information regarding these requirements is outlined below and may be obtained by contacting the Contracting Officer, who will provide such information or assist in obtaining same from appropriate authorities.
2. Security. The Contractor shall report any vandalism, suspicious activities or devices to the Contracting Officer or local police as soon as possible. The Contracting Officer's Representative will notify the Contractor of any heightened security measures and will expect vigilant monitoring of equipment, grounds and security fencing while working. At a heightened security posture, there may be work areas that are restricted or work may come to a complete stop. The Contracting Officer will notify the Contractor of these restricted areas, and work may be delayed or restricted or will be performed in these areas under the direct supervision of U.S. Army Corps of Engineers personnel. The Contractor may return to the site only with the written approval of the Contracting Officer.
At the close of each work day, Government facilities, equipment, and materials shall be secured. The Contractor shall be responsible for maintaining a secure construction site and ensure the area of the scope of this contract is secure at all times during and after work hours.
All project work and conduct of construction activity shall comply with security requirements, regulations, and policies as directed by CRREL's security office. A copy of the security regulations may be obtained from the security office.
All employees of the Contractor and its subcontractors will be restricted from unauthorized access onto CRREL grounds without appropriate identification; refer below to Paragraph "Entry Control".
All personnel, vehicles, and construction equipment entering or exiting CRREL grounds may be subjected to a search.
No alcoholic beverages or drugs are allowed on CRREL grounds. If found in violation the violator shall be requested to leave the premises immediately. Failure to do so will involve security personnel escorting the violator off CRREL grounds.
3. Entry Control: CRREL is a closed facility that requires an identification badge and valid photo ID to enter the facility; refer to the requirements under paragraph titled "Identification Badges." The designated location of entry shall be through the main gate which is manned by armed security personnel. It is a violation of Federal statute to enter the facility at any point other than the designated location without authorization. The authority to issue search, seizure and apprehension authorizations for persons', places, and vehicles on the facility has been delegated to the Department of Defense (DoD) police. Same day announcement of visitors will not be accepted. Failure to obtain entry approval will not affect the contract price or time of completion.
4. Identification Badges:
a. Identification badges will be issued without charge to the Contractor on the following conditions:
(1) Contractor verifies and certifies that each employee of the Contractor and subcontractor are citizens of the United States. Work under this contract is restricted to citizens of the United States;
(2) Each employee has a State or Federal issued photo identification card; and
(3) The CRREL security office has the ability to make picture ID badges for non-Government personnel who will be working on the installation for extended periods of time. Letters or emails requesting identification badges for each employee as required below includes the project name, contract number, the Contractor's (or subcontractor's) name, address, and telephone number, and the employee's full name, address, telephone number, social security number, and position.
b. Badges shall be as directed by CRREL, and shall be worn and be visible at all times while on CRREL grounds. Immediately report instances of lost or stolen badges to the Contracting Officer's Representative.
c. At the end of each work day, all issued identification badges shall be returned to CRREL's main gate guard house. At the start of each work day, each employee of the Contractor and subcontractor shall be responsible for checking in at the main gate guard house to pick up their turned in identification badge.
Individuals who fail to follow these procedures shall be banned from CRREL for the duration of the project. Final payment will not be made until all identification badges have been returned and accounted for.
5. Letter of Designated Representatives: At least 10 working days prior to the commencement of work and the Contractor arriving at CRREL, the Contractor shall provide the Contracting Officer's Representative with a letter containing the names of two designated representatives of the Contractor authorized to request identification badges initially and for requests during the performance period of the contract. The letter shall include the project name, contract number, the Contractor's name, address, and telephone number, and the designated representative's full name, address, telephone number, social security number, and position.
6. Initial Request Letter for Identification Badges: At least 72 hours prior to the commencement of work and the Contractor arriving at CRREL, the Contractor's designated representative shall provide the Contracting Officer's Representative with an initial request for identification badges for all employees of the Contractor and subcontractors who will initially start work at CRREL. The letter shall include information as required above under Paragraph 4, B, a, (3) above.
7. On-Going Requests for Identification Badges: Employees of the Contractor or subcontractor who will start work for the first time after the initial request letter for identification badges has been submitted shall comply with the following: At least 3 working days prior to the employee arriving at CRREL, the Contractor's designated representative shall provide the Contracting Officer's Representative with a request for an identification badge. The request shall be in the form of an e-mail.
The email shall include information as required above.
8. Sign-in Log: In addition to wearing identification badges, employees of the Contractor and subcontractors may be required to sign-in each time they enter and exit CRREL grounds.
9. Designated Construction Entrance for Deliveries: Deliveries shall only enter through the main gate unless another location is approved by the Contracting Officer's Representative and the security office.
Restrict all activities and movement of personnel, materials, construction equipment, and supplies to designated entrance and haul routes. The Contractor shall coordinate all delivery personnel in accordance with subparagraph titled "Entry Control" to request deliveries through the security gates.
The Contractor shall be responsible for receiving all deliveries in person. No deliveries will be accepted by Government personnel on behalf of the Contractor.
10. Cameras and Photographs: Cameras shall not be allowed on CRREL grounds nor shall any photographs be taken without written permission of the Contracting Officer's Representative.
11. Antiterrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the Contracting Officer's Representative within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https:// atlevel1.dtic.mil/at.
12. iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the USACE iWATCH program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Contracting Officer's Representative. This training shall be completed within 45 calendar days of contract award and within 45 days of new employees commencing performance on the contract. The Contractor shall provide certification of completion to the Contracting Officer's Representative within 10 days of training completion. Training documents will be provided by the Security Office.
13. Operations Security (OPSEC) Training: All new Contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all Contractor employees must complete annual OPSEC awareness training. The Contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the Contracting Officer's Representative within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/ operations-security.html.
14. Personnel Security Screening: The Contractor shall conduct a security screening on every employee prior to their performance under this contract. The security screening shall cover the most recent five (5) years or since age 18, whichever is shorter, providing it includes the most recent two (2) years of the applicant's life. The security screening shall include, as a minimum, checks with former employers, former supervisors and personal references, along with a local record check with police departments. The Contractor shall furnish the Contracting Officer's Representative with a record of the results of each employee's security screening prior to entry on duty.
15. Identification of Equipment and Tools. Affix to Contractor or Subcontractor owned machinery, motor vehicles, equipment, and tools, clearly legible identification showing the Contractor's or Subcontractor's name, and where space permits, address and telephone number, so as to distinguish them from Government-owned items, and can be returned to the rightful owner if inadvertently left on Government property.
16. Contractor’s Responsibility. The Contractor shall furnish all plant, labor, equipment and materials and carry out all operations as necessary to accomplish the work of this project as described in this document and on the contract drawings.
17. Commencement, Prosecution and Completion of Work. The Contractor shall commence work under this contract within 15 days after the date of receipt of the Notice to Proceed, shall prosecute the work diligently, employing ample personnel and sufficient equipment, and shall complete the entire work ready for use not later than 180 days after the date of receipt of the Notice to Proceed. The time included for completion shall include final cleanup of the project site. Additional restrictions concerning the prosecution and completion of work are as follows:
a. The Contractor shall attend a Preconstruction Conference prior to the start of on-site construction work (see paragraph entitled "Preconstruction Conference", below).
b. The on-site work is restricted to 0700 (7:00 AM) to 1530 (3:30 PM).
18. Superintendence by the Contractor. At all times during the performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent project superintendent who is satisfactory to the Contracting Officer's Representative and has the authority to act for the Contractor.
The qualified superintendent, and competent alternate, shall be capable of reading, writing, and conversing fluently in the English language.
The project superintendent must have a minimum of five years of experience in construction with at least two of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer's Representative may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend quality control meetings.
The project superintendent shall maintain a physical presence at the site at all times and be responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer's Representative. Failure to comply with these requirements shall be deemed as cause for a non-compensatory stoppage and suspension of work until the deficiency is remedied.
The Project Superintendent is subject to removal by the Contracting Officer's Representative for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
19. Licensed Contractor. The Contractor shall be licensed as a General Contractor. All subcontractor's performing work shall be licensed for their respective discipline.
20. Contractor Personnel Conduct. The Contractor personnel's conduct shall not reflect discredit upon the Government. Contractor shall ensure that personnel present a professional appearance. Contractor's employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The Contractor shall ensure no Contractor employees conduct political related activities or events on Government Property.
21. Traffic Regulation and Control. During construction the Contractor shall provide access as necessary to maintain traffic and to provide vehicle access to all structures in the project area. The Contractor shall maintain and protect traffic on all affected roads during the construction period, except as otherwise specifically directed by the Contracting Officer's Representative. The traveling public shall be protected from damage to person and property. The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic. The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads.
The Contractor shall be responsible for the repair of any damage to roads caused by construction operations.
The Contractor is responsible for coordination between CRREL traffic and construction vehicle movement, as well as deliveries through CRREL grounds. The Contractor is responsible for ensuring at least one lane of traffic is passable by vehicle through any roads on the CRREL campus affected by project work to ensure regular traffic and emergency vehicle access to laboratory facilities and the Child
Development Center. Temporary closure of roads or access should be requested trough the Contracting Officer's Representative at least 7 calendar days in advance. All efforts shall be made to conduct temporary closures on the weekends or after regular laboratory working hours which are between 6am and 5pm.
22. Access to the Project Site. Access to the project site is currently available for construction. The Contractor shall be responsible for providing and maintaining access necessary for his equipment and plant to and from the work site.
23. Construction Site Plan. Prior to the start of work, the Contractor shall submit a site plan showing the locations and dimensions of temporary facilities including layouts and details, equipment and material storage areas, access and haul routes, avenues of ingress/egress to fenced areas (e.g., the assigned storage and staging area), details of the fence installation (if used), and the number of trailers to be used. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas. The plan shall also show where temporary utility hook-ups are to be located, if required, and how grounding of equipment and trailers will be achieved, as appropriate. A storage and staging area will be available to the Contractor on the CRREL facility property and will be discussed at the Preconstruction Conference. Any items removed from the property shall be recycled to the furthest extent possible.
24. Hours of Operation. On site work hours are as stated in Part B.17.b, above. The Contractor will not be permitted to perform on-site work on Saturdays, Sundays, or legal holidays, unless otherwise authorized by the Contracting Officer's Representative. The exclusion of work on Saturdays, Sundays, and legal holidays has been considered in computing the performance time of this contract. The following legal holidays are observed:
January 1st Third Monday in January Third Monday in February Last Monday of May July 4th 1st Monday of September 2nd Monday of October 11th of November Fourth Thursday of November 25th of December
When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday.
Work outside the hours of operation requires Contracting Officer's Representative approval. The request to work outside the hours of operation shall be made in writing to the Contracting Officer's Representative 10 calendar days prior to such work to allow arrangements to be made by the Government. The request application shall include specific dates, hours, location, type of work to be performed, contract number and project title, and names of all individuals who will be working outside the hours of operations. If work is performed during periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer's Representative.
25. Progress Schedule. The initial project schedule shall be in the form of a chart graphically indicating the sequence proposed to accomplish each work feature or operation pursuant to FAR Clause 52.236-15 "Schedules for Construction Contracts". Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The chart shall be prepared to show the starting and completion dates of all work features on a linear horizontal time scale beginning with date of Notice to Proceed and indicating calendar days to completion. The scheduling of the entire project is required. Provide a schedule that is a forward planning as well as a project monitoring tool. The Contractor shall indicate on the chart the important work features or operations that are critical to the timely overall completion of the project. Key dates for such important work features and portions of work features are milestone dates and shall be so indicated on the chart. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer's Representative will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
1. Activity Durations
2. Design and Permit Activities
3. Procurement Activities
4. Mandatory Tasks
a. Submission, review and acceptance of SD-01 Preconstruction Submittals (individual activity for each).
b. Submission, review and acceptance of features require design completion Submission, review and acceptance of design packages.
c. Submission of mechanical/electrical/information systems layout drawings.
d. Long procurement activities
e. Submission and approval of O & M manuals.
f. Submission and approval of as-built drawings.
g. Submission and approval of installed equipment lists.
h. Submission and approval of test data, and reports
i. Show Government and other agency activities that could impact progress. These activities include, but are not limited to: approvals, acceptance, design reviews, environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE), etc.
This schedule will be the medium through which the timeliness of the Contractor's construction effort is appraised. Anticipated adverse weather delay days shall be included in the schedule.
Submit the Initial Project Schedule for approval within 30 calendar days after notice to proceed is issued. No payment will be made for work items not fully detailed in the Project Schedule.
An Early Completion Schedule is an Initial Project Schedule (IPS) that indicates all scope of the required contract work will be completed before the contractually required completion date.
No IPS indicating an Early Completion will be accepted without being fully resource-loaded (including crew sizes and manhours) and the Government agreeing that the schedule is reasonable and achievable.
The Government is under no obligation to accelerate work items it is responsible for to ensure that the early completion is met nor is it responsible to modify incremental funding (if applicable) for the project to meet the contractor's accelerated work.
An updated schedule showing actual progress shall be submitted monthly and with each pay request.
Changes to the base-line schedule shall be outlined in a narrative describing the reason for the change.
26. Rate of Progress. Should the Contractor fail to maintain a satisfactory rate of progress in accordance with the Contractor's approved progress schedule, the Contracting Officer's Representative may require that additional personnel and equipment be placed on the work and weekend and overtime work be performed, in order that the work be brought up to schedule and maintained.
27. Preconstruction Conference. The Contracting Officer's Representative will conduct a Preconstruction Conference after receipt of Notice to Proceed by the Contractor and prior to the start of on-site construction activities. The date, time, and place for this conference shall be mutually agreed upon by the Contractor and the Contracting Officer's Representative. It is mandatory that the Contractor's project site supervisory personnel assigned to this project attend the conference; no personnel substitutions will be permitted. The purpose of the conference is to review contract requirements and to establish a working relationship between the Contractor's Staff and the U.S. Army Corps of Engineers personnel who will be closely associated with the project. During the conference, the Contracting Officer's Representative will inform the Contractor concerning job safety, project phasing, work hour restrictions, traffic control, quality control, labor relations, and environmental protection. The Preconstruction Conference will be arranged by the Contracting Officer's Representative.
28. Material Substitutions. This contract is based on the materials and methods as shown on the contract drawings and as described in this document. The Contractor shall not substitute materials or methods unless such substitution has been specifically approved in writing by the Contracting Officer's Representative.
29. Quality Control. The Contractor shall establish a three phase quality control system (the three phases are described below) to perform sufficient inspection of all items of work, including that of any subcontractors, to ensure conformance to this document with respect to materials, workmanship, construction, finish and functional performance. The system shall cover all construction operations, both onsite and offsite. The site project superintendent will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer's Representative for non-compliance with the quality requirements specified in the contract. The site project superintendent in this context shall be the highest level manager responsible for the overall construction activities at the site, including quality and production. The site project superintendent shall maintain a physical presence at the site at all times, except as otherwise acceptable to the Contracting Officer's Representative, and shall be responsible for all construction and construction related activities at the site.
The Quality Control Manager shall be a construction person with a minimum of three years in related work. This Quality Control Manager shall be on the site at all times during construction and shall be employed by the prime Contractor. The Quality Control Manager shall be assigned as System Manager but may have other duties in addition to quality control. The QC Manager may also serve as the Site Safety and Health Officer (SSHO) as delineated in Paragraph C4, below, and may have other duties in addition to site safety and health, but may not be the Contractor’s Site Superintendent.
The Contractor shall employ three phase Quality Control as follows:
Preparatory Phase: This phase is performed prior to beginning work after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:
a. A review of each paragraph of applicable specifications, reference codes, and standards. Maintain and make available in the field for use by Government personnel until final acceptance of the work.
b. Review of the contract drawings.
c. Check to assure that all materials and/or equipment have been tested, submitted, and approved.
d. Review of provisions that have been made to provide required control inspection and testing.
e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.
f. Examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.
g. Review of the appropriate activity hazard analysis to assure safety requirements are met.
h. Discussion of procedures for controlling quality of the work including repetitive deficiencies
i. Discussion of the initial control phase.
k. The Government must be notified at least 24 hours in advance of beginning the preparatory control phase. Include a meeting conducted by the Quality Control Manager and attended by the superintendent. Document the results of the preparatory phase actions on a daily Quality Control
Report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.
Initial Phase: This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:
a. Check work to ensure that it is in full compliance with contract requirements.
b. Verify adequacy of controls to ensure full contract compliance. Verify required control inspection and testing.
c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards.
d. Resolve all differences.
e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis.
Review the activity analysis with each worker.
f. The Government must be notified at least 24 hours in advance of beginning the initial phase
Follow-up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. Record the checks in the quality control documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.
30. Quality Assurance. All items of work not addressed in the contract documents shall be completed in strict accordance with the manufacturers’ specifications.
The Government is not obligated to inspect the Contractor’s work, or to protect the Contractor from the consequences of its work. Government inspections are a general examination of the Contractor’s conduct and workmanship and are solely for the purpose of the Government. Government-designated Quality Assurance Representatives (QARs) do not have the authority to accept work, nor is a Government inspection to be construed as conclusive.
Government agents including QARs and project engineers are not authorized to change the contract without the written approval of the Contracting Officer; this lack of authority extends to all situations in which the action of these agents could be construed as constituting a change.
The quality of workmanship is subject to audit by Government or Government-designated QARs at any time during the contract. The Contractor shall cooperate fully and provide all information necessary for this audit.
The Contractor shall submit all requests for changes in writing to the Contracting Officer. Do not proceed with changes without possession of written authorization of the Contracting Officer.
The Contractor shall not conceal any work unless the Contracting Officer has approved all items of work which are to be concealed. The Contractor shall notify the Contracting Officer's Representative of its intention to conceal work at least 24 hours in advance of concealment.
31. Utilities. The Government will furnish water and electricity from existing points of supply in the MTS Lab structure free of charge. The Contractor shall make his own investigations as to the suitability of these supplies for use on this project. Water and electricity required in the prosecution of the work in excess of that available from existing points of supply shall be furnished by the Contractor at his own expense. The Contractor shall conserve government furnished water and electricity.
32. Utility Outages and Interruptions: Make utility outages and interruptions during hours that will cause least impact to daily operations in each building. Coordinate all utility outages and interruptions, and utility cutovers with the Contracting Officer's Representative.
Where applicable, Utility Outage/Interruption Requests and Utility Cutover Requests shall be submitted in writing at least 15 calendar days in advance of the date desired for outages, interruptions, and cutovers; include at least one alternate date. Services shall not be interrupted or cutover until permission of the requested hours and dates is received from the Contracting Officer's Representative. The request(s) shall include the following information: Location(s) of outages and interruption(s), hours and dates of interruption(s), and which facilities, utilities and services are affected. The Contractor is cautioned that outages and/or interruptions may not be granted on the date(s) requested.
Interruptions shall be defined as any Contractor operation that interferes with services such as, but not limited to, building systems, heating and cooling equipment, electrical service, medical equipment, water, sanitary sewer, fire alarms, telephone service and data, interior and exterior lighting, generators, or roads.
Ensure that new utility lines are complete, except for the final connection or cutover before interrupting existing utility service(s).
Outages and interruption of services shall be limited to the days and the maximum number of allowed hours for a shutdown as follows: Electricity: 4 Hours.
The Contractor shall not be entitled to additional or overtime payment for utility outages, interruptions, and connections required to be performed outside the regular work hours.
The Contractor shall notify the Contracting Officer's Representative in writing at least 7 calendar days in advance of cancellation of any utility outage/interruption and utility cutover requests.
33. Temporary Electrical Equipment and Connections. The Contractor, at his own expense and in a workmanlike manner satisfactory to the Contracting Officer's Representative, shall install and maintain all necessary temporary connections and distribution lines. All required temporary electrical equipment and lines shall be furnished, installed, connected, and maintained by the Contractor according to EM 385-1-1, Section 11.E, NFPA 241,and NFPA 70, Article 305-6(b), "Assured Equipment Grounding Conductor Program". All temporary equipment and lines shall be removed prior to final acceptance of the work. Materials and equipment need not be new, but must be in good repair and serviceable condition.
Periodic inspections of systems and devices will be made by the Contractor at intervals not to exceed one week.
34. Location of Underground Facilities. Should excavation become necessary, obtain necessary digging permits prior to the start of excavation. Verify the elevations of existing piping, utilities, or any type of underground obstruction in locations to be impacted by the work. For excavation work in New Hampshire, call “Dig Safe” at 811. Notification shall not be earlier than 30 days prior, or later than 3 days prior, to the planned excavation.
35. Environmental Protection. The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract. Comply with all applicable environmental Federal, State, and local laws and regulations. Any delays resulting from failure to comply with environmental laws and regulations will be the Contractor's responsibility.
A. Environmental Protection Plan: Prior to commencing construction activities or delivery of materials and equipment to the site, the Contractor shall submit an Environmental Protection Plan for review and approval by the Contracting Officer's Representative. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. Issues of concern shall be defined within the Environmental Protection Plan. The Contractor shall address each topic at a level of detail commensurate with the environmental issue and required construction task(s). The Environmental Protection Plan shall be current and maintained onsite by the Contractor.
B. Obtaining and complying with all environmental permits and commitments, required by Federal, State, Regional, and local environmental laws and regulations is the Contractor’s responsibility.
C. Fuels and Lubricants: Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spill and evaporation.
Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded shall be stored in marked corrosion-resistant containers and recycled or disposed in accordance with State, and local laws and regulations. Storage of fuel on the project site is not allowed. Fuel shall be brought to the project site each day that work is performed. Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least 50 feet from any drainage inlets, water bodies (rivers, streams, lakes), environmentally sensitive areas (wetlands, vernal pools).
36. Waste Management. The Contractor shall provide on-site containers for the collection of demolition debris, waste materials, construction debris, and rubbish. The Contractor shall clean the project site on a daily basis to prevent the accumulation of waste materials and rubbish resulting from construction activities. The Contractor shall transport all solid waste off of the project site and dispose of it in compliance with Federal, State and local requirements for solid waste disposal. Upon completion of the construction work, the project site shall be returned to its pre-work condition.
Government policy is to apply sound environmental principles in the design, construction and use of facilities. As part of the implementation of that policy: (1) practice efficient waste management when sizing, cutting, and installing products and materials and (2) use all reasonable means to divert construction and demolition waste from landfills and incinerators and to facilitate their recycling or reuse.
Submit monthly documentation showing total amount, by weight, of construction debris diverted from landfills as a percentage of all construction debris on the project. The Contractor shall divert a minimum of 60 percent of waste and construction debris from landfill disposal. Include in documentation the total solid waste generated in tons, the total solid waste diverted from landfill in tons, and the total cost of the solid waste generated.
A Waste Management Plan shall be submitted within 15 days after Notice to Proceed and not less than 10 days before the preconstruction meeting. The plan shall demonstrate how the project waste diversion goal shall be met and shall include the following:
a. Name of individuals on the Contractor's staff responsible for waste prevention and management.
b. Actions that will be taken to reduce solid waste generation, including coordination with subcontractors to ensure awareness and participation.
c. Description of the regular meetings to be held to address waste management.
d. Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of wastes.
e. Characterization, including estimated types and quantities, of the waste to be generated.
f. Name of landfill and/or incinerator to be used and the estimated costs for use, assuming that there would be no salvage or recycling on the project.
i. Identification of materials that cannot be recycled/reused with an explanation or justification, to be approved by the Contracting Officer's Representative.
Revise and resubmit the Waste Management Plan as required by the Contracting Officer's Representative. Approval of Contractor's Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations or meeting project cumulative waste diversion requirement. Distribute copies of the Waste Management Plan to each subcontractor, the Quality Control Manager, and the Contracting Officer's Representative.
37. Trichloroethylene (TCE): The Contractor shall not bring on to the CRREL site any items/materials/equipment that contains trichloroethylene (TCE) as an ingredient. The Contractor is responsible to notify all of their subcontractors about this requirement. TCE can be found as an ingredient in solvents used for cleaning mechanical equipment, lubricants sprays, and some grease removers used for textiles. The list of trade names provided below is a partial listing of materials that should not be brought on site. In addition, if the Contractor uses a product containing TCE on equipment/materials/products off-site, the Contractor is responsible for ensuring that the equipment does not contain TCE residue that emits vapors at the CRREL site. Any item that may have been treated/cleaned with TCE off site should be unpackaged outside and wiped down with "TCE free solvent" prior to being brought into any building.
Trade Names and Synonyms:
Trichloroethylene Acetylene trichloroethylene Algylen Anameth Benzinol Chlorilen CirCosolv Germalgene Lethurin Perm-a-chlor Petzinol Philex TRI-Plus M Vitran for additionalrequirements pertaining to hazards and health effects of TCE, and therequirements for air monitoring.
38. Trichloroethylene (TCE) Monitoring:
A. The Contractor shall instruct each worker, prior to the start of work, on the hazards and health effects of trichloroethylene.
B. Existing Soil Contamination: In various locations at CRREL, soil and groundwater are contaminated with trichloroethylene (TCE). TCE is also present as a vapor in the soil at various locations at the CRREL facility, with highest concentrations around and beneath the Main Lab and Lab Addition buildings. In its pure state, TCE is a nonflammable, colorless liquid with a somewhat sweet odor and a sweet, burning taste. It is used mainly as a solvent to remove grease from metal parts, but is also an ingredient in adhesives, paint removers, typewriter correction fluids, and spot removers. TCE was used at CRREL in the past in support of the refrigeration process. Although TCE has not been used in the refrigeration process since 1987, several spills and leaks of TCE occurred on the CRREL property in the 1970s and early to mid 1980s. The Army is in the process of delineating the nature and extent of TCE contamination at CRREL and developing plans for remediation. TCE has been measured in soil vapor at CRREL and, to a lesser extent in ambient air near the Main Lab and Lab Addition. This vapor has also intruded into buildings at CRREL, prompting continuing efforts to mitigation exposures in those buildings. The Contractor should be aware of the properties of TCE and potential health effects.
C. Due to trichloroethylene (TCE) contamination on site, during all work in the Main Lab and Lab Addition buildings, and for any work involving soil excavation, the Contractor shall provide and maintain a photo-ionization detector (PID) in the work area suitable for detecting VOCs (especially TCE) in the air. The PID shall be used to monitor the breathing zone during work periods, and keep a record of periodic measurements. Should the breathing zone VOC level exceed 5.0 ppmv sustained for five minutes, the Contractor shall notify the Contracting Officer's Representative, who may conduct further testing. The Contractor shall halt work if the VOC level exceeds 25 ppmv and wait for VOC levels to dissipate. If the VOC concentrations do not dissipate to less than 25 ppmv within 15 minutes, the Contractor shall maintain the work stoppage and immediately notify the Contracting Officer's Representative. These provisions shall be described in the APP.
D. The Site Safety and Health Officer (SSHO) shall have a minimum of 3years experience conducting real time air monitoring (especially for TCE), and interpreting results for the purpose of identifying PPE requirements.
39. Contract Drawings and Information Drawings. Contract drawings showing the work to be performed under this contract and information drawings showing the original construction of the facility and related items are included with this document.
40. Photographs. Photographs showing the existing conditions of the wall and adjacent items are included in the contract drawings. The photographs are attached for informational purposes only. The Contractor shall make his own investigations of existing conditions in the field prior to the start of work.
The Contractor shall be responsible for any errors which could have been avoided by such investigations.
41. Damages. The Contractor shall exercise caution and follow sound construction practices in the conduct of the work to avoid construction-related damage to existing features to remain
42. Sequence of Work. The work shall be performed in the following sequence: existing conditions verification, preparation of submittals, material procurement, establish site safety, demolition, install new work features, and project close out. Coordinate this sequence with the requirements of Paragraph “Progress Schedule”.
43. Contractor's Receipt of Supplies. The Contractor shall be responsible for all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site.
44. Storage Area. The storage area for use by the Contractor, for work and storage of equipment, materials, and trailers during the life of this contract will be determined at the Preconstruction Conference. The storage area will be located on the CRREL Facility property, in the vicinity of the project site. The Contractor shall confine its storage area to the limits as designated or approved by the Contracting Officer's Representative and shall be responsible for the security of the area.
This is the start of the file's text. The full file is on GovTribe.