Specifications.pdf

PDF 236 KB Posted

Attached to
PURCHASE FISHING DOCK SUPPLIES
Solicitation number
140P6422Q0030
Issued by

View the file

Other files

File Type Posted
Price_Schedule.xlsx XLSX spreadsheet
Price_Schedule.pdf PDF
Sol_140P6422Q0030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pictured Rocks National Lakeshore Munising, Ml 49862

Specifications for Dock Supplies (Grand Sable Lake Fishing Pier)

NATIONAL

PARK

SERVICE

NATIONAL PARK SERVICE

INTERIOR REGIONS 3/4/5

OHIO MAJOR ACQUISITION BUYING OFFICE

• Material to be supplied: Specifications based on EZ Dock System. The requirement is brand name "or equal" and must meet or exceed the listed Specifications. Please submit a specification sheet for all products that are being quoted.

Item Description

10' SOBA/ADA ALUMINUM RAILING W/8

100910AL HDWR CONNECTORS

10' SOBA ADA ALUMINUM RAILING W /8

100912AL HDWR CONNECTORS

5' ALUMINUM RAILING W/BE/SEAT AND

100915AL HARDWARE CONNECTORS

5' ALUMINUM RAILING W/AC/SEAT & 4

100916AL HDWR CONNECTORS

300970AL PE BENCH W / ARMS& HDWR ALUM

206010 DOCK 60" x 10' w/10 pkt fillers

301100 1 COUPLER SET, COMPLETE

135250 KIT, PIPE BRACKET 2.5" SD W/ COUPLER

100026 GALV PIPECAP FOR 2-3/8" PIPE

100255 AUGER KIT FOR 2.5" O.D. PIPE

110025 2-3/8" OD x 10' GALV PIPE lOGA

100025 CUT, DRILL AUGER/PIPE

35116 BROWN PLASTIC CURB 2.5"x3.S"xll6"

80530SS 3" FLATHEAD SCREWS FOR CURB

5' Heavy Duty Aluminum Transition Plate -

GL-60-TP-ADA ADA

5' Standard Duty Gangway to Float Hinge - 3 Pocket hinge for gangways

GL-60-FSD3 up to 12' long

900005 DRIVE TOOL 15/16" SOCKET ADPTR

9000010SS IN-WATER INSTALLATION TOOL SS

Shipping/Delivery Estimated Shipping/Delivery

• The location of the material to be delivered:

Qty lEA

2EA

2EA

2EA

lEA

5EA

12EA

5EA

5EA

5EA

5EA

5EA

5EA

30EA

lEA lEA

2EA

lEA lEA

a. Deliver to: E9758 County Road H-58, Munising MI 49862

• The delivery schedule:

a. Delivery: 60 Days after Contract A ward

• Any applicable performance standards:

a. Delivery will be FOB Destination.

File details come from the government source that posted it. Updated .