Specifications.pdf

PDF 3 MB Posted

Attached to
Welded Steel Pipe and Appurtenances - De Soto Trunk Line Project
Solicitation number
8082
Issued by
Los Angeles County, California

About this file

This document is an Invitation for Bid (IFB) No. 8082 issued by the Los Angeles Department of Water and Power (LADWP) for the furnishing and delivery of welded steel pipe and appurtenances for the De Soto Trunk Line Replacement Project located in Los Angeles, California. The primary deliverable consists of approximately 4,900 feet of 54-inch inside diameter steel pipe with varying wall thickness, along with smaller diameter pipes (6-inch, 8-inch, and 12-inch), flanges, elbows, tees, mechanical couplings, stainless steel ladders, and associated appurtenances as detailed in the specifications and drawings. Additional optional items include supplementary pipe sections, butt straps, joint diapers, test bulkheads, and maintenance access outlets. All materials must be delivered F.O.B. to the LADWP Tyrone Yard at 7501 Tyrone Avenue, Van Nuys, California. Bids must be submitted electronically through the LADWP's eRSP online purchasing system by 2:00 p.m. on the bid closing date, with a bidders' conference scheduled to discuss project scope and bidding requirements. The successful bidder's proposal will be subject to Board approval and Los Angeles City Council review before contract execution.

Pricing shall be submitted in U.S. dollars as firm, fixed prices, with all prices excluding sales and use taxes but including federal duties. Transportation or freight charges must be separated and listed distinctly from equipment costs. The project is funded through the Drinking Water State Revolving Fund (DWSRF) administered by the U.S. Environmental Protection Agency and the State Water Resources Control Board, making it subject to federal requirements including American Iron and Steel (AIS) compliance, Build America Buy America (BABA) provisions, and Disadvantaged Business Enterprise (DBE) good faith effort requirements with established participation goals of 11 percent for Minority Business Enterprises and 4 percent for Women's Business Enterprises in the construction category. Bidders must comply with all federal and state environmental regulations, provide evidence of NSF/ANSI 61 and NSF 372 certification for all products, submit numerous mandatory forms including debarment certifications and non-collusion affidavits, and maintain comprehensive insurance coverage as specified in the contract documents. The successful bidder must be a responsive and responsible contractor with satisfactory performance history and must comply with all City of Los Angeles requirements including child support obligations, equal employment practices, and campaign contribution restrictions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF WATER AND POWER

OF

THE CITY OF LOS ANGELES

NO. 8082

INVITATION FOR BID (IFB)

WELDED STEEL PIPE AND APPURTENANCES FOR THE

DE SOTO TRUNK LINE REPLACEMENT PROJECT

A DOWNLOADABLE INVITATION FOR BID DOCUMENT

IS AVAILABLE AT THE eRSP ONLINE PURCHASING WEB PAGE http://www.ladwp.com/eRSP

REGISTRATION IS REQUIRED.

NO HARD COPIES WILL BE AVAILABLE FOR MAILING OR PICKUP

LOS ANGELES DEPARTMENT OF WATER AND POWER

SUPPLY CHAIN SERVICES

VENDOR LIAISON CENTER

111 NORTH HOPE STREET, L-43

LOS ANGELES, CA 90012

IFB 8082

TABLE OF CONTENTS

PART DIV. SEC. TITLE

A A1 NOTICE INVITING BIDS

A2 ACCESS TO PROPRIETARY DRAWINGS

B B1 INSTRUCTIONS TO BIDDERS

B2 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

C BIDDING DOCUMENTS

C1 MANDATORY BIDDING FORMS

C2 PROPOSAL SCHEDULE

C3 SUPPLEMENTAL BID INFORMATION

C4 GOOD FAITH EFFORT (GFE) DOCUMENTATION FORMS

D D1 THE CONTRACT DOCUMENTS

E E1 GENERAL CONDITIONS

E2 ADDITIONAL GENERAL CONDITIONS

F DETAILED SPECIFICATIONS

F1 GENERAL REQUIREMENTS

F1A SPECIAL CONDITIONS

F01330 SUBMITTALS

F01430 INSPECTION

F2 DETAILED REQUIREMENTS

F02560 FABRICATION OF WELDED STEEL PIPE

F02565 LININGS AND COATINGS FOR WELDED STEEL PIPE

F5 METALS

F05121 STAINLESS STEEL LADDERS AND APPURTENANCES

A1-1

PART A - DIVISION A1

NOTICE INVITING BIDS

The Los Angeles Department of Water and Power invites electronic bids for furnishing and delivering Welded Steel Pipe and Appurtenances for the De Soto Trunk Line Replacement

Project in accordance with Invitation for Bid (IFB) No. 8082.

For the purposes of this bidding opportunity, all divisions within this “Invitation for Bid” document including Instructions to Bidders, Supplemental Instructions to Bidders, Mandatory

Bidding Forms, Proposal Schedule, Supplemental Bid Information, Contract Documents, General

Conditions, Additional General Conditions, Special Conditions, Detailed Requirements, and attachments are collectively referred to as “specifications.”

Proposals shall be submitted on the LADWP’s bidding documents in accordance with these specifications. All proposals shall be submitted at or before 2:00 p.m. on the bid closing date.

Proposals shall be subject to acceptance within a period of 90 calendar days after date of bid closing.

The LADWP reserves the right to reject any and all proposals.

In the performance of any contract awarded, the bidder shall not discriminate in employment practices against any employee or applicant for employment because of race, religion, national origin, sex, age, or physical handicap.

TANESHA SMITH

Director of Strategic Purchasing and

Supply Chain Management

END OF DIVISION

A2-1

PART A DIVISION A2

ACCESS TO PROPRIETARY DRAWINGS

A project Managed File Transfer (MFT) link that includes softcopies of proprietary drawings will be available as described herein. In order to receive the MFT link, the bidder is required to complete, sign, scan, and email a copy of “Confidentiality Agreement” affidavit to the Vendor

Liaison Center (VLC) at purchbids.purchbids@ladwp.com. The subject line of the email shall include the IFB Number and Title. The LADWP will not release any MFT link without securing a “Confidentiality Agreement” affidavit from the bidder.

A copy of the “Confidentiality Agreement” affidavit is provided on the next two pages. The

“Confidentiality Agreement” affidavit shall be completed and signed by a duly authorized representative of the bidder’s company.

A project MFT link will be sent to such bidders upon receipt of signed copy of Confidentiality

Agreement affidavit. Bidders may call the Vendor Liaison Center at (213) 367-2252 for more information. The Vendor Liaison Center is open for business between the hours of 8:00 a.m.

and 4:00 p.m., Monday through Friday, except on holidays.

A2-2

CONFIDENTIALITY AGREEMENT

TITLE OF IFB: WELDED STEEL PIPE AND APPURTENANCES FOR THE

DE SOTO TRUNK LINE REPLACEMENT PROJECT

IFB NO. 8082

1. Confidentiality of Drawings:

All drawings provided by the LADWP to the bidder, or accessed or reviewed by the bidder, during the bidding process of these specifications shall remain the property of the LADWP. All drawings provided by the LADWP to the bidder or accessed or reviewed by the bidder during the bidding process of these specifications, are deemed confidential. The bidder agrees not to provide these drawings, nor disclose their content or any information contained in them, either orally or in writing, to any other person or entity. The bidder agrees that all drawings used or reviewed in connection with the bidding process shall be used only for the purpose of carrying out the LADWP’s business and cannot be used for any other purpose. The bidder shall be responsible for protecting the confidentiality and maintaining the security of all LADWP drawings in its possession.

2. Access and Control of Drawings:

a. The bidder shall make drawings provided by the LADWP to the bidder or accessed or reviewed by the bidder during the bidding process, available to its employees, agents or subcontractors, only on a need-to-know basis. Further, the bidder shall provide written instructions to all of its employees, agents and subcontractors, with access to the drawings about the terms and conditions of this Confidentiality Agreement to avoid any unauthorized use or disclosure.

b. The bidder shall store and process all drawings in an electronic format in such a way that unauthorized persons cannot retrieve the drawings by computer, remote terminal, or other means.

c. The bidder shall document and immediately report to the LADWP any unauthorized use or disclosure of drawings provided by the LADWP.

3. Term of Agreement:

a. The term of this Confidentiality Agreement shall commence as of the date of the first disclosure of drawings by the LADWP and shall end after the destruction of all drawings as provided below.

b. All unsuccessful bidders shall destroy all drawings pertaining to these specifications, in both electronic and hard copy form, within sixty (60) days after the contract is awarded. The unsuccessful bidder shall destroy all drawings using any method that would prevent disclosure, or reconstruction of the contents of the drawings including, but not limited, to physical destruction of compact discs, shredding of hardcopies, or erasing files on hard disks and mobile equipment.

A2-2

c. The successful bidder (Contractor) shall maintain and protect all drawings pertaining to these specifications, in both electronic and hard copy forms, for the duration of the contract and in accordance with the Article titled “Right to Audit” in Division E1 of these specifications. The successful bidder (Contractor) shall keep and preserve all records during the performance of the work and under the provision of the contract not less than 4 years past final payment, or until final settlement of all disputes, claims, or litigation, whichever occurs later. After such period, the successful bidder (Contractor) shall destroy all drawings pertaining to these specifications by any method that would prevent disclosure or reconstruction of the contents of the drawings including, but not limited, to physical destruction of compact discs, shredding of hardcopies, or erasing files on hard disks and mobile equipment.

4. Subcontractors Subject to the Confidentiality Agreement:

Any subcontract entered into pursuant to the terms of these specifications shall be subject to, and shall incorporate, the provisions of this Confidentiality Agreement for all drawings.

5. A bidder will be held legally responsible for all harm arising from the bidder’s improper and unauthorized release of the LADWP’s drawings.

The bidder has caused its duly authorized representative to execute this Confidentiality Agreement as follows:

Bidder’s Company Name:

Physical Address:

Email Address:

Authorized Representative:

Title of Authorized Representative:

Signature:

Date:

B1-1

PART B - DIVISION B1

INSTRUCTIONS TO BIDDERS

1. Format, Completion, Signature, and Transmittal of the Bid Submittal or Proposal: The

LADWP employs the electronic Request Solicit Procure (eRSP) online purchasing system for posting its Invitation for Bids and receiving bid prices and documents.

Bidders shall log on to the LADWP’s website at http://www.ladwp.com and register at the eRSP online purchasing system web page http://www.ladwp.com/ersp to access, download and print all required bid documents. Complete, sign, scan, and upload all required bid documents prior to the bid closing date and time in accordance with the instructions indicated herein.

Bid submittals shall be clean, legible, complete, with no missing page(s), and in accordance with instructions indicated herein. Electronic signatures, including a scanned copy of a document with signature(s), are accepted as legally binding and equivalent to wet or manual signatures.

Bids shall be submitted in accordance with the following procedures:

a. All price and pricing-related information shall be entered directly into the eRSP system.

b. All mandatory bidding forms listed in DIVISION C1 are located on the “Vendor Checklist” page of the eRSP system. To access these forms, the bidder shall select (click) the “Respond

Online” link located on the left side of the screen and thereafter “CREATE” a Bid Response in the eRSP system. Following that, the bidder shall download, print, complete, sign, scan and upload each bidding form including all applicable attachments. Each completed and signed bidding form shall be uploaded to its designated location on the “Vendor Checklist” page of the eRSP system.

Late bids and bids submitted via electronic mail (email), facsimile, or hardcopy will not be accepted.

c. After bid closing and upon request by Supply Chain Services, the bidder shall download, print, complete, sign, scan and email copies of ALL pages in DIVISION C3 including all applicable attachments to the Utility Buyer within 5 business days. Failure to comply with this instruction may result in “bid” being deemed nonresponsive.

d. Three (3) business days after the bid closing date, the bidder shall complete and submit the “Good Faith Effort (GFE) Documentation Forms” package located in Division C4 with all applicable attachments in hardcopy pursuant to Subarticle 1e(1) of Division B2.

Bidders shall submit all uploaded bid submittals in a portable document format (PDF) with an optimal resolution of 300 dpi. An uploaded bid submittal shall be a true representation or an identical copy of the original. The content and number of pages of both the electronic scanned copy and the paper original shall be identical with no alterations.

DIVISION B1 INSTRUCTIONS TO BIDDERS

B1-2

To determine the authenticity of a bid submittal or to clarify illegible bid submittals, the LADWP reserves the right to request any or all completed original copies of bid submittals. Therefore, the bidder shall retain all completed original paper copies of bid submittals in a secure location readily accessible for transmittal upon request by the LADWP.

When requested by the LADWP, the bidder shall provide completed original hardcopies of any or all uploaded bidding forms as listed in Division C1 or original hardcopies of emailed Division C3 pages including attachments to the Director of Supply Chain Services Division. Requested original hardcopies of bidding forms or pages shall be submitted on letter-size sheets of white paper.

When requested, original hardcopies of uploaded documents shall be enclosed in a sealed envelope plainly marked in the upper left-hand corner with the name and the address of the bidder. The envelope shall bear the words “Original Bid Documents for” or “Original Proposal

Documents for”, followed by the IFB number, and the title of the IFB. Requested original bid documents shall be mailed to:

DIRECTOR OF SUPPLY CHAIN SERVICES DIVISION

CARE OF VENDOR LIAISON CENTER

LOS ANGELES DEPARTMENT OF WATER AND POWER

PO BOX 51111 RM L-43

LOS ANGELES CA 90051-0100

Requested original bid documents sent by a messenger shall be delivered to Room L-43, 111 North Hope Street, Los Angeles, California 90012.

2. Compliance with Federally Funded Project Provisions: Work to be performed under this

Contract will be funded by the Drinking Water State Revolving Fund (DWSRF), administered by the United States Environmental Protection Agency (USEPA) and the State Water Resources

Control Board (SWRCB).

The bidder shall comply with all applicable terms and conditions, special provisions, and reporting requirements, as set forth in these specifications, and as may be required by federal law, rule, or regulation.

3. Interpretations and Addenda: Should a bidder find discrepancies or omissions in the plans, specifications, or other documents, or should there be doubt as to their true meaning, the bidder shall submit such requests electronically using the eRSP system for an interpretation or clarification thereof. A request for addenda, interpretation, or clarification shall be received by the LADWP in time to permit an electronic response before the date and time of bid closing. A request for addenda, interpretation, or clarification shall be received by the LADWP in time to permit an electronic response before the date and time of bid closing. Any interpretation of or change in the documents will be made only by addendum issued electronically using the eRSP system and shall become a part of any contract awarded. The LADWP will not be responsible for any other explanation or interpretations.

B1-3

4. Correspondence: All inquiries or correspondence to the LADWP prior to the bid closing date and time shall be conducted using the eRSP system. The Buyer listed in the eRSP system is responsible for the conduct of this procurement. Bidders shall not contact or communicate with any other LADWP employees. Any verbal or written communications between any bidder

(potential or actual), or its representatives and any LADWP Commissioner, employee, or contracted consultant regarding this procurement are strictly prohibited from the date of IFB advertisement through the date of execution of contract, with the exception of discussions initiated by LADWP during the evaluation process. Any violation of the requirements set forth in this Article may constitute grounds for immediate disqualification of the offending bidder from participation in this procurement.

5. Specified Materials or Equivalent: Whenever any particular material or process is specified by a patent or proprietary name, by a trade or brand name, or by the name of a manufacturer, such wording is used for the purpose of describing the material or the process and shall fix the standard of quality required and shall be deemed to be followed by the words "or equivalent".

The bidder may offer any material or process which shall be the equivalent of that so specified.

Bids offering an “equivalent” material or process shall be considered responsive and suitable for an award if such material or process along with its specifications as identified on the bid response meets the salient physical, functional, or performance characteristics of the advertised brand, model, or process. The LADWP shall be the sole determiner of compliance with these specifications.

6. Changes to Specifications: The bidder shall not change any wording in these specifications.

Language of negation or limitation of any rights, remedies, or warranties provided by law will not be considered part of the bid or proposal. Bids offered subject to conditions or limitations may be rejected.

If the bidder intends to take any deviations or exceptions to the specifications, the bidder shall submit a written request to the LADWP. A written request for deviations or exceptions to the specifications shall be received by the LADWP by the close of the “Question Cut-Off Date/Time” period as indicated in the eRSP system. If the LADWP considers such deviations or exceptions acceptable, an Addendum will be issued allowing such deviation or exception to the specifications. All bidders will be notified by Addendum of any approved changes to the specifications. The LADWP may reject bids containing deviations or exceptions not previously accepted through a written Addendum.

7. Language: Everything submitted by the bidder shall be written in the English language.

8. Sales or Use Taxes: For the purpose of bid evaluation, prices quoted by the bidder shall not include any applicable sales or use taxes.

The successful bidder shall include applicable California sales taxes in their invoice(s) in accordance with the Article titled “Invoices” of Division E2.

B1-4

9. Federal Excise Taxes: Prices quoted by the bidder shall be exclusive of federal excise taxes pursuant to exemption of political subdivisions of a state by federal law.

10. Duties: Prices quoted by the bidder shall include all applicable duties.

11. Comparison of Bids: For the purpose of comparing bids, it will be assumed that the quantity or quantities indicated in Division C2 will be required during the contractual period.

Bids will be further compared after adjustments are made for evaluation purposes in accordance with “applicable” price related factors including, but not limited to, cash discount, combined award discount, and guaranteed technical characteristics.

12. Award of Contract: Award of contract will be in accordance with the provisions of this

Article. The right is reserved to reject any and all proposals. Contracts shall be let to the lowest responsive and responsible bidder furnishing satisfactory security for performance. This determination may be made on the basis of the lowest ultimate cost of the items in place and use. Where the items are to constitute a part of a larger project or undertaking, consideration may be given to the effect on the aggregate ultimate cost of the project or undertaking.

Failure of the apparent successful bidder to submit to the Director of Supply Chain Services

Division representative a valid Business Tax Registration Certificate (BTRC), Vendor Registration

Number (VRN) or Exempt Tax Registration Certificate, as specified under “City Business Tax

Requirements” in Division E2, within 5 business days of notification may result in the award of contract being withheld, being deemed non-responsive, or LADWP taking other action permitted under this bid.

The bidder is required to complete, sign, and submit the Contract Signature Page form in Division

C3. The form shall be validated with 2 authorized signatures.

If the Contract Signature Page form is signed on behalf of the company by anyone other than officer indicated on the signature line, the bidder shall furnish a certified evidence of signature authority for each person executing on behalf of the company.

Any action taken by the Board will be subject to review by the Los Angeles City Council and will not be final until such review process has been completed pursuant to Section 245 of the

Los Angeles City Charter. The award of contract protocol will be in accordance with ONE of the following:

a. If No Bonds or Insurance Certificates Are Required: If no bonds or insurance certificates are required, the Contract Signature Page will be executed by the LADWP after the Board approves the contract and the Los Angeles City Council review process is completed. The contract shall become effective on the date the Contract Signature Page is executed.

No work shall commence under the contract and no payments can be made to the successful bidder until the Contract Signature Page is executed by the LADWP.

B1-5

A contract award notification e-mail that includes a copy of the executed Contract Signature

Page will be issued by Supply Chain Services to the Contractor.

b. If Bonds or Insurance Certificates Are Required: If bonds or insurance certificates are required, Supply Chain Services will issue a “Notice of Approval” e-mail to the successful bidder after the Board approves the contract and the Los Angeles City Council review process is completed.

The successful bidder shall furnish all required bonds or insurance certificates within

30 calendar days of receiving the “Notice of Approval” e-mail. The contract will be executed upon the prompt submission, review, and approval of all required bonds or insurance certificates pursuant to Divisions B1 and F1. The successful bidder's failure to comply with the timely submission of all required and valid bonds or insurance certificates may be deemed a breach of this contract.

Once bonds or insurance requirements are received and approved, the Contract Signature

Page will be executed by the LADWP. The contract shall become effective on the date the

Contract Signature Page is executed.

No work shall commence under the contract and no payments can be made to the successful bidder until the Contract Signature Page is executed by the LADWP.

A contract award notification e-mail that includes a copy of the executed Contract Signature

Page will be issued by Supply Chain Services to the Contractor.

c. For Construction Contracts – Bonds and Insurance Certificates Required: For

Construction Contracts, Supply Chain Services will issue a “Notice of Approval” e-mail to the successful bidder after the Board approves the contract and the Los Angeles City Council review process is completed.

The successful bidder shall furnish all required bonds and insurance certificates within

30 calendar days of receiving the “Notice of Approval” e-mail. The contract will be executed upon the prompt submission, review, and approval of all required bonds and insurance certificates pursuant to Divisions B1 and F1. The successful bidder's failure to comply with the timely submission of all required and valid bonds or insurance certificates may be deemed a breach of this contract.

Once bonds and insurance requirements are received and approved, the Contract Signature

Page will be executed by the LADWP. Following that, the Contract Administrator will issue a “Notice to Proceed” letter to the Contractor to specify the start-date of construction. No work shall commence and no payments can be made until the start-date of construction as specified on the “Notice to Proceed” letter.

13. City Business Tax Requirements: The bidder shall state in Division C3 the bidder's business tax registration certificate account number or, for those bidders that are exempt, a vendor

B1-6 registration number. The City's business tax requirements are specified in Division E2. After bid closing and upon request by Supply Chain Services, the City Business Tax Registration Certificate

(BTRC) or Vendor Registration Number (VRN) shall be emailed to the Utility Buyer within 5 business days in accordance with Subarticle 1c of Division B1 and the article titled “Award of

Contract” of this Division.

14. Public Records: All documents submitted in response to these specifications will become a matter of public record and shall be thereupon considered public records. If a bidder believes that any portion of its proposal is exempt from public disclosure, such portion shall be clearly marked “Trade Secret,” “Confidential,” or “Proprietary.” By submitting information with portions marked in this manner, the bidder represents that it has a good faith belief that such material is exempt from disclosure under the California Public Records Act, California Government Code §§

6250, et. seq. A bidder that indiscriminately marks all or most of its proposal as exempt from disclosure as a public record, whether by the notations of "Trade Secret," "Confidential,"

"Proprietary," or otherwise, may render the proposal nonresponsive and will be rejected. The

LADWP will not provide advice as to the nature or content of documents entitled to protection from disclosure under the California Public Records Act, including interpretations of the Act or the definitions of “Trade Secret,” “Confidential” or “Proprietary.”

The LADWP is not liable or responsible for the disclosure of records marked “Trade Secret,”

“Confidential” or “Proprietary,” including those exempt from disclosure if disclosure is deemed required by law, by an order of Court, or which occurs through inadvertence, mistake or negligence on the part of the LADWP or its Board, officers, representatives, assigns, successors, employees or agents. At such time as proposals are deemed a matter of public record, pursuant to the above, any bidder or member of the public shall be afforded access for inspection or copying of such proposals, by request made to the LADWP in compliance with the California

Public Records Act.

The bidder shall agree to reimburse the LADWP for, and to indemnify, defend and hold harmless the LADWP, its Board, officers, representatives, assigns, successors, fiduciaries, employees and agents from and against any and all claims, damages, losses, liabilities, suits, judgments, causes of action, demands, fines, penalties, costs and expenses including without limitation, attorneys’ fees, expenses and court costs of any nature whatsoever arising from or relating to the LADWP’s non-disclosure of any such designated portions of a proposal if disclosure is deemed required by law or court order. Additionally, the LADWP may request that the bidder directly defend any action for disclosure of any information marked "Trade Secret," "Confidential," "Proprietary," or otherwise.

15. Security Policy and Requirements: The bidder shall comply with all LADWP physical and cyber-related security policies, standards, requirements and procedures collectively referred to as “Security Requirements”, applicable to the project. All bidder personnel, equipment, products, services, and sub-contractors involved with the work shall comply with all applicable

Security Requirements throughout the duration of the contract. Security Requirements may be imposed by LADWP policy, or by Federal, State or Local laws, regulations or industry practices, B1-7 including, without limitation, requirements that may be imposed by the Federal Energy

Regulatory Commission (FERC), the North American Electric Reliability Corporation (NERC), the

Western Electricity Coordinating Council (WECC), the Department of Energy (DOE), the

Environmental Protection Agency (EPA), and the Department of Homeland Security (DHS).

Inability to meet the LADWP’s Security Requirements may be considered when evaluating the bidder’s consideration and award of contracts, including extensions or amendments to existing contracts. As security regulations and practices change over time, amendments and extensions to existing contracts may include additional Security Requirements not present in earlier contracts.

16. Bidders' Conference: A pre-bid conference will be held to discuss the scope of the project and the bidding requirements for these specifications. During the conference, prospective bidders will also receive information on the LADWP’s DBE Outreach Program and Online

Purchasing System. The exact time, date, and location of the conference is specified on the eRSP system.

Note: The person who will be attending the Bidder’s Conference is strongly encouraged to disseminate and convey all information discussed at the Bidder’s Conference to the appropriate staff member(s) who will be responsible for preparing and submitting the bid.

17. Labor Laws: The successful bidder and the bidder's agents, employees, and subcontractors shall comply with all applicable provisions of the Labor Code and all federal, state, and local laws and regulations which affect the hours of work, wages, and other compensation of employees, nondiscrimination, and other conduct of the work.

18. Established Agent or Representative: The LADWP desires that bidders have an established agent or representative located in the Los Angeles, California area, who is qualified and authorized to give technical assistance if required. The bidder shall state in Division C3 the name and location of the agent or representative qualified to provide such assistance.

19. Insurance - General Statement: It is the LADWP’s policy that upon the award of a contract, the successful bidder shall provide evidence of insurance that complies with the insurance requirements of the contract. Insurance requirements are explained in detail in Division F1 and the “Contract Insurance Requirements - Department of Water and Power” attached to these specifications, which specifically outlines the types and amounts of coverage required for this contract.

The successful bidder shall submit acceptable evidence of the required insurance, from insurers acceptable to the LADWP, within 30 calendar days of receiving a “Notice of Approval” via LADWP

Risk Management Insurance Compliance System as described in the Subarticle titled “Submission of Acceptable Proof of Insurance and Notice of Cancellation” of Division F1. Insurance shall be maintained current throughout the term of the contract. Said evidence of insurance shall be on file with the Risk Management Section in order to commence work under the contract and in order to receive payment for services or work rendered under the contract.

B1-8

For further information regarding these requirements, the bidder shall contact:

LOS ANGELES DEPARTMENT OF WATER AND POWER

RISK MANAGEMENT SECTION

Telephone: (213) 367-4674

Fax: (213) 367-0214

Web: http://www.ladwp.com/riskmanagement

20. Protest Procedure:

a. General: The intent of this procedure is to provide bidders with a process to formally object to the content of the solicitation documents or a contract award.

In order for a protest to be considered, the Protestor shall adhere to the LADWP’s Protest

Procedure by providing a written submission which shall contain, at a minimum, the following elements:

(1) Name and address of the Protestor.

(2) Its relationship to the procurement sufficient to establish that the Protest is being filed by an Interested Party.

Note: An Interested Party means a prospective or actual bidder whose direct economic interest would be affected by the solicitation contents or by the award of a contract or by the failure to award a contract. Interested parties do not include subcontractors or suppliers of an actual or prospective bidder, or joint venture members acting independently of a joint venture.

(3) Written proof that the Protest has been filed in a timely manner.

(4) The specific Invitation for Bid/Request for Proposal number and title identified in the solicitation.

(5) The specific staff action or inaction that is being protested.

(6) If the protest is regarding the content of the solicitation documents, identify the provision(s) of the solicitation that is being protested (Content).

(7) All supporting documentation to support the allegations in the Protest.

(8) Statement of specific relief being requested.

B1-9

All Protests shall be filed in writing to:

DIRECTOR OF SUPPLY CHAIN SERVICES

LOS ANGELES DEPARTMENT OF WATER AND POWER

111 N HOPE ST RM L-43

LOS ANGELES CA 90012

EMAIL: scsprotests@ladwp.com

At the Protestor’s discretion, a Protest may be filed by email (with original hard copy by express mail or by any other receipt means). The LADWP is not responsible for lost or otherwise delayed deliveries. No other location or addresses shall be acceptable. Appeals addressed to the attention of the LADWP General Manager shall be delivered to the above listed address for date and time stamping.

The Protestor may withdraw its Protest or Appeal at any time before the LADWP issues a final decision.

b. Protest Regarding Content of Solicitation Documents: To be considered timely, Protests concerning the contents of an Invitation for Bid/Request for Proposal for Board

Awarded contracts, including all attached documents, shall be filed with the LADWP within

7 calendar days after the advertisement of the solicitation by the LADWP or 3 calendar days from the issuance of any addendum to the Invitation for Bid/Request for Proposal. The

Protest shall be received not later than 4:00 p.m. local time. If the due date falls on a weekend or legal holiday, the Protest period ends at 4:00 p.m. local time the following business day. A Protest not filed within the time limits stated herein may be rejected without consideration or evaluation.

The LADWP will issue a written decision on the Protest for content prior to the bid closing or submission of proposals.

c. Protests Regarding Award: Any bidder in the course of a competitive solicitation who is determined nonresponsive or who is not being recommended for award of a contract may Protest the solicitation award.

Protests concerning a recommendation for award, on any ground not based on the content of the Invitation for Bid/Request for Proposal, shall be filed with the LADWP by an

Interested Party within 7 calendar days of the date of the notice of a recommended award or non-select letter. The Protest shall be received not later than 4:00 p.m. local time. If the calendar day falls on a weekend or legal holiday, the Protest period ends at 4:00 p.m. local time the following business day. A Protest not filed within the time limits stated herein may be rejected without consideration or evaluation.

d. Protests Appeal Procedure: A letter of appeal to the LADWP General Manager related to an award of a contract shall be filed by the Protestor within 5 calendar days of the date

B1-10 of the denial of the Protest. The Appellant will be provided with the final determination made by the LADWP General Manager.

e. Failure to Comply with Requirements: If the Protest does not comply with any of the preceding requirements, it may not be considered for evaluation and may be returned to the Protestor who submitted the written documentation.

21. Separation of Transportation or Freight Prices:

a. General: The price quoted for transportation or freight shall not be included in the price quoted for the equipment or material in accordance with the "Regulation 1628, Transportation Charges, Sales and Use Tax Regulations of the State of California, Board of

Equalization."

The separation of transportation or freight requires transportation or freight charges to be listed separately.

Transportation or freight charges shall not include any handling related fees or charges. All handling related charges are to be added to the cost of the item.

The transportation or freight charge(s) shall represent the actual charge for transportation from the origin of shipping to the delivery point at the LADWP.

Failure to separately list the cost of transportation or freight from the cost of the Item(s) will result in the bid being deemed nonresponsive.

b. Transportation by Carrier: If the bidder proposes to use U.S. Mail, independent contractor, or common carrier, the bidder shall quote the transportation or shipping charge in the eRSP system.

c. Transportation by Bidders’ Owned, Leased, or Rental Vehicle(s) (OLRV): If the bidder proposes to use the bidder’s OLRV, the bidder shall quote the transportation or shipping charge in the eRSP system.

22. Clean Water Act and Clean Air Act Procurement Prohibition: The bidder shall not procure goods, services, or materials from any entity, or otherwise utilize any facility for the construction of the project, if the entity or facility is listed on the United States Environmental Protection

Agency (USEPA) List of Violating Facilities.

The bidder shall comply with the provisions of Executive Order No.11738, 3 C.F.R. 799 (1973), Section 306 of the Clean Air Act 42 U.S.C. 7606 (1994) and Section 508 of the Clean Water Act 33

U.S.C. 1368 (1982).

23. Debarment and Suspension: The bidder and its subcontractors shall meet all debarment, suspension, ineligibility, and voluntary exclusion requirements pursuant to Executive Order

12549.

B1-11

a. Provisions for Debarment and Suspension:

(1) The bidder certifies, by submission of this bid, that it and its principals:

(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal agencies;

(b) Have not within a 3-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;

(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and

(d) Have not within a 3-year period preceding this bid had one or more public transactions (Federal, State, or local) terminated for cause or default.

(2) Where the bidder is unable to certify to any of the statements in this certification, the bidder shall attach an explanation to this proposal.

To comply with the provisions for Debarment and Suspension, the bidder shall complete, sign, and submit to the LADWP the “Certification Regarding Debarment, Suspension, Ineligibility and

Voluntary Exclusion” affidavit located on the “Vendor Checklist” page of the eRSP system.

24. Non-Collusion Affidavit: To comply with non-collusion provisions, the bidder shall complete, sign, and submit to the LADWP the “Non-Collusion Affidavit” located on the “Vendor Checklist” page of eRSP system.

25. American Iron and Steel Requirement: Bids for all applicable items are subject to the

Consolidated Appropriations Act of 2014 (Public Law 113-76) which includes an “American Iron and Steel (AIS)” requirement in Section 436 that requires Drinking Water State Revolving Loan

Fund (DWSRF) assistance recipients to use iron and steel products that are produced in the

United States for the construction, alteration, maintenance, or repair of a public water system or treatment works. The AIS requirement is specified in the article titled “American Iron and Steel

Requirement” in Division E2.

As part of their bid submittal to the LADWP, all bidders shall complete, sign, and submit the

“American Iron and Steel Certification” affidavit on the “Vendor Checklist” page of the eRSP system . Attach all necessary supporting documentation to demonstrate company’s efforts to provide AIS-compliant materials and determination of unavailability, as applicable. Failure to

B1-12 comply with this requirement will result in the bidder being deemed nonresponsive to these specifications.

26. Courtesy Review of Selected Mandatory Bidding Forms: In an effort to improve the

“responsiveness of bids” related to mandatory bidding forms listed on the vendor checklist page of the eRSP system, the LADWP will offer a courtesy review of such forms for completeness, accuracy, and required signatures before the bid closing date. Interested bidders may send completed and signed copies of the following forms via e-mail to ccsdocs@ladwp.com.

- Prohibited Contributors (Bidders) - CEC Form 55

The bidder shall NOT send documents other than copies of the mandatory bidding forms indicated above.

To allow sufficient time for a courtesy review of such documents and subsequent feedback to bidders, the e-mail for a courtesy review request shall be received by the LADWP no later than

48 hours (excluding weekends and holidays) before the bid closing date and time. Bidders are encouraged to take advantage of the LADWP’s courtesy review of the bidding forms indicated above as early in the bidding process as possible. When submitting forms to the LADWP for a courtesy review, the bidder shall enter the “IFB Number” and “Title of IFB” in the subject line of the e-mail. The bidder shall ultimately be responsible for the accuracy, completeness, and signature requirement(s) of all mandatory forms submitted with the bid.

All other questions, inquiries, or correspondence regarding this bid shall be conducted using the eRSP system’s “Question and Answer (Q&A)” functionality.

27. (Form W-9) - Request for Taxpayer Identification Number and Certification: The Internal

Revenue Service (IRS) requires that all service providers and goods and materials suppliers furnish a Taxpayer Identification Number (TIN) to the party that pays them. As a result, the bidder shall complete, sign, and submit a “Request for Taxpayer Identification Number and Certification

(Form W-9)” in Division C3. After bid closing and upon request by Supply Chain Services, the

“Request for Taxpayer Identification Number and Certification (Form W-9)” shall be emailed to the Utility Buyer within 5 business days in accordance with Subarticle 1c of Division B1. Any change in Form W-9 information including the legal name or address of the contractor will require a submittal of a new Form W-9.

28. Environmentally Preferred Products (EPP): It is the policy of the LADWP to make all attempts to procure sustainable products which include, but are not limited to, products with recycled content that minimize waste, conserve energy or water, and reduce the amount of toxics disposed or consumed.

As established in Ordinance No. 180751, Environmentally Preferable Products Purchasing

Program, a product is considered EPP if it has a lesser or reduced adverse impact on human health and the environment when compared with competing products and services serving the same purpose.

B1-13

In addition, a commodity is considered to be EPP if it reduces waste, is reusable or durable for multiple uses, contains recycled contents, is bio-based, is manufactured using renewable energy

(thus lowering the carbon-footprint), produces low volatile organic compounds (VOCs), has low toxicity, contains less packaging, or is Persistent Bio-Accumulative and Toxic (PBT) free when compared with competing products and services serving the same purpose. The comparisons may consider raw materials acquisition, production, manufacturing, distribution, reuse, operation, and disposal, including potential for reuse or ability of the product to be recycled.

An EPP shall have one or more of the following attributes:

a. Bio-based.

b. Bio-degradable.

c. Carcinogen-free.

d. Chlorofluorocarbon (CFC)-free.

e. Durable.

f. Energy Efficient.

g. Heavy metal-free (no lead, mercury, etc.).

h. Less Hazardous.

i. Low toxicity.

j. Low Volatile organic compounds (VOCs).

k. Minimizes Virgin Materials.

l. Made from rapidly renewable materials.

m. Persistent Bio-accumulative and Toxic (PBT) Free.

n. Recyclable or contains recycled Content.

o. Reduced Greenhouse Gas (GHG) Emissions.

p. Reduced Packaging.

q. Reusable.

r. Upgradeable.

s. Water-efficient.

B1-14

An EPP shall also focus on established governmental or other widely recognized and respected third-party authorities such as Energy Star, EPA Recycled Materials Advisory Notice (RMAN)

Purchasing Guidelines, Federal Electronic Product Environment Assessment Tool (EPEAT), US

Department of Agriculture, and others.

29. Build America Buy America: Bidder acknowledges that the Project is subject to federal requirements, including the Build America Buy America (BABA) provisions of Public Law 117-58

(the Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law

(BIL), signed into law on November 15, 2021). Specifically, the Bidder shall ensure that, as these terms are defined within and made applicable by Public Law 117-58:

a. All iron and steel used in the Project are produced in the United States. This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;

b. The manufactured products used in the Project are produced in the United States. This means the manufactured product was manufactured in the United States, and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and

c. The construction materials (defined in Subarticle 26c(1) below) used in the Project are produced in the United States. This means that all manufacturing processes for the construction material occurred in the United States.

(1) “Construction materials” includes an article, material, or supply – other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand or gravel; or aggregate binding agents or additives – that is or consist primarily of:

(a) Non-ferrous metals;

(b) Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);

(c) Glass (including optic glass);

(d) Lumber; or

(e) Drywall.

Bidder represents that it has consulted with its counsel with respect to the application of these federal provisions.

B1-15

As part of their bid submittal to LADWP, all bidders shall complete, sign, and submit the “Build

America Buy America Certification” affidavit located on the “Vendor Checklist” page of the eRSP system . Attach all necessary supporting documentation to demonstrate company’s efforts to provide BABA-compliant materials and determination of unavailability, as applicable. Failure to comply with this requirement will result in the bidder being deemed nonresponsive to the bid.

30. eRSP Training Session: The LADWP offers an online eRSP training session to provide prospective bidders detailed guidelines on the preparation of bids and uploading of required submittals on the eRSP system. Bidders may refer to the eRSP Welcome Screen for more information on these trainings.

31. Notice of Use of Former LADWP Employees: The bidder shall state whether the bidder will or will not use a former LADWP employee for the performance of this IFB if awarded a contract.

Also indicate whether any former LADWP employee is a principal of the bidder or any subcontractor of the bidder. For purposes of this disclosure, a principal shall mean a person who is an officer of, or owns at least 5% of, bidder or any subcontractor of bidder.

The bidder shall complete and submit the “Notice of Use of Former LADWP Employees” form located in Division C3.

32. Submittal of NSF/ANSI 61 and NSF 61 Annex G (NSF 372): After bid closing and upon request by Supply Chain Services, the bidder shall submit as part of their bid response in accordance with

Article 8 of Division C3, a scanned PDF copy of certification that their final product is third-party certified to the National Sanitation Foundation/American National Standards Institute Standard

61 (NSF/ANSI 61) and NSF 61 Annex G or NSF 372. NSF/ANSI 61 and NSF 61 Annex G or NSF 372 shall be for the welded steel pipe and appurtenances proposed to be furnished under this

Contract. Failure to provide certifications may result in “bid” being deemed non-responsive.

B2-1

PART B - DIVISION B2

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

1. Disadvantaged Business Enterprise (DBE) and Good Faith Effort (GFE) Requirements:

a. Definitions: For the purpose of this bidding opportunity the following definitions are provided:

(1) Disadvantaged Business Enterprise (DBE): Entities owned and/or controlled by socially and economically disadvantaged individuals as described by Title X of the

Clean Air Act Amendments of 1990 (42 U.S.C. 7601 note) (10 percent statute), and

Public Law 102–389 (42 U.S.C. 4370d) (8 percent statute), respectively; a Minority

Business Enterprise (MBE); a Women Business Enterprise (WBE); a Small Business

Enterprise (SBE); a Small Business in a Rural Area (SBRA); a Labor Surplus Area Firm

(LSAF); or a Historically Underutilized Business (HUB) Zone Small Business Concern or a concern under a successor program.

(2) Minority Business Enterprise (MBE): Entities that are at least 51% owned and/or controlled by a socially and economically disadvantaged individual as describe by Title

X of the Clean Air Act Amendments of 1990 (42 U.S.C. 7601 note), and Public Law 102–

389 (42 U.S.C. 4370d), respectively.

(3) Women Business Enterprise (WBE): Entities that are at least 51% owned and/or controlled by women.

(4) Other Business Enterprise (OBE): An OBE is any business enterprise that is not certified as DBE, MBE, or WBE.

b. General: All bidders shall make good faith efforts to reach out to DBEs, WBEs, MBEs, and OBEs. The Disadvantaged Business Enterprise (DBE) and Good Faith Effort provisions constitute a requirement of this contract regardless of the number or kind of subcontractors a bidder may ultimately retain. If a bidder ultimately elects to perform all work under the contract through the bidder's own resources, without employing any subcontractors, it is nevertheless required that the bidder make good faith efforts as specified in this Article.

c. Certifying DBE Firms: Certifications will be accepted from the following:

(1) The U.S. Environmental Protection Agency (USEPA).

(2) The Small Business Administration (SBA).

(3) The Department of Transportation’s State implemented DBE Certification

Program (with U.S. citizenship).

DIVISION B2 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

B2-2

(4) Tribal, State and Local governments.

(5) Independent private organizations certifications.

d. Fair Share Objectives: Bidders are advised that the following fair share objectives (MBE and WBE Participation Goals) have been established for this project. Fulfillment of the

Disadvantaged Business Enterprise requirement is based on documented completion of the

Good Faith Effort Requirements, not level of Disadvantaged Business Enterprise participation proposed/achieved.

PROCUREMENT CATEGORY

MINORITY BUSINESS

ENTERPRISE PARTICIPATION

GOALS

WOMEN’S BUSINESS

ENTERPRISE PARTICIPATION

GOALS

CONSTRUCTION 11% 4%

SUPPLIES 2% 1%

SERVICES 4% 2%

EQUIPMENT 2% 2%

e. Contract Provisions Relative to the Utilization of Disadvantaged Business Enterprises

(DBEs): Compliance with the requirements of this document and attachments satisfies the Disadvantaged Business Enterprise (DBE) requirements for this construction contract.

The LADWP advises potential bidders that this project is funded with federal loan or grant funds through the California Drinking Water State Revolving Fund, and, therefore federal

Di…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .