Specifications.pdf

PDF 4 MB Posted

Attached to
Replace Siding Federal contract opportunity
Solicitation number
140P6426Q0100
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This file is a Project Specifications document for a federal construction contract issued by the National Park Service for the replacement of exterior wood siding at the Officer in Charge Residence (Historic Structure 19) at Pictured Rocks National Lakeshore in Munising, Michigan.

The project involves removing and replacing approximately 1,606 square feet of deteriorated custom wood Dutch lap siding with new custom cedar Dutch lap siding that matches the existing profile. The contractor must provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to complete the work. Key scope elements include: removal and disposal of existing house wrap and vertical wood strips; installation of new Tyvek DrainWrap weather-resistive barrier; installation of nominal 1"x2" green treated lumber furring strips to achieve a 3/4" air gap; installation of CoraVent SV-5 Rainscreen Siding Vent or approved equal; removal and replacement of corner trim in smooth-planed cedar; refabrication and reinstallation of existing metal window cladding to integrate with the new house wrap system; replacement of rotted wooden handrails along front stairs; and application of two finish coats of Sherwin-Williams Emerald Rain Refresh exterior acrylic latex paint or approved equal to all cedar siding and trim. The contract period is 180 calendar days from the Notice to Proceed, with all supply lead times, material deliveries, and weather considerations to be incorporated into the contractor's project schedule. The structure is a designated historic property listed in the National Register of Historic Places, requiring all work to maintain historical integrity and requiring an archaeologist to oversee any ground disturbance. The contractor must follow all installation details specified in the technical drawings and Western Red Cedar Lumber Association installation guidelines provided in Appendix D, and submit shop drawings and photo elevations showing where each detail will occur prior to construction.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Siding, newest first.
File Type Posted
Sol_140P6426Q0100_Amd_0001.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet
DOL_Wage_Determination.pdf PDF
Sol_140P6426Q0100.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Div. 1 V. 2023-11-11 Page | 1

Pictured Rocks National Lakeshore N8391 Sand Point Road, Munising Mi, 49862

Replace Siding Grand Marais Officer in Charge Building

PMIS 328904

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

2026-03-13

Page | 2

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

DIVISION 07 – THERMAL and MOISTURE PROTECTION Section 07 46 00 Wood Siding Section 07 46 16 Aluminum Cladding

DIVISION 09 – FINISHES

Section 09 91 13 Exterior Painting

SITE PLAN – APPENDIX A

PHOTOGRAPHS – APPENDIX B

DRAWINGS – APPENDIX C

HOW TO INSTALL WESTERN RED CEDAR SIDING -APPENDIX D

Page | 3

SECTION 01 10 00

DIVISION 1 SHORT FORM GENERAL REQUIREMENTS

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: Built in the 1920s the Grand Marais Officer in Charge Residence replaced an existing "shack" that was previously on site. The Officer in Charge Residence also known as Historic Structure 19 or HS-19. HS-19 was built from standard U.S Naval plans commonly used as a Radio Station Building. HS-19 served as the officer in charge quarters until the mid 1980s when the adjacent Coast Guard Station closed. It was around this time that the buildings were handed off to the National Park Service. HS-19 has been utilized as employee housing ever since.

In 2001 the National Park Service removed existing siding that did not match what would have adorned the building during its period of historic significance. Custom wooden Dutch lap siding was reinstalled to match original designs. During install of new wooden lap siding strips of oriented strand board were installed in a vertical pattern to try and mitigate moisture issues behind siding by providing an air gap between the sheeting and the siding (photos of this install are located in appendices). Unfortunately, this may have ultimately ended up accelerating moisture issues. The current siding rotten from the inside out within 25 years. Following the siding install new windows were installed through the entirety of the building. Following the window project the windows were clad in metal to better protect them from the harsh element. This window cladding goes over the current siding and will likely need to be redone following the siding installation.

1.2 Work Covered by the Contract Documents:

A. Project Location: E22030 Coast Guard Point, Grand Marais Mi, 49839

B. Work consists of:

The Contractor shall provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to remove and replace the existing wood siding and associated building envelope components.

Work includes the removal and replacement of approximately 1,606 square feet of deteriorated custom wood dutch lap siding. New siding shall consist of custom cedar dutch lap siding that matches the existing profile. The Contractor shall verify the existing siding profile and, if necessary, identify a manufacturer capable of fabricating a custom knife to replicate the profile exactly.

All existing siding shall be removed and disposed of in accordance with applicable regulations. This work also includes removal and proper disposal of approximately 1,606 square feet of existing house wrap, as well as removal and disposal of vertical wood strips previously installed between the sheathing and siding.

Page | 4

Following removal, the Contractor shall furnish and install new house wrap (Tyvek DrainWrap or approved equal) and wood furring strips behind new cedar siding. Nominal 1”x2” green treat lumber will be used for furring strips to achieve a 3/4” air gap.

Contractor must follow all details labeled 1-6 in Appendix C of this document. The contractor will be required to submit shop drawings of these details and produce elevations of the building (or photo elevations) with notes where each detail will occur to ensure the proper installation of the new siding system. Provide insect screen at top and bottom of walls per details labeled 1-6 in in appendix C. Provide CoraVent SV-5 Rainscreen Siding Vent or approved equal.

All corner trim, including starter trim, inside corners, and outside corners, shall be removed and replaced with new smooth-planed cedar trim boards matching the existing size and appearance.

Existing metal window cladding removed during siding replacement shall be refabricated and reinstalled to match the original configuration, appearance, and color. Installation shall ensure proper integration with the new house wrap system to maintain a watertight assembly.

All new cedar siding and trim shall be primed on all sides and edges prior to installation.

After installation, all wood components on this contract shall receive two finish coats of Sherwin-Williams Emerald Rain Refresh exterior acrylic latex paint, or an approved equal, applied in accordance with manufacturer specifications.

Cedar siding boards will be continuous and shall not contain joints when they are avoidable in runs under 16’. Where joints are unavoidable or 16’ they shall be staggered and properly sealed. All end joint shall be primed prior to installation.

The Contractor will need to temporarily remove handrails and other building attachments to complete the work. Moulding at the soffit intersection shall be carefully removed and reused where possible. If damaged, it shall be replicated and reinstalled to match the existing condition exactly.

All soffit and facia will be painted to match existing color.

Rotted top wooden hand boards along the front stairs shall be replaced in kind, matching existing dimensions, materials, and profile.

The Contractor shall protect all adjacent building components and site features during construction and shall repair any damage caused by construction activities at no additional cost to the Government.

Upon completion, the Contractor shall remove all construction debris, clean the work area, and deliver a complete, properly functioning exterior siding and building envelope system.

Page | 5

Contractor must follow all installation instructions from Appendix D How to Install Western Red Cedar Siding provided by Western Red Cedar Lumber Association. The intent is that cedar available at a local lumber yard is appropriate for this project. Western Red cedar is not required as long as material provided meets grade #1 requirements. These installation instructions are applicable for all types of cedar.

C. All work will be performed under a single contract.

D. Period of performance: Work shall be completed within 180 calendar days of the start date provided on the Notice to Proceed.

a. Clarification: The Notice to Proceed will be issued with a period of performance that is all inclusive of supply lead times, material deliveries, decommissioning, installation, anticipated average weather days for location, final commissioning, and acceptance of completed work. The contractor will be expected to provide a project schedule with adequate critical path details to ensure all work is completed within the stated calendar days from issuance of the Notice to Proceed. If weather impacts project beyond typical average weather patterns, contractor shall provide documentation in request for additional days.

1.3 Existing Condition Protections:

A. Preservation of Historical and Archeological Fabric:

i. The Historic and Archeological Data Preservation Act of 1974 provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.

ii. IF, in connection with operations under this contract, the Contractor, subcontractors, or employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological remains or data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts not specifically noted within the contract. The Contractor shall immediately suspend all operations in the vicinity and continue work in other areas outside a 50 foot radius of discovery and notify the Contracting Officer immediately. When safe to do so, follow up in writing with photographs within 2 days, giving the location and nature of the findings. No objects of cultural resource value may be removed. Contracting Officer will contact other entities as required.

iii. Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with Changes clause.

iv. The Contractor will be responsible for protecting the cultural resources within and adjacent to the project area from damage. In addition, the Contractor will be liable for all damage to the cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or their representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.

Page | 6

v. The Contractor agrees to include this language within all subcontracts.

B. The structure involved in the work of this Contract is a designated historic structure listed in the National Register of Historic Places. Every precaution shall be taken by the Contractor to prevent damage to existing historical materials, structural components of the building and to the surrounding area. Should any damage be incurred as a result of the Contractor’s operations at the site, it shall be repaired, or the damaged materials replaced in kind by the Contractor to the satisfaction of the Contracting Officer at no additional expense to the Government.

C. Protection of Landscaping and Surrounding Structures: All Ground Disturbance at this project shall have oversite by an Owner provided Archeologist. Coordinate schedules as required. The Contractor shall take all necessary measures to provide protection for all trees, fencing, walks and other landscape features and surrounding structures near the work site as noted with the contract. Any such surrounding features damaged, scarred or broken as a result of the Contractor’s operations at the site outside of agreed upon documented extents, shall be treated, repaired or replaced in kind to the satisfaction of the Contracting Officer at no additional expense to the Government.

ITEM 2 – PROTECTING EXISTING UTILITIES

2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative

(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.

2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.

2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:

A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.

B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

https://www.nps.gov/piro/learn/management/suptcompendium.htm

Page | 7

A. Communications: Contractor shall provide the Contracting Officer and COR with methods of communications including land and/or cell phone numbers (note some areas of work have limited service coverage), email and in case of emergency 24-hour contact options for duration of time operations.

B. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

C. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

D. Public Use of Site: Contractor shall always conduct operations to ensure the least inconvenience to the public. Contractor will be working on a building that will currently be occupied as housing.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of

9am - 5pm, Monday through Friday, except when otherwise indicated. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.

The following Federal holidays are observed by the National Park Service:

New Year’s Day Inauguration Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

• Note: Any of the above holidays falling on a Saturday will be observed on the preceding

Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022

Page | 8

B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

C. Do Not disturb site outside of noted disturbance area, including earthwork, and clearing of vegetation, to:

1. 25 feet beyond constructed areas

Contractor shall provide appropriate matts for equipment on turf areas to reduce soil compaction. Contractor shall remediate soil compaction as directed to do so by the CO/COR.

D. Utilities

1. General: Cost or use charges for temporary facilities shall be included in the Contract

Sum as required.

2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.

3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.

4. Sanitary Operations:

a. Toilets: Contractor must provide toilets for contractor personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.

E. Security and Protection facilities:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.

Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

3. Vegetation and Wetland Protection: Coordinate with COR to construct protection fence at drip line of any vegetation or wetlands impacted within construction and grading limits. Any

Page | 9 damaged vegetation or wetlands are to be restored to original conditions via replacement at no additional expense to the Government. Protection fence to be a temporary barrier, meeting the following requirements: High-density plastic, extruded and stretched polyethylene fabric with 2 inch (50mm) maximum opening pattern, highly visible orange color, 48 inches (1220mm) high, supported by tubular or T-shape galvanized steel posts spaced not more than 96 inches (2440mm) apart. Coordinate with COR prior to ANY vegetation or wetland removals. Consult with COR for any unplanned removals required for vegetation that interferes with construction. Carefully supervise excavating, grading, filling, and other construction operations near vegetation to prevent damage.

4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.

5. Temporary Enclosures: Provide and maintain temporary enclosures such as snow fence as required for protection of construction in progress and from access by visitors or staff, other construction operations, and similar activities.

6. Hot Work Permit: Not Required

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage units shall be provided by the contractor and exact location within staging area shown in appendix A below may be discussed at the preconstruction briefing. All storage units provided by the contractor shall be in a clean and acceptable condition to the COR. Security of the materials and equipment on site is the Contractor’s responsibility.

3.5 Preservation of Natural Features: Care must be taken if utilizing man lifts man or equipment to not damage historic sidewalks that are located on three sides of this building.

3.6 Hauling Restrictions: Contractor shall verify and be responsible for the path accessing the site and obtaining / maintaining all local, state and federal permits/licenses associated with hauling/road requirements and dumping of materials associated with the project.

3.7 Waste Removal, Recycling, and General Housekeeping:

A. Keep project site in a neat, orderly, and safe condition at all times.

1. Contractor is responsible for providing dumpsters for waste and recycling and for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site.

Coordinate with COR for approved dumpster locations prior to commencing construction.

2. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters.

Page | 10

3. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to the extent possible during this project, recycling material as much as possible within local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.

4. For all waste and recycling removals offsite, contractors shall provide estimates and/or tickets to quantify material weights and report back to the park, submit to COR for review and record filing.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated. Contractor will maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR. Contractor will maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

B. New /Existing Buildings Unoccupied:

1. N/A

3.9 Photo Documentation:

A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted preferably electronically by email or optional via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

B. Existing Condition Images:

1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

C. Construction Progress Images:

1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)

Page | 11

2. Maintain organized index for photos with date, description, etc.

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

D. Completion Images:

1. Document all completed work within scope of work.

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

3.10 Fire and Life Safety:

A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.

B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.

C. Store and handle hazardous materials in accordance with manufacturers and OSHA

29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

1. Immediately report all spills of hazardous materials to the CO, COR, and park.

2. Maintain a spill emergency response kit.

3. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management

A. Contractor shall not have personal radios or other media sources and they shall not be broadcast within NPS property.

B. Noise Control: Perform operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or COR.

C. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

a) Do not exceed the following dB(A) limitations at 50 feet: 70 dB(A) More than 12 minutes in any hour, 80 dB(A) More than 3 minutes in any hour. 2. Maximum permissible construction equipment noise levels at 50 feet: Compressors 75 dB(A), Pneumatic Tools 80 dB(A), Pumps 75 dB(A), Saws 75 dB(A), Generators 75dB(A), Vibrators 75 dB(A) 3. Ambient Noise maximum noise levels (dB) for receiving noise area at property line shall be as follows. Residential receiving area: Daytime 65 dB Nighttime 45 dB. Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926

Page | 12

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.

Contractors will be accountable for understanding existing conditions. No cost changes for items visible during site visit will be allowed.

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, standards and organizations which may be used in/referred within the

Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.

7.2 Submittals:

A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:

1. Name and qualifications of responsible supervisor to carry out the program.

2. First aid and rescue procedures.

3. Training, both initial and continuing.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.

5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

6. Contractor to identify nearest location of medical facility for emergencies

7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.

8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute

"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by https://www.nps.gov/orgs/1671/do-business-with-us.htm

Page | 13 all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.

B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.

C. All PPE will be serviceable at all times. At a minimum, maintain 2 sets of PPE including hard hats and all other Accident Prevention Plan required equipment.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the local 911 Emergency Response, COR and or the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE

Page | 14

8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.

ITEM 9 - SUBMITTALS

9.1 General Contracting Submittal Procedures:

A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR

B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.

C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items are to be submitted prior to the Preconstruction Conference or as specified at the CO’s discretion. The timeline for the documents to be submitted will be addressed at the pre-construction conference for those items that were not received and approved prior. Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies if not resolved as directed.

Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention (Safety) Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Quality Control Plan.

9.2 Project Submittal Process (Shop Drawings, Product Data, and Samples): Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.

A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.

Page | 15

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. Samples: Submit 2 color samples 4” x 6” minimum in size for all product color selections.

Paint samples shall be actual paint finish drawdown for all project colors.

1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.

D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).

E. After approving submittals, Contracting Officer and/or COR will return one copy to the

Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: All brand names noted are subject to ‘or equal’ products. If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification. Contractor shall incorporate and be responsible for all collateral costs due to the or equal proposed as required to provide a complete project.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.

Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that General Contractor:

1. Has investigated and shall provide documentation in request showing that the proposed item is equal or superior in all respects to the salient characteristics specified.

2. Will meet or exceed warranties for the proposed item specified.

3. Has determined that the proposed item is compatible with interfacing items.

Page | 16

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the

Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.

9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.

Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.

ITEM 10 – TEMPORARY SERVICES

10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.

Page | 17

11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.

B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the

CO.

D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.

E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

F. Disposition of any permits and warranties required by the specifications in this section.

11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of

Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.

B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.

C. Information shall include operation and maintenance manuals for each warranted product.

ITEM 12 - DEFINITION OF CONTRACT LINE ITEMS

12.1 Summary

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut off points where one item ends, and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

Page | 18

12.2 List of Contract Line Items

A. Contract Line-Item No. 01 Replace siding and associated building envelope components

1. This item consists of . providing all labor, materials, equipment, supervision, transportation, and incidentals necessary to remove and replace the existing wood siding and associated building envelope components

2. Payment will be made per the contract and percentage of completion level.

END OF SECTION

Page | 19

SECTION 07 46 00

WOOD SIDING

1.1 RELATED SECTIONS

A. Section 01 74 21 – Construction/Demolition Waste Management and Disposal B. Section 06 10 53 – Miscellaneous Rough Carpentry C. Section 07 62 00 – Sheet Metal Flashing and Trim D. Section 07 92 00 – Joint Sealants

1.2 REFERENCES

A. Comply with the latest editions of the following:

1. American National Standards Institute (ANSI)

2. Western Wood Products Association – Standard Grading Rules for Western Lumber

3. National Lumber Grading Authority – Standard Grading Rules for Canadian Lumber

4. ASTM International – Fasteners, corrosion protection, and coatings

5. National Fire Protection Association – Applicable fire safety requirements

1.3 SUBMITTALS

A. Product Data: Manufacturer’s product literature for siding, trim, fasteners, sealants, coatings, and

WRB.

B. Samples:

1. Siding sample showing profile, finish, and grade characteristics.

2. Trim sample.

C. Installation Instructions: Manufacturer’s written instructions for siding and WRB system

D. Safety Data Sheets (SDS) for coatings and sealants.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in original, unopened packaging labeled with grade and moisture content.

B. Store siding off the ground (minimum 4 in / 100 mm), flat, well-drained, and protected from moisture and sunlight.

Page | 20

C. Allow siding to acclimate to site conditions before installation.

1.5 WARRANTY

A. Provide manufacturer’s standard warranty for coatings and materials.

B. Warranty Period: Minimum 10 years for coating performance against peeling, cracking, blistering, and loss of adhesion, commencing at Substantial Completion.

PART 2 – PRODUCTS

2.1 WOOD SIDING

A. Species: Western Red Cedar or approved equivalent suitable for exterior siding.

B. Profile: Dutch lap, custom milled to match existing profile.

C. Grade: No. 1 (Select Tight Knot) or better, in accordance with WWPA or NLGA grading rules.

D. Finish: Smooth-planed on exposed face.

E. Characteristics:

1. Free of loose knots, knot holes, splits, or decay.

2. Tight, sound knots permitted within grading rules.

3. Maximum moisture content 12 percent at installation.

F. Lengths: Maximum practical lengths to minimize joints.

G. Pre-finish:

1. Prime and paint all sides and edges prior to installation.

2. Apply two coats of high-quality exterior acrylic latex paint with self-cleaning properties.

3. Touch-up paint to match field-applied finish.

2.2 WEATHER-RESISTIVE BARRIER (WRB)

A. Material: Tyvek DrainWrap, or approved equal.

B. Description: Drainable, water-resistive barrier with an integrated, compression-resistant spacer mesh.

C. Installation:

1. Provide a continuous WRB behind all siding.

2. Horizontal installation with minimum 6-inch (150 mm) overlaps; stagger vertical joints.

Page | 21

3. Tape all seams per manufacturer instructions.

4. Maintain a minimum 1 mm drainage gap between WRB and siding to ensure proper moisture management.

D. Accessories: Flashing tape, fasteners, and accessories per manufacturer instructions.

2.3 TRIM AND ACCESSORIES

A. Material: Cedar, No. 1 grade or better, matching siding species and finish.

B. Components: Corner boards, starter strips, fascia, frieze boards, window and door trim.

C. Pre-finish: Prime and paint all sides and edges consistent with siding.

2.4 FASTENERS

A. Stainless steel or hot-dip galvanized, corrosion-resistant, compatible with cedar.

B. Split less ring shank siding nails with textured heads must be used for all fastening.

2.5 FLASHING

A. Concealed flashing: Minimum 26-gauge galvanized steel or approved corrosion-resistant metal.

B. Provide flashing at all openings, penetrations, and transitions.

2.6 SEALANTS

A. High-performance exterior sealant compatible with wood siding and paint.

B. Color shall match siding and appear flush prior to final top coat.

PART 3 – EXECUTION

3.1 EXAMINATION

A. Verify substrates are plumb, level, and suitable for siding installation.

B. Correct unsatisfactory conditions prior to installation.

Page | 22

3.2 PREPARATION

A. Install flashing at all openings and horizontal transitions.

1. B. Install WRB as continuous drainage plane:Stagger vertical laps.

2. Tape seams per manufacturer instructions.

C. Install furring/strapping at 16 or 24 inches on center to support siding.

D. Install starter strip at base of wall to set alignment.

E. Apply sealant around openings and penetrations.

3.3 INSTALLATION – SIDING AND TRIM

A. Install siding per manufacturer instructions for Dutch lap profile.

B. Ensure siding sheds water properly and maintains proper overlap.

C. Secure siding to wood substrate with corrosion-resistant fasteners.

D. Jointing: Stagger joints minimum 32 inches (800 mm); distribute evenly across walls.

E. Corners and Trim: Miter or butt joints as required; install trim and closures to match design intent.

F. Install insect screening at base of wall where required.

3.4 FINISHING

A. Exposed fasteners flush with surface; do not damage wood finish.

B. Touch up any blemishes to match existing color and sheen.

3.5 CLEANING

A. Remove all debris, excess materials, and equipment from site.

B. Leave areas clean, safe, and ready for use.

3.6 PROTECTION

A. Protect installed siding, trim, and adjacent components from construction damage.

Page | 23

B. Repair any damage caused by installation at no additional cost to the Government.

3.7 CLOSEOUT

A. Deliver a fully installed, primed, and painted cedar siding system integrated with WRB, ready for long-term performance.

Page | 24

SECTION 07 46 20

ALUMINUM WINDOW CLADDING

1.1 SECTION INCLUDES

A. Removal and proper disposal of existing aluminum window cladding and trim.

B. Fabrication and installation of new aluminum window cladding, trim, and accessories to integrate with new siding system.

C. Coordination with flashing, sealants, and weather-resistive barriers (WRB) for a watertight assembly.

1.2 RELATED SECTIONS

A. Section 07 46 00 – Wood Siding: Coordination for integration of window cladding with new siding and

WRB.

B. Section 07 62 00 – Sheet Metal Flashing and Trim: Interface flashing at windows.

C. Section 07 92 00 – Joint Sealants: Sealant application at window interfaces.

D. Section 06 10 00 – Rough Carpentry: Wood framing or furring supporting cladding.

E. Section 01 74 21 – Construction/Demolition Waste Management and Disposal: Proper disposal of removed cladding.

1.3 REFERENCES

A. ASTM International:

1. ASTM E84 – Surface Burning Characteristics of Building Materials

2. ASTM E136 – Behavior of Materials in a Vertical Tube Furnace at 750°C

B. AAMA – Aluminum Coatings and Performance:

1. AAMA 2604 – High-Performance Organic Coatings on Aluminum Extrusions and Panels

C. Aluminum Association Standards:

1. AA ASM 35 – Aluminum Sheet Metal Work in Building Construction

2. AA ADM 1 – Aluminum Design

D. Testing Standards:

1. TAS 202-94 – Impact and Non-Impact Resistant Components

2. TAS 203-94 – Cyclic Wind Pressure Testing

Page | 25

1.4 SUBMITTALS

A. Product Data: Manufacturer’s specifications for aluminum window cladding, trim, and finishes.

B. Shop Drawings: Show dimensions, profiles, joints, expansion allowances, anchorage, and interface with siding, flashing, and sealant.

C. Samples: Two samples, minimum 2 x 3 in (51 x 76 mm), representing color, finish, and texture.

D. Closeout Submittals: Manufacturer’s recommended maintenance and cleaning instructions.

1.5 QUALITY ASSURANCE

A. Mock-Up: Construct mock-up of typical window cladding assembly for review and approval prior to full installation.

B. Compliance: Fabrication and installation shall comply with AAMA 2604, ASTM standards, and manufacturer instructions.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Store cladding in manufacturer’s unopened packaging,…

This is the start of the file's text. The full file is on GovTribe.