Specifications.pdf

PDF 250 KB Posted

Attached to
Thermally Insulating Waveguide Federal contract opportunity
Solicitation number
NB6720102601964
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Requirements/Specification Document from the National Institute of Standards and Technology (NIST) Communications Technology Laboratory for the procurement of thermally insulating rectangular waveguides. NIST requires six units each of WR-10 thermally insulating waveguides (operating frequency range 75–110 GHz) and WR-6.5 thermally insulating waveguides (operating frequency range 110–170 GHz), with separately priced options for six units each of WR-4.3 (170–260 GHz) and WR-4.3 (220–330 GHz) waveguides. All waveguides must be new (not refurbished), feature IEEE 1785-2a Precision Dowel flanges, measure approximately 20 mm in length with a maximum length of 30 mm, and be manufactured from material with thermal conductivity less than 0.25 W·m⁻¹·K⁻¹. Contractors may optionally provide estimates for thermal resistance, maximum insertion loss, minimum return loss, and part-to-part variability; lower insertion loss, higher return loss, and higher thermal resistance are considered advantageous in proposal evaluation.

Delivery must be completed within 16 weeks of contract award to NIST-Boulder, Mail Stop 672.01, 325 Broadway, Boulder, Colorado 80305, with partial delivery acceptable. Acceptance is not expected to exceed 7 business days. Contractors must possess an Export Control Classification Number (ECCN) and an active Unique Entity Identification Number (UEI) registered on SAM.gov at the time of award. Base manufacturer warranty is acceptable. No installation, training, maintenance, calibration, government-furnished material, or travel requirements apply to this procurement.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: Thermally Insulating Waveguide

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Guided Wave Electromagnetics Group (672.01)

General Statement of Need:

The Communications Technology Laboratory (CTL) at the National Institute of Standards and Technology (NIST) enables science and industry by providing essential measurement methods, instrumentation, and standards to support all phases of communications technology development, from fundamental characterization and discovery to production.

To support research and measurement services in microwave power, the Radio Frequency Technology Division in CTL requires thermally insulating rectangular waveguides. The thermally insulating waveguides will be incorporated into power measurement systems at NIST. For this application, low electrical loss between the ports of the waveguide and high thermal resistance between the ports of the waveguide is advantageous. The equipment must be new (not refurbished or reconditioned).

Item Specifications and Quantities:

Item 1: WR-10 Thermally Insulating Waveguide Quantity: 6 EACH Specifications: 1.1 Rectangular waveguide apertures shall be designed for an operating frequency range of 75 GHz to 110 GHz, with a nominal width of 2540 µm and a nominal height of 1270 µm.

1.2 Waveguide flanges shall be consistent with the IEEE 1785-2a Precision Dowel interface from the IEEE 1785.2-2016 standard.

1.3 Item shall include a thermally insulating waveguide with a length of approximately 20 mm. The thermally insulating waveguide shall be made of material with a thermal conductivity of less than 0.25 W·m-1·K-1.

1.4 Maximum length shall be 30 mm.

1.5 The contractor may provide an estimate of the thermal

resistance of the item. Larger thermal resistance will be considered advantageous in evaluation of proposals.

1.6 The contractor may provide an estimate of the maximum

insertion loss of the item in the operating frequency range.

Lower maximum insertion loss will be considered advantageous in evaluation of proposals.

1.7 The contractor may provide an estimate of the minimum return loss of the item in the operating frequency range. Higher minimum return loss will be considered advantageous in evaluation of proposals.

1.8 The contractor may provide estimates of the part-to-part

variability of the mechanical dimensions, thermal resistance, maximum insertion loss, and minimum return loss. Lower part-to-part variability, especially for thermal resistance, will be considered advantageous in evaluation of proposals.

Item 2: WR-6.5 Thermally Insulating Waveguide

Specifications: 2.1 Shall follow the same specifications as Item 1, except that rectangular waveguide apertures shall be designed for an operating frequency range of 110 GHz to 170 GHz, with a nominal width of 1651 µm and a nominal height of 825.5 µm.

Separately Priced Options

Item 3: OPTION to PURCHASE: WR-4.3 Thermally Insulating Waveguide

Specifications: 3.1 Shall follow the same specifications as Item 1, except that rectangular waveguide apertures shall be designed for an operating frequency range of 170 GHz to 260 GHz, with a nominal width of 1092 µm and a nominal height of 546 µm.

Item 4: OPTION to PURCHASE: WR-3.4 Thermally Insulating Waveguide

Specifications: 4.1 Shall follow the same specifications as Item 1, except that rectangular waveguide apertures shall be designed for an operating frequency range of 220 GHz to 330 GHz, with a nominal width of 864 µm and a nominal height of 432 µm.

Vendor Requirements

1. Possess at time of award/contracting an Export Control Classification Number (ECCN).

2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).

Procurement Support Information and Ancillary Services:

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

Mail Stop: 672.01 325 Broadway Boulder, CO 80305

Shipping Criteria:

☒ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

16 weeks after contract award date ☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation

[Enter Details]

NOTE: TPOC shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V)

Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other

☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment ☒ N/A

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .