SPECIFICATIONS.pdf

PDF 662 KB Posted

Attached to
Replace 2 Boilers at Rock Rapids Garage
Solicitation number
645-RFB-2524-2026
Issued by
Linn County, Iowa

About this file

This is a Technical Specifications document prepared by the Iowa Department of Transportation (IDOT) for the Rock Rapids Boiler Replacement project (IDOT Project #BG-2R15(005)--80-60). The specifications detail the complete mechanical, HVAC, and electrical work required to replace two existing boilers at the Rock Rapids Maintenance Garage with a project start upon Notice to Proceed and completion targeted by September 30, 2026. The document encompasses Division 23 (Heating, Ventilating, and Air Conditioning) and Division 26 (Electrical) work, including hydronic piping systems, HVAC pumps, boiler installation, valves, hangers and supports, pipe insulation, testing and balancing, and system identification. The contractor must provide all labor, materials, equipment, hoisting facilities, and supervision necessary for fabrication, installation, startup, and testing of the complete mechanical installation, including demolition of existing equipment. All work must comply with applicable codes and standards including ASHRAE/IES 90.1-2010, ASME Boiler and Pressure Vessel Code, National Electrical Code, and local building and mechanical codes. The specifications were issued for construction on January 6, 2026, prepared under the direct supervision of Professional Engineers Brian Steffens (License #22014, renewal date 12-31-2027) and Edin Smailovic (License #21953, renewal date 12-31-2026).

The contractor must submit shop drawings and catalog data for all mechanical equipment prior to installation, obtain required permits and inspection certificates at their own expense, and guarantee all materials and equipment to be new and free from defects for one year following final acceptance. Materials must be protected from damage and stored indoors or weather-protected throughout the project. The contractor is responsible for coordinating with other trades, managing material and equipment substitutions through written approval only, and ensuring all equipment is properly sized, installed, and tested in accordance with manufacturer recommendations and industry standards. Special requirements include providing three copies of operating and maintenance manuals organized in bound books, submitting record drawings showing final piping and ductwork locations, conducting utility rebate application submissions, and demonstrating all system features and functions to the Owner with manufacturer representatives present. Testing and balancing must be performed by an independent certified contractor (AABC, NEBB, or SMARTA certified), with systems adjusted to within plus or minus 10 percent of design specifications. The contractor must ensure all identification signage and pipe markers comply with ANSI A13.1 standards and remain accessible for future maintenance and operation.

View the file

Other files

File Type Posted
A101_2017 sample.pdf PDF
1372264-event.pdf PDF
PLANS.pdf PDF
Pre-Bid Request for Approval of Products or Materials.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

FOR

IOWA DEPARTMENT OF TRANSPORTATION

ROCK RAPIDS BOILER REPLACEMENT

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

Signature Date

Printed or typed name: Brian Steffens

License Number: 22014

My license renewal date is: 12-31-2027

Pages, Sheets, or Divisions covered by this Seal:

Divisions 23

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

Signature Date

Printed or typed name: Edin Smailovic

License Number: 21953

My license renewal date is: 12-31-2026

Pages, Sheets, or Divisions covered by this Seal:

Divisions 26

PREPARED BY:

IDOT PROJECT #: BG-2R15(005)--80-60

SH PROJECT # 2250019210

01/09/2026

01/09/2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--80-60

Project # 2250019210

Issued for Construction 01-06-2026

Table of Contents

TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 0553 – Identification for HVAC Piping and Equipment

23 2113 – Hydronic Piping

23 2123 – Hydronic Pumps

23 2500 – HVAC Water Treatment

DIVISION 26 – ELECTRICAL

26 0505 – Selective Demolition for Electrical

26 0519 – Low-Voltage Electrical Power Conductors and Cables

26 0529 – Hangers and Supports for Electrical Systems

26 0533.13 – Conduit for Electrical Systems

26 0533.16 – Boxes for Electrical Systems

26 0553 – Identification for Electrical Systems

26 2416 – Panelboards

26 2726 – Wiring Devices

26 2816.16 – Enclose Switches

END OF SECTION

IDOT Project # BG-2R15(005)--80-

Project # 2250019210

Issued for Construction

01-06-2026

Common Work Results for HVAC

23 0500 - 1

SECTION 23 0500

COMMON WORK RESULTS FOR HVAC

PART 1 GENERAL

1.1 SECTION INCLUDES

A. The work shall include the furnishings of systems, equipment and materials specified in this Division and as called for on the Mechanical Drawings to include supervision, quality control, operation, methods and labor for the fabrication, installation, start-up and tests for the complete mechanical installation. The work shall also include the furnishing of necessary hoisting facilities to set materials and equipment in place and the furnishing of any scaffolding and transportation associated with this work.

B. Examine the project site and become familiar with existing conditions which will affect the work.

Review the drawings and specifications of other trades and take note of conditions to be created which will affect the work. All conditions shall be considered in the preparation of bids;

no additional compensation will be made on the behalf of this Contractor.

C. Provide labor necessary to demolish the existing mechanical system as shown on the drawings, as described in Part 3, Existing Conditions, or as required.

D. Where noted on the drawings or where called for in other sections of the specification, the Contractor for this division shall install equipment furnished by others, and shall make required service connections. Verify with the supplier of the equipment the requirements for the installation. This contractor shall be responsible for the removal and installation of railings, piping, ductwork, louvers, etc. as required to install new equipment. Coordinate shipping splits for all equipment provided by this contractor.

1.2 DAMAGE

A. The Contractor shall be responsible for damage to the work of other trades or to the building and its contents, caused by equipment installation.

1.3 PERMITS AND INSPECTIONS

A. Obtain and furnish necessary permits and inspection certificates for material and labor furnished. Permits and certificates shall be obtained from the proper inspection authorities. The cost of permits, certificates and fees required in connection with the installation shall be borne by the Contractor, unless otherwise noted in the detailed contractual description preceding these specifications. Where applications are required for the procuring of utility services to the building, see that such application is properly filed with the utility, and that information required for such an application is presented to the extent and in the form required by the utility company.

1.4 CODES AND STANDARDS

A. Applicable provisions of the following codes and standards are hereby imposed on a general basis for the mechanical work (in addition to specific applications specified by individual work sections of these specifications):

1. ASHRAE/IES 90.1 - 2010 Code for Energy Efficiency

2. ANSI Pressure Piping Standards (B31)

3. ASHRAE Safety Code for Mechanical Refrigeration (ANSI B9.1)

IDOT - Rock Rapids Boiler Replacement

IDOT Project # BG-2R15(005)--80-60

Project # 2250019210

Common Work Results for

HVAC

23 0500 - 2

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

4. AWWA Standards

5. ASME Boiler and Pressure Vessel Code and State Boiler Code

6. American Gas Association

7. AWS Standards for Welding

8. National Electrical Code

9. Local and/or State Plumbing, Mechanical and Building Codes

10. Occupational Safety and Health Act (OSHA)

11. International Energy Conservation Code 2012

12. International Plumbing Code

13. International Mechanical Code

14. NFPA Standards and Pamphlets

B. If any work indicated on the drawings or specified herein conflicts in any way with any of the rules and regulations of the above authorities, the Contractor shall notify the Architect/Engineer in writing 72 hours before bids are opened. In the event the Contractor fails to notify the Architect/Engineer and changes are required by said conflicts, the Contractor shall make such changes as are required without additional cost to this Owner.

C. Installations must be safe in every respect, and must not create a condition which will be harmful to building occupants; to operating, installing or testing personnel; to workmen; or to the public. The contractor for each installation shall be solely responsible for providing installations which will meet these conditions. If the Contractor believes that the installation will not be safe for all parties, report these beliefs in writing to the Architect/Engineer before any equipment is purchased or work is installed, giving recommendations. The Architect/Engineer will work out required changes and adjustments in contract price where adjustments are warranted.

1.5 DRAWINGS

A. A complete set of project documents shall be on the site at all times. Prior to installing any of the work, check the drawings for dimensions and see that the work does not interfere with clearance required for ceilings, beams, foundations, finished columns, pilasters, partitions and electrical equipment as shown on the drawings and details. After work is installed and it develops that interferences occur which have not been called to the Architect/Engineer's attention before the installation, the Contractor shall, at his own expense, make such changes in his work as directed by the Architect/Engineer.

B. The contract drawings for mechanical work are in part diagrammatic, intended to convey the scope of work and indicate general arrangement and approximate sizes and locations of equipment and materials. Where job conditions require reasonable changes in indicated locations and arrangement, the Contractor shall make such changes as directed by the Architect/Engineer, without additional cost to the Owner.

C. Because of the scale of the drawings, certain basic items such as pipe fittings, access panels, and sleeves may not be shown; but where such items are required by other sections of these specifications or where they are required by the nature of the work, they shall be furnished and installed. Rough-in dimensions and locations shall be verified with the supplier of equipment furnished by other trades, or by the Owner, prior to the time of roughing-in.

Project # 2250019210

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

Issued for Construction

01-06-2026

Common Work Results for

HVAC

23 0500 - 3

D. Equipment specification may not deal individually with minute items required such as components, parts, controls and devices which may be required to produce the equipment performance specified, or as required to meet the equipment warranties. Where such items are required, they shall be included by the supplier of the equipment, whether or not specifically called for.

E. The drawings and the specifications are cooperative and supplementary. It is the intent of both said drawings and specifications to cover all mechanical requirements in their entirety as nearly as possible. The Contractor shall closely check the drawings and specifications for any obvious errors or omissions and bring any such condition to the attention of the Architect/Engineer prior to the receipt of bids, in order to permit clarification by means of a mailed Addendum. If there is no question prior to the bid proposal date, the Architect/Engineer shall assume that the drawings and specifications are complete and correct and will expect the intent of said documents to be complied with, and the installation to be complete in all respects, according to said intent.

F. Locate equipment which must be serviced, operated or maintained in fully accessible positions.

Minor deviations from the contract drawings may be made to allow for better accessibility, but changes of magnitude, or which involve extra cost, shall not be made without prior approval.

Ample space shall be allowed for removal of parts that may require replacement or service in the future.

G. All valves, fire dampers, automatic dampers, smoke dampers, damper operators, reheat coils, etc. shall be accessible for maintenance purposes. Locate items carefully and coordinate with other trades so that each piece of equipment is accessible and functional. Items located above a non-accessible ceiling, chase, or soffit shall be accessible through an access door.

Coordinate location of access doors with the general contractor.

1.6 RESPONSIBILITY

A. The Contractor's responsibility shall not end with the installation and connecting of the various apparatus. It shall include the services of an experienced superintendent, who shall be constantly in charge of the work, together with the qualified journeymen, helpers and laborers required to properly unload, install, connect, adjust, start, operate and test the work involved, including equipment and materials furnished by other trades or by the Owner, until such time as the entire mechanical installation functions properly in every detail.

1.7 COORDINATION

A. Coordinate the work with other trades prior to installation.

B. No piping, ducts or equipment foreign to the electrical equipment or architectural appurtenances shall be run over the top of any electrical panels or electrical equipment, in accordance with NEC 110-16 and 384-4. This does not prohibit sprinkler protection for the installation.

C. The determination of quantities of material and equipment required shall be made from the drawings. Schedules on the drawings and in the specifications are completed as an aid, but where discrepancies arise, it shall be the Contractor's responsibility to provide the required quantity.

D. Where the specifications state that equipment shall be furnished, installed or provided, it shall be understood to mean this Contractor shall furnish and install completely, unless it is specifically stated that the equipment is to be furnished and installed by others.

Project # 2250019210

Common Work Results for

HVAC

23 0500 - 4

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

E. The Architect/Engineer reserves the right to determine space priority of the contractors in the event of interference between the piping and equipment of the various contractors. Conflicts between the drawings and specifications, or between requirements set forth for the various trades, shall be called to the attention of the Architect/Engineer. If clarification is not asked for prior to the taking of bids, it will be assumed that none is required, and that the Contractor has submitted his bid in conformance with plans and specifications as issued and that no interference exists.

1.8 GUARANTEE AND MAINTENANCE

A. Materials and equipment shall be guaranteed to be free from defects and to be new equipment; no secondhand, used or salvaged equipment will be allowed.

B. Keep the entire portion of the work in repair, without additional cost to the Owner, so far as defects in workmanship, apparatus, material or construction are concerned for one (1) year from the date of final acceptance, except as otherwise specified herein.

C. Equipment, which fails to meet performance ratings as specified and shown on the drawings, shall be removed and replaced by new equipment that meets the specified requirements, without additional cost to the Owner.

D. Materials and workmanship shall be subject to the review of the Architect/Engineer, in whose presence various tests shall be made as required by these specifications.

PART 2 PRODUCTS

2.1 SUBMITTAL PROCESS

A. Submit shop drawings and catalog data for mechanical equipment specified in Division 23 in accordance with Division 01.

B. Submittal data for mechanical equipment shall consist of shop drawings and/or catalog cuts showing technical data necessary to evaluate the material or equipment to include dimensions, wiring diagrams, performance curves, rating, control sequence, and other descriptive data necessary to describe fully the item proposed and its operating characteristics. Shop drawings shall be submitted on equipment and materials as required by the specifications.

C. Approval of materials, including alternate or substitute items, shall be obtained in writing from the Architect/Engineer, verbal approval will not be considered binding.

D. Shop drawings shall be submitted and shall have been signed, checked, approved, and initialed by the Contractor prior to submittal to the Architect/Engineer. The Architect/Engineer will review shop drawings to aid in interpreting the plans and specifications, and will in so doing assume that the shop drawings conform to specified requirements set forth in this specification.

The approval of the shop drawing by the Architect/Engineer does not relieve the Contractor of the responsibility of complying with elements of the specification. The name of the job, Architect/Engineer, location, and specification section shall appear on all pages of shop drawings. Equipment marks (such as EF-1, RTU-1) shall be indicated for each item.

E. At the completion of the job, furnish three (3) copies of parts lists, operating and maintenance instructions, and manuals organized and bound, in three books.

Project # 2250019210

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

Issued for Construction

01-06-2026

Common Work Results for

HVAC

23 0500 - 5

F. At the completion of the project, prepare and submit to the Owner record drawings showing the location of piping and ductwork. Drawing shall give accurate dimensions of such equipment for future use by the Owner. This drawing shall be submitted as soon as work is completed and before authorization of final payment.

2.2 SUBCONTRACTORS AND MATERIALS

A. Submit to the Architect/Engineer for review, when requested, a list of subcontractors, materials and equipment proposed to be used. The list must be reviewed by the Architect/Engineer before this Contractor may enter into any subcontractual agreement. Equipment, materials, and devices, etc. shall be subject to the review of the Architect/Engineer, whether or not said items are herein specified.

2.3 STANDARDS OF MATERIALS AND WORKMANSHIP

A. Materials shall be new, complete with manufacturer's guarantee or warranty, and shall be as listed by Underwriters Laboratories (UL), Inc., Air Movement and Control Association (AMCA), American Gas Association (AGA), Air Conditioning and Refrigeration Institute (ARI), etc., if a standard has been established by that agency for the type of material.

B. Materials shall also comply with applicable standards of the National Electrical Manufacturer's Association, National Board of Fire Underwriters, National Fire Protection Association, National Safety Council, National Bureau of Standards, the National Electrical Code and the Williams- Steiger Occupational Safety and Health Act of 1970. Such standards are hereby made a part of these specifications.

C. Work shall be performed by workmen skilled in the particular craft, shall be executed in a workmanlike manner, and shall present a neat mechanical appearance when completed.

Align, level and adjust equipment for satisfactory operation, and install so that connecting and disconnecting of piping and accessories can be made readily and so that parts are easily accessible for inspection, operation and maintenance. Methods and techniques of installation shall be subject to the review of the Architect/Engineer.

D. Materials shall be the standard product of a reputable manufacturer regularly engaged in the manufacture of the specific product. Materials of the same type of class shall be the products of one manufacturer. For example, fans shall be from the same manufacturer and pumps from the same manufacturer.

E. Materials shall be protected from damage, and stored indoors or protected from the weather at all times, unless other storage arrangements are approved by the Architect/Engineer.

F. Bearing lubrication fittings shall be as recommended by the manufacturer and shall be extended, where necessary, to an accessible location.

G. Material and equipment shall be installed in strict accordance with the manufacturer's recommendations.

2.4 MATERIAL SUBSTITUTIONS

A. Proposals as submitted shall be based on the products specifically named in the specification or on the drawings. Material or equipment by manufacturers other than those specified may be used only by permission of the Architect/Engineer. Such permission for substitution must be requested, in writing in accordance with Division 01.

Project # 2250019210

Common Work Results for

HVAC

23 0500 - 6

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

B. The Architect/Engineer reserves the sole right for the approval of proposed material or equipment, and the phrase, "or approved equivalent", used in these specifications, or on the drawings, shall be interpreted to mean an equivalent approved by the Architect/Engineer.

C. Changes required by alternate equipment shall be made at no additional cost to the Owner;

and costs incurred by other trades, public utilities or the Owner, as a result of the use of such equipment, shall be the responsibility of the Contractor.

D. Furnish to the Architect/Engineer, when requested, samples of proposed material or equipment substitutions. These samples shall remain with the Architect/Engineer as long as needed.

E. Identify the differences in alternate material or equipment as compared to that specified, and indicate the benefits to the project as a result of selecting the alternative.

F. The Architect/Engineer reserves the right to refuse approval of equipment which does not meet the specification, in their opinion, or of equipment for which no local experience of satisfactory service is available. The Architect/Engineer further reserves the right to reject equipment for which maintenance service and the availability of replacement parts is questionable.

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

A. Examine the existing buildings and grounds and become familiar with the conditions as they exist, or that will in any manner affect the work under this contract. No allowance will be made subsequently, in this connection, on behalf of the Contractor for any error or negligence by the Contractor.

B. Existing equipment, such as duct or pipe, in or on the existing building and grounds which is to be replaced, or which interferes in any way with the remodeling of the existing facilities and/or installation of new equipment, shall be removed from the premises or relocated by this Contractor, as directed by the Architect/Engineer. Do not remove from the premises, any equipment that may have maintenance value to the Owner without permission of the Owner.

Equipment, duct or pipe not to be reused shall be removed from the premises, unless otherwise noted herein or shown on the drawings.

C. Where existing equipment is removed or changed, all duct and pipe no longer in service shall be removed and stubs plugged as directed by the Architect/Engineer. Building surfaces damaged and openings left by removal of equipment shall be repaired by the proper trades and paid for by this Contractor, unless otherwise noted on the drawings. The cutting and fitting shall be done by this Contractor. The cutting of floor, ceiling or wall surfaces shall be done by this Contractor with extreme care, in order to avoid any disrupting or damage of existing utility services which may be encountered. Coordinate with other trades and with the General Contractor to minimize the damage to the building in order to reduce the amount of patching required.

D. Where new openings are cut and concealed piping is encountered, such items shall be removed or relocated as required. Where systems to be removed stub through floors, walls or ceilings, openings shall be patched so that no evidence of the former installation remains.

Project # 2250019210

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

Issued for Construction

01-06-2026

Common Work Results for

HVAC

23 0500 - 7

E. Existing active services (water, gas, sewer, electric), when encountered, shall be protected against damage. Do not prevent or disturb operation of active services that are to remain. If active services are encountered which require relocation, make request to authorities with jurisdiction for determination of procedures. Where existing services are to be abandoned, they shall be terminated in conformance with requirements of the utility or municipality having jurisdiction.

F. The location, size and elevation of underground utilities shown on the drawings are in accordance with data supplied by the Owner and/or the various utility companies. The Contractor shall verify this data and shall report any discrepancies to the Architect/Engineer before submitting his bid.

3.2 INTERRUPTION OF SERVICE

A. Changes in service shall be made so as to provide a minimum of interference with the operation of services in the building. When changes require shutdown of building services, notify the proper building authorities no less than 24 hours in advance and obtain approval from these authorities before making changes. Such notices shall give duration and nature of shutdown. Temporary arrangements shall be approved by the Architect/Engineer and/or Owner.

B. Any and all interruptions to building services shall be in accordance with Division 01.

3.3 OPENINGS, CUTTING, AND PATCHING

A. The General Contractor shall coordinate the placing of openings in the new structure, as required for the installation of the mechanical work.

B. Furnish to the General Contractor the accurate locations and sizes for required openings. This shall not relieve this Contractor of the responsibility of checking to assure that proper size openings are provided. When additional patching is required due to this Contractor's failure to inspect this work, this Contractor shall make arrangements for the patching required to properly close the opening, to include patch painting. This Contractor shall pay any additional cost incurred in this respect.

C. When cutting and patching of the structure is made necessary due to this Contractor's failure to install piping, ducts, sleeves or equipment on schedule, or due to this Contractor's failure to furnish, on schedule, the information required for the leaving of openings, it shall be this Contractor's responsibility to make arrangements for this cutting and patching. This Contractor shall pay any additional cost incurred in this respect.

D. Provide cutting and patching and patch painting in the existing structure, as required for the installation of the work. Furnish lintels and supports as required for openings. Cutting of structural support members will not be permitted without prior approval of the Architect/Engineer. Extent of cutting shall be minimized. Use core drills, power saws or other machines which will provide neat, minimum openings. Patching shall match adjacent materials and surfaces and shall be performed by craftsmen skilled in the respective craft required.

Project # 2250019210

Common Work Results for

HVAC

23 0500 - 8

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

3.4 CONCRETE AND MASONRY WORK

A. Concrete work included herein or shown on the drawings shall be done only by experienced cement finishers. Brickwork, where included, shall be laid only by experienced brick masons.

Brick shall be of uniform size, hard burned, and shall be laid in cement mortar, except for patch work at a location where cement and lime mortar has previously been used. Exposed, finish brickwork shall match existing brickwork as closely as practical and shall be to the satisfaction of the Architect/Engineer and Owner.

B. Concrete bases and pads for mechanical equipment will be furnished by General Contractor.

This Contractor shall coordinate size and location.

C. Concrete bases and pads for mechanical equipment shall be furnished by this Contractor.

Size bases to extend minimum of 4" beyond equipment base in any direction, and 4" above finished floor elevation. Construct of reinforced concrete, roughen floor slab beneath base for bond, and provide steel rod anchors between floor and base. Locate anchor bolts using equipment manufacturer's templates. Chamfer top and edge corners.

D. Furnish equipment anchor bolts and be responsible for their proper installation and accurate location.

3.5 ROOF OPENINGS

A. Roof openings required by this Contractor that are not shown on the Structural or Architectural Drawings shall be cut and (if necessary) reinforced by an experienced roofing contractor.

B. Roof penetrations for duct and piping shall be through curbed roof openings. Equipment supports shall be by curbed and flashed runners meeting current National Roofing Contractor Association (NRCA) standards and details. Pitch pockets, pitch pans, and wood blocking are not acceptable.

C. All roof work shall be completed such that it does not void any existing roof warranty.

3.6 PAINTING

A. The finish of any item that has been marred, scratched or damaged in any way by this Contractor shall be repainted at the expense of this Contractor, and to the satisfaction of the Architect/Engineer and the Owner.

B. Painting and finishing of exposed mechanical systems including piping and duct shall be as shown on the drawings and in DIVISION 09 - FINISHES.

3.7 CLEANING

A. Keep the premises clean of all debris, caused by the work as described in DIVISION 01.

B. At the conclusion of the construction, the site shall be thoroughly cleaned of all rubble, debris and unused material and shall be left in good order. Closed off spaces shall be cleaned of waste such as material, cartons, and wood frame members used in the construction.

Project # 2250019210

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

Issued for Construction

01-06-2026

Common Work Results for

HVAC

23 0500 - 9

3.8 SUSPENSION FROM WOOD STRUCTURAL MEMBERS

A. In general, concentrated or other loads shall not be suspended directly from the bottom of wood structural members, unless approved by the Architect/Engineer. Loads suspended from open web joists or trusses may be transferred to the bottom chord of the structural member at the panel points. Loads suspended from solid web joists shall be transferred to the joists only through the top flange or web. Suspension systems shall be reviewed by the Architect/Engineer.

3.9 WIRING FOR MECHANICAL EQUIPMENT

A. The electrical contractor will provide power to and connection of motors and equipment furnished by this Contractor. Where disconnect switches are not specified to be furnished with the equipment, the electrical Contractor will furnish disconnect switches for equipment furnished by this Contractor.

B. Provide integral wiring, alarm wiring, control wiring, temperature control wiring and interlock wiring for equipment furnished, whether or not such wiring is furnished by the equipment vendor.

C. Except where other Sections call for starters to be furnished by manufacturers as part of their equipment, the electrical contractor will furnish motor starters for motors furnished by this Contractor.

D. Furnish to the electrical contractor, shop drawings and a schedule for motors and other mechanical equipment furnished, which require electrical services. The schedule shall include the locations for rough-ins, electrical loads, size, and electrical characteristics for services required.

E. Additional costs incurred, where motors or equipment furnished by this Contractor require larger services or services of different electrical characteristics than those called for on the Electrical Drawings, due to the Contractor furnishing substitute equipment, shall be paid for by this Contractor.

F. Review the Electrical Drawings and call to the attention of the Architect/Engineer, prior to bidding, omissions of electrical services required for equipment.

G. Mechanical equipment which requires fuse protection, to maintain UL listing, shall be coordinated with the electrical contractor to provide such protection.

3.10 MOTORS

A. TEFC and ODP motors for equipment supplied by this contractor shall meet or exceed the listed values when tested in accordance with IEEE Standard 112 Method B as defined by NEMA Standard MG 1-12.6C. Efficiency values listed are based on NEMA Premium Efficiency Motors of NEMA MG 1-2003, Table 12-12 at 1800 RPM:

HP ODP TEFC

1 85.5 85.5

1.5 86.5 86.5

2 86.5 86.5

3 89.5 89.5

5 89.5 89.5

7.5 91.0 91.7

Project # 2250019210

Common Work Results for

HVAC

23 0500 - 10

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

10 91.7 91.7

15 93.0 92.4

20 93.0 93.0

25 93.6 93.6

30 94.1 93.6

40 94.1 94.1

50 94.5 94.5

60 95.0 95.0

75 95.0 95.4

100 95.4 95.4

125 95.4 95.4

150 95.8 95.0

200 95.8 95.0

B. All motors that are indicated to be used with Variable Frequency Drives (VFDs) shall be inverter duty rated and contain shaft grounding kits. Coordinate all motor requirements with the electrical contractor.

3.11 PROTECTION

A. Special care shall be taken for the protection of equipment furnished by this Contractor.

Equipment and material shall be protected from elements such as weather, painting and plastering until the project is completed. Damage from rust, paint or scratches shall be repaired as required to restore equipment to original condition.

B. Protection of equipment during the plastering and painting of the building shall be the responsibility of the contractor performing that work, but this shall not relieve this Contractor of the responsibility of checking to assure that adequate protection is being provided.

C. Where the installation or connection of equipment requires this Contractor to work in areas previously finished by other contractors, this Contractor shall be responsible that such areas are protected and are not marred, soiled or otherwise damaged during the course of such work. This Contractor shall arrange with the other contractors for repairing and refinishing of such areas which may be damaged.

D. When heavy materials must be placed upon or transported over the roof deck, sheeting shall be placed to distribute the weight and support such materials. Any damage shall be immediately corrected at no cost to the Owner.

3.12 ASBESTOS IDENTIFICATION AND CONTROL

A. In the event that suspected asbestos containing material (ACM) is encountered during the course of the work, cease operations in the immediate area and promptly notify the Architect/Engineer. Suspected materials will then be sampled and analyzed by the Owner.

Should ACM be identified, the Owner's Representative will direct the procedures for abatement, either by subcontract to the Contractor or separate contractor. During abatement operations, cease operations in the immediate area of the abatement. Operations in other areas of the project may be performed, but care must be taken to control dust to avoid contamination of the abatement containment or air monitoring samples. The Contractor shall coordinate activities with the asbestos abatement contractor.

Project # 2250019210

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

Issued for Construction

01-06-2026

Common Work Results for

HVAC

23 0500 - 11

B. Should no ACM be identified, operations may be resumed. Delays caused by identification, analysis or abatement may be added to the time of the contract, at the discretion of the Architect/Engineer by Change Order.

3.13 NOISE AND VIBRATION

A. Be responsible for the installation of all equipment in such a manner as to control the transmission of noise and vibration from any installed equipment or system, so that the sound level does not exceed NC35 in any occupied space. Be responsible for the correction of any objectionable noise in any occupied area due to improperly installed equipment.

3.14 TESTS AND DEMONSTRATIONS

A. Systems shall be tested and placed in proper working order prior to demonstrating systems to the Owner.

B. Prior to acceptance of the mechanical installation, demonstrate to the Owner or his designated representatives essential features and functions of all systems installed, and instruct the Owner in the proper operation and maintenance of such systems.

C. Furnish the necessary trained personnel to perform the demonstrations and instructions, and arrange to have the manufacturer's representatives for the system present to assist with the demonstrations. The Owner and Contractor shall each sign a certification stating that the training has been performed and the Owner accepts same.

3.15 UTILITY REBATE APPLICATIONS

A. This contractor shall be responsible for gathering information necessary for completing local utility rebate applications, and submitting to the proper utility companies for gas and electric rebates. Potential rebates include high efficiency gas boilers, thermostats, timeclocks, motors, and other items furnished by this mechanical contractor.

END OF SECTION 23 0500

This page intentionally left blank

IDOT Project # BG-2R15(005)--80-

Project # 2250019210

Issued for Construction

01-06-2026

Meters and Gauges for HVAC

Piping

23 0519 - 1

SECTION 23 0519

METERS AND GAUGES FOR HVAC PIPING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Provide equipment, materials, labor, and supervision necessary to install thermometers and gauges.

1.2 QUALIFICATIONS

A. Thermometers: Weiss, Weksler, Ashcroft, Reotemp, U.S. Gauge or Therice.

B. Gauges: Weiss, Weksler, Ashcroft, McDaniel, U.S. Gauge or Therice.

1.3 SUBMITTALS

A. Submit manufacturer's product and installation data.

PART 2 PRODUCTS

2.1 THERMOMETERS

A. 9 in. "Adjust-Angle" industrial thermometer, complete with double thick glass front, non-toxic blue ribbon liquid, separable socket and arranged so the unit can be set at any required angle front to back or left to right during or after installation. Range 32° F - 240° F for hot water, 50° F - 400° F for steam, and 0° F - 100° F for chilled water.

2.2 GAUGES

A. 4 in. compound pressure vacuum gauge, liquid filled, aluminum, steel or stainless steel case, white dial, 1/4-in. male NPT. Range 30 in. vacuum to 100 pound pressure for water, 30 in.

vacuum to 30 pound pressure for low pressure steam, 30 in. vacuum to 1-1/2 times system pressure for medium and high pressure steam. Provide siphon (pigtail) for steam gauges.

Provide level handle union cock for steam and water gauges.

2.3 THERMOMETER WELLS

A. Provide thermometer wells constructed of brass or stainless steel, pressure rated to match piping system design pressure. Provide 2" extension for insulated piping. Provide cap nut with chain fastened permanently to thermometer well.

B. Manufacturer: Same as thermometers.

PART 3 EXECUTION

3.1 INSTALLATION

A. Install thermometers in discharge and return piping at boilers, convertors, heat exchangers and chillers, at each supply and return connection for large heating and cooling coils and at other points as shown on the Drawings.

Project # 2250019210

Meters and Gauges for HVAC

Piping

23 0519 - 2

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

B. Install gauge for each pump, mounted on 1/4 in. galvanized steel pipe manifold connected to the suction and discharge of the pump, with 1/4 turn ball valves in the manifold on each side of the gauge, so that the gauge may be opened to either the suction or discharge pressure.

C. Install gauges on chiller, boiler, and convertor headers, at pressure reducing valves and at other points as shown on the Drawings.

END OF SECTION 23 0519

IDOT Project # BG-2R15(005)--80-

Project # 2250019210

Issued for Construction

01-06-2026

GENERAL DUTY VALVES FOR

HVAC PIPING

23 0523 - 1

SECTION 23 0523

GENERAL DUTY VALVES FOR HVAC PIPING

PART 1 GENERAL

1.1 SECTION INCLUDES:

A. Provide equipment, materials, labor, and supervision necessary to install valves as indicated on drawings and in schedules, and herein specified.

B. As nearly as possible, all valves shall be of a single manufacturer.

1.2 SUBMITTALS

A. Submit detailed Product Data clearly indicating manufacturer, model, size, dimensions and pressure rating.

1.3 PACKAGING

A. Valves shall be furnished or provided with protective packaging to prevent damage during shipping or on the job site.

B. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect threads, flange faces, grooves, and weld ends.

3. Set angle, and globe valves closed to prevent rattling.

4. Set ball and plug valves open to minimize exposure of functional surfaces.

5. Set butterfly valves closed or slightly open.

6. Block check valves in either closed or open position.

C. Use the following precautions during storage:

1. Maintain valve end protection.

2. Store valves indoors and maintain at higher than ambient dew point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

D. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

1.4 DEFINITIONS

A. CWP: Cold working pressure.

B. EPDM: Ethylene propylene copolymer rubber.

C. NBR: Acrylonitrile-butadiene, Buna-N, or nitrile rubber.

D. PTFE: Polytetrafluoroethylene plastic.

E. SSP - Saturated Steam Pressure

F. WP - Working Pressure

G. SWP - Steam Working Pressure

Project # 2250019210

GENERAL DUTY VALVES FOR

HVAC PIPING

23 0523 - 2

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

H. W.O.G. - Water, Oil, Gas Pressure

I. BR - Bronze

J. I.B.B.M. - Iron Body, Bronze-Mounted

K. O.S.&Y. - Outside Screw and Yoke

L. N.R.S. - Non-Rising Stem

M. R.S. - Rising Stem

N. M.S.S. - Manufacturer's Standardization Society of the Valve and Fitting Industry, Inc.

O. Lead Free: Refers to the wetted surface of pipe, fittings and fixtures in potable water systems that have a weighted average lead content =0.25% per Safe Drinking Water Act as amended January 4, 2011, Section 1417.

PART 2 PRODUCTS

2.1 GENERAL

A. Materials: Discs, gaskets, packings, seats, diaphragms and lubricants shall conform to recommendations of the valve manufacturer for the intended use.

B. Body materials, unless otherwise stated:

1. Bronze: 125-150 lbs., ASTM B62

2. High Grade Steam-Metal or Valve-Bronze Alloy: 200-300 lbs., ASTM B61

3. Cast Iron: ASTM A126, Class B

4. Ductile Iron: ASTM A395, A536

5. Cast Steel: ASTM A216

C. Bronze Valves: NPS 2 (DN 50) and smaller with threaded or solder ends, unless otherwise indicated.

D. Ferrous Valves: NPS 2-1/2 (DN 65) and larger with flanged ends, unless otherwise indicated.

E. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

F. Valve Sizes: Same as upstream piping unless otherwise indicated.

G. Valve-End Connections:

1. Flanged: With flanges according to ASME B16.1 for iron valves.

2. Grooved: With grooves according to AWAA C606.

3. Solder Joint: With sockets according to ASME B16.18.

4. Threaded: With threads according to ASME B1.20.1.

5. Copper Press: With ockets according to ASME B16.22/ASTM B75

H. Valves in Insulated Piping: With stem extensions (coordinate lengths with specified insulation requirements) and the following features:

Project # 2250019210

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

Issued for Construction

01-06-2026

GENERAL DUTY VALVES FOR

HVAC PIPING

23 0523 - 3

1. Ball Valves: With extended operating handle of non-thermal-conductive material that meets UL 2043 approved for inside air plenum, and protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation and memory stops that are fully adjustable after insulation is applied.

2. Butterfly Valves: Shall have extended neck for insulation clearance.

3. Gate Valves: With rising stem.

2.2 MANUFACTURERS

A. Subject to compliance with requirements, provide products manufactured by one of the following, as listed for each valve type, or Engineer-approved equivalent.

Valve Type Approved Manufacturer

Check Valves

Crane, Stockham, Lunkenheimer, Hammond Industrial Series, NIBCO, Milwaukee

Ball Valves Jamesbury, Apollo, Jenkins, Milwaukee, Watts, Worchester, Powell, or NIBCO

2.3 CHECK VALVES

A. Provide check valves complying with MSS SP-71 or MSS SP-80 for water, steam, and air shall be as follows unless otherwise shown on the drawings:

1. 3 in. and smaller: 200-lb. saturated steam, swing type, threaded, bronze body meeting ASTM B62, pressure tight removable disc, hinge bumper to prevent sticking open, can be mounted horizontally or vertically.

2. Non-slam type for pump discharge duty � 2-1/2 in. and larger: I.B.B.M., flanged, class 300, wafer style.

B. Swing Check Valves

1. Class 125, Iron Swing Check Valves with Metal Seats

a. Description:

1) Standard: MSS SP-71, Type I.

2) CWP Rating: 200 psig.

3) Body Design: Clear or full waterway.

4) Body Material: ASTM A 125, gray iron.

5) Ends: Flanged

6) Trim: Stainless steel or Silicon bronze (ASTM Listed), corrosion resistant

7) Gasket: Asbestos free.

C. Center-Guided Check Valves (Pump Discharge)

1. Class 125, Iron, Globe, Center-Guided Check Valves with Resilient Seat:

a. Description:

1) Standard: MSS SP-125, FCI 74-1, and MIL-V-18436F.

2) CWP Rating: 200 psig (1380 kPa).

3) Body Material: Silicon bronze (ASTM Listed), corrosion resistant

Project # 2250019210

GENERAL DUTY VALVES FOR

HVAC PIPING

23 0523 - 4

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

4) Style: Globe or wafer, spring loaded.

5) Ends: Flanged or wafer.

6) Seat: Silicon bronze.

2.4 BALL VALVES

A. Provide ball valves complying with MSS SP-72 or MSS SP-110. Ball valves shall be as follows unless otherwise indicated on the drawings.

1. 2 in. and smaller: ASTM B584 bronze body, 2-piece, full port stainless steel ball, screwed or soldered ends with teflon seats and seals, blow out proof stem, tee or lever handle rated to 150 SWP/600WOG.

2. Over 2 in.: ASTM A2116 carbon semi-steel or ASTM A536 ductile iron body, 2-piece, full port stainless steel ball, ANSI rated flanged ends with teflon seats and lever handle rated to 150 SWP/600WOG.

2.5 DRAIN VALVES (HOSE BIBBS)

A. Soldered or Threaded Ends: Bronze body, screwed bonnet, rising stem, composition disc, 3/4

in. threaded hose outlet connection; 125 psi maximum pressure rating.

2.6 ACTUATORS, HANDWHEELS, OPERATORS, HANDLES, AND WRENCHES

A. Valve Actuator Types:

1. Hand lever: For quarter-turn valves NPS 4 (DN 150) and smaller.

PART 3 EXECUTION

3.1 VALVE LOCATIONS � GENERAL

A. Unless otherwise noted, shutoff valves shall be provided at all equipment connections (supply and return where applicable) for the following piping: pump suction and discharge, water, air, fuel and gas and drain lines (except on gravity drains from pans). Equipment connections include such items as tanks, pumps, heat exchangers, and similar items.

B. Check valves of the non-slam type shall be installed at the discharge of pumps unless otherwise shown on the drawings.

C. Install isolation valves at each branch off of horizontal mains and vertical risers.

3.2 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent this movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

Project # 2250019210

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

Issued for Construction

01-06-2026

GENERAL DUTY VALVES FOR

HVAC PIPING

23 0523 - 5

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Do not attempt to repair defective valves; replace with new valves.

3.3 VALVE INSTALLATION

A. Follow the manufacturer's recommended installation instructions concerning soldering, silver brazing, welding, threading, and installation of flanged valves in order to prevent damage to the valve and assure its maximum efficiency. Additional specific installation requirements are as follows:

1. Thread pipe for threaded valves to standard length only, using new block dies.

2. Put pipe compound on the pipe end, not into the valve threads. Securely screw pipe and valve together.

3. Blow out or otherwise thoroughly clean pipe sections before they are installed.

4. Close valve before installation.

5. Secure and adjust valves for no leaks and for easy operation.

6. Install valves with stems horizontal or vertical above the pipe and square with building construction. Install valves in position to allow full stem movement.

7. Install valves so piping does not place a stress or strain on the valve body. Locate valves for easy access and provide separate support where necessary.

8. Install extended-stem valves where insulation is indicated. Stems shall be extended such that the handle moves freely without contact with the insulation.

9. Install drain valves at low points of piping, at each mechanical equipment item, and elsewhere, where indicated.

10. Locate valves, cock, and hose bibbs to allow easy accessibility for operation, maintenance and repair.

B. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

C. Install check valves for proper direction of flow and as follows:

1. Swing Check Valves: In horizontal position with hinge pin level.

2. Lift Check Valves: With stem upright and plumb.

D. When soldering use paste fluxes that are approved by the manufacturer for use with Lead Free Alloys.

3.4 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.5 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. Drawings indicate valve types to be used. If valve applications are not indicated, use the following:

Project # 2250019210

GENERAL DUTY VALVES FOR

HVAC PIPING

23 0523 - 6

Issued for Construction

01-06-2026

IDOT - Rock Rapids Boiler

Replacement

IDOT Project # BG-2R15(005)--

80-60

Project # 2250019210

1. Shutoff Service: Ball valves.

a. Piping NPS 2 (DN 50) and smaller: Furnish bronze ball valves.

2. Throttling - Balancing Service: Ball valves.

a. Piping NPS 2 (DN 50) and smaller: Furnish bronze ball.

3. Drain Duty: Hose-end drain valves.

4. Cast-iron, grooved-end valves may be used with grooved-end piping.

B. Install shutoff valve close to water main on each branch and riser serving plumbing fixtures or equipment, on each water supply to equipment, and on each water supply to plumbing fixtures that do not have supply stops.

C. Install drain valves for equipment at base of each water riser, at low points in horizontal piping, and where required to drain water piping.

1. Install hose-end drain valves at low points in water mains, risers, and branches.

2. Install stop-and-waste drain valves where indicated.

D. If valves with specified CWP ratings are not available, the same types of valves with CWP ratings may be substituted.

E. Select valves, except wafer types, with the following end connections:

1. For Copper Tubing, NPS 2 (DN 50) and Smaller: Threaded, Sweat solder, or Press-to-fit ends.

2. For Copper Tubing, NPS 2-1/2 to NPS 4 (DN 65 to DN 100): Grooved Mechanical Coupling, Flanged, or Threaded ends.

3. For Steel Piping, NPS 2 (DN 50) and Smaller: Threaded or Welded ends.

4. For Steel Piping, NPS 2-1/2 to NPS 4 (DN 65 to DN 100): Grooved Mechanical Coupling, Welded, or Flanged ends.

END OF SECTION

IDOT Project # BG-2R15(005)--80-

Project # 2250019210

Issued for Construction

01-06-2026

Hangers and Supports for HVAC

Piping and Equipment

23 0529 - 1

SECTION 23 0529

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Provide equipment, materials, labor and supervision necessary to install pipe hangers and supports.

B. Pipe support systems shall secure pipes in place, prevent pipe…