This Requirements/Specification Document details NIST's requirement for specialized on-wafer probes for the RF Technology Division's High Frequency Electronics Group. The procurement seeks 10 total probes across four specific categories: 3x 1.0 mm Coaxial Probes (DC to 110 GHz), 3x WR6.5 Waveguide Probes (110-170 GHz), 3x WR5.1 Waveguide Probes (140-220 GHz), and 1x WR4.3 Waveguide Probes (170-260 GHz). Each probe type must have a 50 um GSG tip configuration, integrate a bias tee, have maximum 2.0 dB insertion loss, and a short body type.
Key procurement details include delivery to NIST-Boulder within 6 weeks after order release, on-site acceptance expected to take 3 weeks, and a standard 1-year manufacturer's warranty covering labor and parts. The probes are required for two specific projects: a CRADA calibration study and load-pull measurements for the High-Frequency Electronics Project, CHIPS, and DARPA ELGAR. This is a sources sought announcement to identify potential vendors, with a potential small business set-aside if at least two qualified small businesses can meet the technical specifications.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: On-Wafer Probes
Requesting Laboratory / Division / Group:
Communications Technology Laboratory RF Technology Division High Frequency Electronics Group 672.03
General Statement of Need:
The RF Technology Division is seeking on-wafer probes in the millimeter-wave frequency bands. This solution is required for 1) on-wafer calibration study as part of a CRADA and 2) load-pull measurements up to 220 GHz to meet deliverables for High-Frequency Electronics Project, CHIPS, and DARPA ELGAR.
Item Specifications and Quantities:
Item 1: 1.0 mm Coaxial Probes Quantity: 3 Specifications: 1.1 Must operate from DC to 110 GHz, have a 50 um GSG tip configuration, have a maximum of 2.0 dB insertion loss.
Item 2: WR6.5 Waveguide Probes Quantity: 3 Specifications: 2.1 Must operate in the WR6.5 band from 110 GHz to 170 GHz, have a 50 um GSG tip configuration, integrate a bias tee, have a maximum of 2.0 dB insertion loss, body type short
Item 3: WR5.1 Waveguide Probes Quantity: 3 Specifications: 3.1 Must operate in the WR5.1 band from 140 GHz to 220 GHz, have a 50 um GSG tip configuration, integrate a bias tee, have a maximum of 2.0 dB insertion loss, body type short
Item 4: WR4.3 Waveguide Probes Quantity: 1 Specifications: 4.1 Must operate in the WR4.3 band from 170 GHz to 260 GHz, have a 50 um GSG tip configuration, integrate a bias tee, have a maximum of 2.0 dB insertion loss, body type short
Procurement Support Information and Ancillary Services:
Section Requirements/Specifications
Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
ATTN: Jeff Jargon Mail Stop: 672.06 325 Broadway Boulder, CO 80305
Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☒ Delivery Shall Be Competed No Later Than:
6 weeks After Release of Order (ARO)
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software
☐ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation ☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: SME shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site
☐ Acceptance Not Expected to Exceed 7 Business Days
☒ Acceptance Expected to Exceed 7 Business Days:
3 weeks
☐ Inspection and Acceptance Plan:
[Explanation]
[Enter Other Requirements]
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable Warranty Length: 1 Year [i.e. 3 - Years] What is included?
☒ Labor ☒ Parts ☐ Travel ☒ Cost and Liability for Returns
☐ Other
☐ 1 Option Period
☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.