Specifications.pdf
PDF 1 MB Posted
- Attached to
- INTERIOR PAINT AND CARPET DORM HOUSE Federal contract opportunity
- Solicitation number
- 140P6424Q0055
About this file
This document is a solicitation notice for a Request for Quote (RFQ) to provide interior painting and flooring replacement services for the Dorm House at Perry's Victory and International Peace Memorial in Put-in-Bay, Ohio. The scope of work includes removing approximately 400 sq. ft. of wallpaper, painting approximately 4,800 sq. ft. of interior space, and removing and replacing 1,250 sq. ft. of carpet with waterproof vinyl plank flooring. The solicitation is set aside 100% for small businesses, with a NAICS code of 238990 and a size standard of $19 million. The anticipated contract is firm-fixed price, with performance to begin in mid-September 2024. Interested offerors must be registered in SAM and obtain a Unique Entity ID. The contracting agency is the National Park Service Midwest Region. A site visit is required per the solicitation details. Proposals will be evaluated on technical, past performance, and price factors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DOL_Wage_Determination.pdf | ||
| Provisions_to_be_Completed.pdf | ||
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140P6424Q0055.pdf | ||
| Price_Schedule.pdf | ||
| Construction_Contract_Administration.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Perry’s Victory and International Peace
Memorial
Interior Paint and Replace carpet in the Dorm House
PMIS 257872
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
4/3/2024
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 09 – Finishes
Section – SECTION 09 91 23 INTERIOR PAINTING
Appendices
Appendix A: Flooring (Or Equal)
Appendix B: Drawings and Photos
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The Dorm House was built in 1954. It is a 2,778 square foot house with four bedrooms and two bathrooms. With one main living room area and a foyer that has wallpaper on the walls from the early 1980s. The walls are constructed of plaster board. There is a chair rail throughout the living room and foyer that contains lead paint that has been encapsulated by latex paint. The first floor living room and bedroom doors, baseboard trim and door trim have lead paint that has been encapsulated by latex paint.
1.2 Work Covered by the Contract Documents:
A. Project Location: 3 Bayview Ave. Put in Bay, Ottawa County, Ohio 43456
B. Work consists of: Remove the wallpaper in the house, approximately 400 SF. The wallpaper is mainly in the living room above the chair rail and in foyer above the chair rail. The wallpaper in the living room has been painted with latex paint. There is also wallpaper in the small hallway leading to the first-floor bedrooms below the chair rail. Patch and repair any wall damage from removing wallpaper. Paint the walls, trim, doors and ceilings in the living room, foyer, hallway, four bedrooms, stair well and closets. This painted area is approximately 4800 square feet including doors and trim. The color will be selected by the COR from the entire Sherwin Williams (or equal) color selection chart. The color of the walls, trim and doors will be the same color, but the doors and trim will have a semi-gloss finish and the walls will have an eggshell finish and the ceilings will be flat white paint.
C. Remove and replace approximately 1250 SF of carpet from the living room, hallways, foyer, four bedrooms including closets and replace with a waterproof vinyl plank flooring. The stairs currently have a carpeted tread, this needs to be removed and replaced with waterproof vinyl plank flooring with a stair nosing to cover the edge of the tread. See Appendix A for minimum specifications of flooring products.
D. The contractor is required to complete all work within 30 days. The building will be vacant for contractor access from September 15 through April 15. Work must be complete during this period. The contractor will not be allowed to stay in the building during construction.
E. The NPS will move all furniture from the workspace. The contractor must give the NPS at least 14 days’ notice before they begin work.
F. The park is located on an island in Lake Erie approximately 3 ½ miles from the mainland and the Ferry is weather dependent and shuts down for the season approximately November 27. After this date the Ferry may run but is weather and ice dependent throughout the winter. The Ferry schedule starts running again approximately March 21.
G. The contractor will not use NPS sinks, tubs or drains for cleaning their equipment. The NPS will supply water for their use but the contractor must dispose of the waste water legally outside the park.
H. All work will be performed under a single contract.
I. Period of performance: Work shall be completed within 180 calendar days of the start date provided on the Notice to Proceed.
a. Clarification: The Notice to Proceed will be issued with a period of performance that is all inclusive of supply lead times, material deliveries, decommissioning, installation, anticipated average weather days for location, final commissioning, and acceptance of completed work. The contractor will be expected to provide a project schedule with adequate critical path details to ensure all work is completed within the stated calendar days from issuance of the Notice to Proceed. If weather impacts project beyond typical average weather patterns, contractor shall provide documentation in request for additional days.
1.3 Existing Condition Protections:
A. Preservation of Historical and Archeological Fabric:
i. The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
ii. IF, in connection with operations under this contract, the Contractor, subcontractors, or employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the discovery and notify the Contracting Officer immediately, when safe to do so, and follow up in writing within 2 days, giving the location and nature of the findings. No objects of cultural resource value may be removed. Contracting Officer will contact other entities as required.
iii. Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with Changes clause.
iv. The Contractor will be responsible for protecting the cultural resources within and adjacent to the project area from damage. In addition, the Contractor will be liable for all damage to the cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or their representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
v. The Contractor agrees to include this language within all subcontracts.
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative
(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
Superintendent's Compendium - Perry's Victory & International Peace Memorial (U.S. National Park Service) (nps.gov) A. Communications: Contractor shall provide the Contracting Officer and COR with methods of communications including land and/or cell phone numbers (note some areas of work have limited service coverage), email and in case of emergency 24-hour contact options for duration of time operations.
B. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
C. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
D. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
7 a.m. to 3:30 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Do Not disturb site outside of noted disturbance area, including earthwork and clearing of vegetation, to: N/A
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract
Sum as required.
2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
a. Toilets: Contractor shall be able to use the existing restroom facilities in the dormitory. The restroom facilities shall be kept in immaculate condition. At the discretion of Park personnel and/or COR; contractor may lose the use of the restroom facilities if they are not kept clean and orderly. Restroom use will be a “One strike and you’re out” policy.
1. If restroom privileges are revoked Contractor will be required to provide a toilet for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.
E. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: N/A
4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
5. Temporary Enclosures: N/A
6. Site Enclosure Fence: N/A
7. Hot Work Permit: N/A
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage units shall be provided by the contractor and exact location within staging area may be discussed at the preconstruction briefing. All storage units provided by the contractor shall be in a clean and acceptable condition to the COR. Security of the materials and equipment on site is the Contractor’s responsibility. The parking area to the west of the house will be used for contractor parking. This area will be used for any necessary staging, including dumpster location.
3.5 Preservation of Natural Features: N/A.
3.6 Hauling Restrictions: Contractor shall verify and be responsible for the path accessing the site and obtaining / maintaining all local, state and federal permits/licenses associated with hauling/road requirements and dumping of materials associated with the project.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings: N/A
B. New /Existing Buildings Unoccupied:
1. Contractor shall be responsible for and protect the entire facility and construction site from notice to proceed through final acceptance.
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted preferably electronically by email or optional via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
B. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
C. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
D. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management
A. Contractor shall not have personal radios or other media sources and they shall not be broadcast within NPS property.
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract. Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items visible during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the
Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain enough PPE for all contract employees including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the local 911 Emergency Response, COR and or the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items are to be submitted prior to the Preconstruction Conference or as specified at the CO’s discretion. The timeline for the documents to be submitted will be addressed at the pre-construction conference for those items that were not received and approved prior. Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies if not resolved as directed.
Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Quality Control Plan.
9.2 Project Submittal Process (Shop Drawings, Product Data, and Samples): Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file
(.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all product color selections.
Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the
Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: All brand names noted are subject to ‘or equal’ products. If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification. Contractor shall incorporate and be responsible for all collateral costs due to the or equal proposed as required to provide a complete project.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that General Contractor:
1. Has investigated and shall provide documentation in request showing that the proposed item is equal or superior in all respects to the salient characteristics specified.
2. Will meet or exceed warranties for the proposed item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the
Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents. Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of
Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
ITEM 12 - DEFINITION OF CONTRACT LINE ITEMS
12.1 Summary
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
12.2 List of Contract Line Items
A. Contract Line-Item No.010 Paint and carpet Dormitory Building.
1. This item consists of painting and carpeting dormitory building.
1. Payment will be made per the contract and percentage of completion level.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
SECTION 099123
INTERIOR PAINTING
PART 5 - GENERAL
5.1 SCOPE OF WORK
J. Perrys Victory: 93 Delaware Ave, Put In Bay OH 43456.
A. Project Location: 3 Bayview Ave. Put in Bay, Ottawa County, Ohio 43456
B. Building(s) Name/Identifier: Dormitory
5.2 SUMMARY
A. Section includes surface preparation and the application of paint systems on the following interior substrates:
1. Gypsum board.
2. Plaster.
3. Spray-textured ceilings.
5.3 DEFINITIONS (Master Painters Institute-MPI)
A. Master Painters Institute (MPI) (http://www.specifypaint.us & http://paintinfo.com/)
B. MPI Gloss Level 1: Not more than five units at 60 degrees and 10 units at 85 degrees, according to ASTM D 523.
C. MPI Gloss Level 2: Not more than 10 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D 523.
D. MPI Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to
ASTM D 523.
E. MPI Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D 523.
F. MPI Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.
G. MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.
H. MPI Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523.
5.4 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions.
1. Include Printout of current "MPI Approved Products List" for each product category specified, with the proposed product highlighted.
2. Include Safety Data Sheets (SDS).
B. Samples: For each type of paint system and in each color and gloss of topcoat.
5.5 QUALITY ASSURANCE
A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Contracting Officer’s Representative (COR) will select one surface to represent surfaces and conditions for application of each paint system.
a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft..
b. Other Items: COR will designate items or areas required.
2. Final approval of color selections will be based on mockups.
a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by COR at no added cost to Owner.
PART 6 - PRODUCTS
6.1 MANUFACTURERS
A. MPI Listing Manufacturers as shown on the MPI Approved Products Lists.
B. Products: Subject to compliance with requirements, provide product listed in the Interior Painting Schedule for the paint category indicated.
6.2 PAINT, GENERAL
A. MPI Standards: Products shall comply with MPI standards indicated and shall be listed in its "MPI Approved Products Lists."
B. Material Compatibility:
1. Materials for use within each paint system shall be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for use in paint system and on substrate indicated.
C. Colors: As selected by Contracting Officer’s Representative (COR) from manufacturer's full range.
PART 7 - EXECUTION
7.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows.
1. Wood: 15 percent.
2. Gypsum Board: 12 percent.
3. Plaster: 12 percent.
C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
D. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Application of coating indicates acceptance of surfaces and conditions.
7.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual" applicable to substrates and paint systems indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.
C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.
D. Wood Substrates:
1. Scrape and clean knots, and apply coat of knot sealer before applying primer.
2. Sand surfaces that will be exposed to view, and dust off.
3. Prime edges, ends, faces, undersides, and backsides of wood.
4. After priming, fill holes and imperfections in the finish surfaces with putty or plastic wood filler. Sand smooth when dried.
7.3 APPLICATION
A. Apply paints according to manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual."
1. Use applicators and techniques suited for paint and substrate indicated.
2. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces.
Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only.
3. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.
B. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
C. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
D. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work:
1. Paint the following work where exposed in equipment rooms:
a. Equipment, including panelboards.
b. Uninsulated metal piping.
c. Uninsulated plastic piping.
d. Pipe hangers and supports.
e. Metal conduit.
f. Plastic conduit.
g. Duct, equipment, and pipe insulation having cotton or canvas insulation covering or other paintable jacket material.
7.4 CLEANING AND PROTECTION
A. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
B. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by COR, and leave in an undamaged condition.
C. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
7.5 INTERIOR PAINTING SCHEDULE
A. Concrete Substrates, Nontraffic Surfaces:
1. Institutional Low-Odor/VOC Latex System MPI INT 6.1Q:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Topcoat: Latex, interior, institutional low odor/VOC, flat (MPI Gloss Level 1), MPI #143.
c. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 2), MPI #144.
d. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 3), MPI #145.
e. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 4), MPI #146.
f. Topcoat: Latex, interior, institutional low odor/VOC, semi-gloss (MPI Gloss
Level 5), MPI #147.
g. Topcoat: Latex, interior, institutional low odor/VOC, gloss (MPI Gloss
Level 6), MPI #148.
2. High-Performance Architectural Latex System MPI INT 6.1N:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 2), MPI #138.
c. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 3), MPI #139.
d. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 4), MPI #140.
e. Topcoat: Latex, interior, high performance architectural, semi-gloss (MPI Gloss
Level 5), MPI #141.
B. Wood Substrates: Exposed framing.
1. Institutional Low-Odor/VOC Latex System MPI INT 6.2L:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Topcoat: Latex, interior, institutional low odor/VOC, flat (MPI Gloss
Level 1), MPI #143.
c. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 2), MPI #144.
d. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 3), MPI #145.
e. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 4), MPI #146.
f. Topcoat: Latex, interior, institutional low odor/VOC, semi-gloss (MPI Gloss
Level 5), MPI #147.
g. Topcoat: Latex, interior, institutional low odor/VOC, gloss (MPI Gloss
Level 6), MPI #148.
2. High-Performance Architectural Latex System MPI INT 6.2B:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 2), MPI #138.
c. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 3), MPI #139.
d. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 4), MPI #140.
e. Topcoat: Latex, interior, high performance architectural, semi-gloss (MPI Gloss
Level 5), MPI #141.
C. Wood Substrates: Dressed Wood (trim, Architectural woodwork, Doors, Windows, and wood board paneling).
1. Institutional Low-Odor/VOC Latex System MPI INT 6.3V:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Topcoat: Latex, interior, institutional low odor/VOC, flat (MPI Gloss
Level 1), MPI #143.
c. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 2), MPI #144.
d. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 3), MPI #145.
e. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 4), MPI #146.
f. Topcoat: Latex, interior, institutional low odor/VOC, semi-gloss (MPI Gloss
Level 5), MPI #147.
g. Topcoat: Latex, interior, institutional low odor/VOC, gloss (MPI Gloss
Level 6), MPI #148.
2. High-Performance Architectural Latex System:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Intermediate Coat: Latex, interior, high performance architectural, matching topcoat.
c. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 2), MPI #138.
d. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 3), MPI #139.
e. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 4), MPI #140.
f. Topcoat: Latex, interior, high performance architectural, semi-gloss (MPI Gloss
Level 5), MPI #141.
D. Wood Substrates: Wood paneling and casework.
1. Institutional Low-Odor/VOC Latex System MPI INT 6.4T:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Topcoat: Latex, interior, institutional low odor/VOC, flat (MPI Gloss
Level 1), MPI #143.
c. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 2), MPI #144.
d. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 3), MPI #145.
e. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 4), MPI #146.
f. Topcoat: Latex, interior, institutional low odor/VOC, semi-gloss (MPI Gloss
Level 5), MPI #147.
g. Topcoat: Latex, interior, institutional low odor/VOC, gloss (MPI Gloss
Level 6), MPI #148.
2. High-Performance Architectural Latex System MPI INT 6.4S:
a. Prime Coat: Primer, latex, for interior wood, MPI #39.
b. Intermediate Coat: Latex, interior, high performance architectural, matching topcoat.
c. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 2), MPI #138.
d. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 3), MPI #139.
e. Topcoat: Latex, interior, high performance architectural (MPI Gloss
Level 4), MPI #140.
f. Topcoat: Latex, interior, high performance architectural, semi-gloss (MPI Gloss
Level 5), MPI #141.
E. Wood Substrates: Traffic surfaces, including floors and stairs.
1. Alkyd Floor Enamel System MPI INT 6.5A:
a. Prime Coat: Floor enamel, alkyd, matching topcoat.
b. Topcoat: Floor enamel, alkyd, gloss (MPI Gloss Level 6), MPI #27.
1) Additive: Manufacturer’s standard additive to increase skid resistance of glossy surface.
c. Topcoat: Floor enamel, alkyd, low gloss (MPI Gloss Level ___), MPI #59
2. Polyurethane, Clear, Moisture Cured (over semi-transparent stain)
a. Prime Coat: Matching topcoat
b. Topcoat: Polyurethane, gloss (MPI Gloss Level 6),MPI #31
F. Spray-Textured Ceiling Substrates:
1. Latex, Flat System MPI INT 9.1A: Spray applied.
a. Prime Coat: Latex, interior, flat, matching topcoat.
b. Topcoat: Latex, interior, flat (MPI Gloss Level 1), MPI #53.
2. Latex System MPI INT 9.1B
a. Prime Coat: Latex, interior, matching topcoat.
b. Topcoat: Latex, interior, flat (MPI Gloss Level 1), MPI #53.
c. Topcoat: Latex, interior (MPI Gloss Level 2), MPI #44.
d. Topcoat: Latex, interior (MPI Gloss Level 3), MPI #52.
e. Topcoat: Latex, interior (MPI Gloss Level 4), MPI #43.
f. Topcoat: Latex, interior, semi-gloss (MPI Gloss Level 5), MPI #54.
g. Topcoat: Latex, interior, gloss (MPI Gloss Level 6, except minimum gloss of 65 units at 60 degrees), MPI #114.
G. Gypsum Board and Plaster Substrates:
1. Institutional Low-Odor/VOC Latex System MPI INT 9.2M:
a. Prime Coat: Primer sealer, interior, institutional low odor/VOC, MPI #149.
b. Intermediate Coat: Latex, interior, institutional low odor/VOC, matching topcoat.
c. Topcoat: Latex, interior, institutional low odor/VOC, flat (MPI Gloss
Level 1), MPI #143.
d. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 2), MPI #144.
e. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 3), MPI #145.
f. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss Level 4), MPI #146.
g. Topcoat: Latex, interior, institutional low odor/VOC, semi-gloss (MPI Gloss
Level 5), MPI #147.
h. Topcoat: Latex, interior, institutional low odor/VOC, gloss (MPI Gloss
Level 6), MPI #148.
END OF SECTION
Div. 1 V. 2023-11-11 Page | 1
Appendix A: Flooring (or Equal)
Page | 2
Appendix B Drawings and Photos
Page | 3
Page | 4
File details come from the government source that posted it. Updated .