REPAIR AND PAVING OF PARKING LOT - WELCH COMMUNITY HOSPITAL
This General Construction Specifications document outlines a request for quotation (ARFQ 0512 2845 WEH2700000003) issued by the West Virginia Office of Shared Administration, Purchasing Division on behalf of the Department of Health Facilities for repair and paving services at Welch Community Hospital's existing parking lots. The project scope includes removal and replacement of deteriorated asphalt across multiple areas: approximately 52,997 square feet of Superpave hot mix asphalt in the main entrance area (2 inches removal depth, 2 lifts), approximately 3,000 square feet in the main entrance area (4 inches removal depth, 2 lifts), sealcoating of approximately 26,000 square feet in employee parking and loading dock areas (2 coats), crack sealing of approximately 1,200 linear feet, and re-striping of main and employee parking areas. Additional work includes milling adjoining roads and entrances, surface mix dragging for low spots, tack coat application, and non-destructive compaction testing throughout work areas. Vendors must complete all work within 180 business days from the Notice to Proceed and maintain standard work hours of 7:00 AM to 7:00 PM, Monday through Friday, excluding State of West Virginia holidays.
Contracts will be awarded to the lowest qualified responsible bidder, with award determination based on the base bid total and any accepted alternates listed in order of preference (maximum of five alternates permitted). Vendors must hold a current West Virginia Contractors License and demonstrate successful completion of at least three similar projects, verified through references and documentation prior to contract award. The project is funded in part or in whole by federal funds, requiring all bidders to acknowledge and adhere to a Federal Funds Addendum. Progress payments will be made monthly based on the Architect's approval and a contractor-submitted payment allocation schedule, with the Agency retaining 10 percent from each progress payment until substantial completion certification. The contract includes Health Insurance Portability and Accountability Act (HIPAA) Business Associate Agreement requirements, Equal Employment Opportunity compliance, and all permit procurement responsibilities fall to the vendor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit B.pdf | ||
| WV72 Drug Free Coversheet.pdf | ||
| WV73 Drug Free Affidavit.pdf | ||
| BondLaborMat.pdf | ||
| Federal Funds Addendum.pdf | ||
| Bid Bond Instructions.pdf | ||
| PAffidavit.pdf | ||
| WV-43 WV-36.pdf | ||
| Final_ARFQ_0512_WEH2700000003_2_WV_ARFQ_FORM.PDF | ||
| Addendum 1 ARFQ WEH2700000003.pdf | ||
| Pre Bid Sign In Sheet.pdf | ||
| EXHIBIT A.docx | DOCX document | |
| Maintenance Bond.pdf | ||
| TCA.pdf | ||
| Bond Perform.pdf | ||
| Final_ARFQ_0512_WEH2700000003_1_WV_ARFQ_FORM.PDF | ||
| WV75 - Construction Bid Submission Review.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
ARFQ 0512 2845 WEH2700000003
REPAIR AND PAVING OF PARKING LOT
GENERAL CONSTRUCTION SPECIFICATIONS
1. PURPOSE AND SCOPE: The West Virginia Office of Shared Administration, Purchasing Division is soliciting bids on behalf of the Department of Health Facilities (DHF), Welch Community Hospital (WCH) for the repair and paving of the existing parking lots at Welch Community Hospital.
The Vendor shall furnish all materials, labor, and equipment necessary to complete all Construction services. The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction services, even if such incidental work is not explicitly included in the Project Plans.
NOTE: This request is covered in part or in whole by federal funds. All bidders will be required to acknowledge and adhere to attached Federal Funds Addendum.
NOTE: The DoHS OSA has developed an EEOP Utilization Report, and it is available at: https://dhhr.wv.gov/office-of-drug-control-policy/news/Documents/EEO%20Uitlization%20Report%20Completed%20Form%201-29-21-final-PDF%20review%20for%20approval%20to%20submit%20%283%29.pdf
NOTE: The Health Insurance Portability and Accountability Act of 1996 (hereafter, HIPAA) Business Associate Addendum (“Addendum”) is made a part of the Agreement by and between the West Virginia Department of Health Facilities (DHF), Bureau for Office of Health Facilities (OHF), Welch Community Hospital (Agency), and Business Associate (Vendor) and is effective as of the date of execution of the Addendum.
2. DEFINITIONS: The terms listed below shall have the meanings assigned to them below. Additional definitions can be found in section 2 of the General Terms and Conditions and in the Specification’s Manual as defined below.
2.1 “Construction Services” means the repair and paving of the existing parking lots at Welch Community Hospital as more fully described in the specifications.
2.2 “Pricing Page” means the pages contained in wvOASIS, attached hereto, or included in the Specifications/Project Manual upon which Vendor should list its proposed price for the Construction Services.
2.3 “Solicitation” means the official notice of an opportunity to supply the State with Construction Services that is published by the Purchasing Division.
2.4 “Specifications/Project Manual” means the American Institute of Architect forms, specifications, plans, drawings, and related documents developed by the architect, engineer, or Agency that provide detailed instructions on how the Construction Services are to be performed along with any American Institute of Architects documents (“AIA documents”) attached thereto.
3. ORDER OF PRECEDENCE: This General Construction Specifications document will have priority over, and supersede, anything contained in the Specifications.
4. QUALIFICATIONS: Vendor, or Vendor’s staff if requirements are inherently limited to individuals rather than corporate entities, shall have the following minimum qualifications:
4.1. Experience: Vendor, or Vendor’s supervisory staff assigned to this project, must have successfully completed at least (3) projects that involved work similar to that described in the Specifications. Compliance with this experience requirement will be determined prior to contract award by the State through references provided by the Vendor upon request, through knowledge or documentation of the Vendor’s past projects, through confirmation of experience requirements from the architect assisting the State in this project, or some other method that the State determines to be acceptable. Vendor must provide any documentation requested by the State to assist in confirmation of compliance with this provision. References, documentation, or other information to confirm compliance with this experience requirement may be requested after bid opening and prior to contract award.
4.2 Vendor must hold a current West Virginia Contractors License.
5. VENDOR RESPONSIBLITES:
5.1 Vendor must removal loose deteriorating asphalt to an approximate depth of 2” and install approximately 52,997 square feet of Superpave hot mix asphalt, “or equal” at main entrance area in 2 lifts using 1.75” binder coarse of new 19mm base mix and 1.25” of 9.5mm surface coarse indicated in blue on the map.
Reference Exhibit B.
5.2 Vendor must remove loose deteriorating asphalt to an approximate depth of 4” and install approximately 3,000 square feet of Superpave hot asphalt mix “or equal” at main entrance in 2 lifts using 2.75” of new 19mm base mix and 1.25” of 9.5mm surface coarse indicated in red on the map. Reference Exhibit B.
5.3 Vendor must sealcoat approximately 26,000 square feet of Superpave hot mix asphalt to the employee parking area and loading dock using 2 coats of material. Indicated in green and yellow on the map. Reference Exhibit B.
5.4 Vendor must crack seal approximately 1200 linear feet of asphalt in the main parking area. Indicated in green and yellow on the map. Reference Exhibit B.
5.5 Vendor must re-strip main parking areas according to the existing markings. Indicated in blue and yellow on the map. Reference Exhibit B.
5.6 Vendor must re-strip employee parking areas according to the existing markings. Indicated in blue and yellow on the map. Reference Exhibit B.
5.7 Vendor must broom clean all areas before paving.
5.8 Vendor shall mill all adjoining roads and entrances to provide full depth tie in as well as smooth transitions.
5.9 Vendor must drag all low spots with surface mix to level surface before paving.
5.10 Vendor must apply tack coat as necessary to vertical tie in areas before paving.
5.11 Vendor must maintain flush finish to all adjoining concrete areas that are currently flush with pavement.
5.12 Vendor must perform non-destructive compaction testing in all areas of work.
NOTE: Reference Exhibit B for map of existing parking lots.
6. CONDITIONS OF THE WORK:
6.1 Permits: The Vendor must be responsible to procure all necessary permits and licenses to comply with all applicable Federal, State, or Local laws, regulations and ordinances of any regulating body.
6.2 Existing Conditions: If discrepancies are discovered between the existing conditions and those noted in the specifications, Vendor must immediately notify the Agency's representative. Vendor must also immediately notify the Agency if suspected hazardous materials are encountered.
6.3 Standard Work Hours: The standard hours of work for this Contract will 7:00 AM – 7:00 PM Monday – Friday, excluding holidays recognized by the State of West Virginia. any work outside of the standard hours of work must be approved in advance at the Agency’s sole discretion. Authorization of work outside of the standard hours of work will not entitle Vendor to additional compensation.
6.4 Vendor must complete all work within 180 business days from the date of Notice to Proceed.
7. Project Closeout: Project Closeout shall include the following:
7.1 Final Cleanup: Vendor shall perform the final cleanup activities listed below, along with any other final cleanup activities normally associated with the work performed under this Contract, prior to final inspection.
7.1.1 All work areas shall be swept clean and all debris involved in the project shall be removed from the facility premises at the completion of the project.
7.1.2 Any areas of grass and landscaping that were disturbed during the project shall be returned before project conditions.
7.1.3 All areas reseeding shall be smoothed reseeded and strawed.
8. Final Inspection: Vendor shall participate in a final inspection with the Agency’s project manager. The purpose of the final inspection will be to identify deficiencies that need to be remedied prior to Agency’s final acceptance of the work. Vendor shall at all times be obligated to perform in accordance with the Contract and must take all actions necessary to ensure that work complies with requirements of Contract prior to final acceptance. Final acceptance does not waive or release Vendor from its obligation to ensure that work complies with the Contract requirements. Vendor shall submit any warranty documents to the Agency project manager at final inspection.
9. CONTRACT AWARD: The Contract is intended to provide the Agency with a purchase price for the Construction Services. The Contract will be awarded to the lowest qualified responsible bidder meeting the required specifications. If the Pricing Pages contain alternates/add-ons, the Contract will be awarded based on the grand total of the base bid and any alternates/add-ons selected.
10.
6. SELECTION OF ALTERNATES: Pursuant to W. Va. Code § 5-22-1(f), any solicitation of bids shall include no more than five alternates. Alternates, if accepted, shall be accepted in the order in which they are listed on the bid form. Any unaccepted alternate contained within a bid shall expire 90 days after the date of the opening of bids for review. Determination of the lowest qualified responsible bidder shall be based on the sum of the base bid and any alternates accepted. Alternate selection will be identified in the Purchase Order.
7. PROGRESS PAYMENTS: The Vendor will be paid in the form of periodic progress payments for work completed. Payment requests along with documentation supporting the request will be submitted to and reviewed by the Architect. If approved, the Architect will communicate approval to the Owner and Owner will process payment. The Owner reserves the right to withhold liquidated damages from progress payments. Progress payments will be made no more than monthly.
Approval and payment of progress payments will be based on Contractor’s submission of a payment allocation schedule which allocates the entire contract sum to payment milestones. Architect and Owner will review the payment allocation and may mandate changes that they believe are necessary.
8. RETAINAGE: Agency is entitled to withhold 10% from each progress payment made as retainage. Agency will partially release retainage upon certification of substantial completion by the Architect in accordance with this Contract but will continue to retain amounts sufficient to cover activities needed to reach final completion.
9. PERFORMANCE: Vendor shall perform the Construction Services in accordance with this document and the Specifications/Project Manual.
10. SUBSTANTIAL AND FINAL COMPLETION: Vendor shall achieve final completion within 180 days after the Notice to Proceed has been received. Failure to meet the deadlines established herein, unless extended by change order authorizing additional time free of liquidated damages, will result in liquidated damages being applied.
11. PROJECT PLANS: Copies of the project plans can be obtained by contacting the entity identified below.
12. SUBSTITUTIONS: Any substitution request must be submitted in accordance with the official question and answer period described in the INSTRUCTIONS TO VENDORS SUBMITTING BIDS, Paragraph 4. Vendor Question Deadline.
13. FACILITIES ACCESS: Performance of Contract Services may require access cards and/or keys to gain entrance to Agency’s facilities. In the event that access cards and/or keys are required:
13.1. Vendor must identify principal service personnel which will be issued access cards and/or keys to perform service.
13.2. Vendor will be responsible for controlling cards and keys and will pay replacement fee, if the cards or keys become lost or stolen.
13.3. Vendor shall notify Agency immediately of any lost, stolen, or missing card or key.
13.4. Anyone performing under this Contract will be subject to Agency’s security protocol and procedures.
13.5. Vendor shall inform all staff of Agency’s security protocol and procedures.
14. MISCELLANEOUS:
14.1. Contract Manager: During its performance of this Contract, Vendor must designate and maintain a primary contract manager responsible for overseeing Vendor’s responsibilities under this contract. The contract manager must be available during normal business hours to address any customer service or other issues related to this contract. Vendor should list its contract manager and his or her contact information below.
Contract Manager: ______________________
Telephone Number: ________________________
Fax Number: ______________________________
Email Address: ____________________________
14.2. Owner’s Representative: Owner’s representative for notice purposes is
Name: _____________________________________
Telephone Number: ________________________
Fax Number: ______________________________
Email Address: ____________________________
15. Initial Decision Maker: _______________________, the Architect, shall serve as the Initial Decision Maker in matters relating to this contract.