This specification document outlines requirements for a service contract to supply water and wastewater chemicals and operation supplies to the Beltsville Agricultural Research Center in Beltsville, Maryland. The contract will have a one-year base period of performance from an estimated start date of September 30, 2023 through August 31, 2024, along with four additional one-year ordering periods. The contractor will be responsible for delivering various chemicals on a quarterly basis in estimated quantities, as well as various supplies also on a quarterly basis or within one week of order date if needed. Tables in the specification list the required chemicals and supplies by name, description, estimated annual and quarterly quantities, and delivery container type. The chemicals and supplies are critical to maintaining permitted discharge limits at two wastewater treatment plants and regulated water quality standards at one water treatment plant operated by the research center.

View the file

Other files

File Type Posted
Table 1-Chemicals Price Schedule.docx DOCX document
Contract Terms and Conditions.docx DOCX document
Table 2-Supplies Price Schedule.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE BELTSVILLE AGRICULTURAL RESEARCH CENTER

FACILITIES SERVICE

UTILITIES MANAGEMENT UNIT

BUILDING 426A, BARC EAST

10300 BALTIMORE AVENUE

BELTSVILLE, MARYLAND 20705-2350

SPECIFICATION for SERVICE CONTRACT FOR SUPPLYING WATER AND WASTEWATER CHEMICALS AND OPERATION SUPPLIES

BELTSVILLE AGRICULTUREAL RESEARCH CENTER

BELTSVILLE MARYLAND

August 21, 2023

GENERAL REQUIREMENTS

1. GENERAL

1.1. BACKGROUND

The United State Department of Agriculture (USDA), Agricultural Research Services (ARS), Beltsville Agricultural Research Center (BARC) own and operates eight (8) Water Wells, a Raw Water System, a Water Treatment Plant (WTP), a Water Distribution System (WDS), a Wastewater Collection System (WWCS), and two Wastewater Treatment Plants (WWTP) located in Beltsville, MD.

Historically, purchasing supplies and chemicals for the operation needs of these facilities have been secured through independent purchases as supplies are needed.

1.2. PROJECT LOCATION

Beltsville Agricultural Research Center (BARC) is located in Beltsville, MD. Chemical and supplies shall be delivered as specified to any facility within the entire BARC campus, but mainly to one of the major facilities which are as follows:

Water treatment plant – Building 310 Eastside Wastewater Treatment Plant – Building 218 Westside Wastewater Treatment Plant – Building 015

1.3. INTENT

The intent of this solicitation is to award one contract for the purchase and delivery of chemicals and supplies required for the operations of BARC water and wastewater facilities.

1.4. GENERAL RESPONSIBILITIES AND REPORTING

Under this contract, the Contractor will provide chemicals and supplies identified in this contract in accordance with issues ordered.

· Intervals identified in this document are estimates and actual orders will identify the specific actual delivery times.

· Deliveries may be required within a week of an order being placed.

2. ADMINISTRATIVE

2.1. SECURITY

All employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission of the ARS Location Manager, be identified by project and employer by always wearing contractor-issued identification badges on ARS property, and restricted from unauthorized access.

2.2. SAFETY/OSHA CERTIFICATION

A. The general contractor shall provide proof that they are fully authorized to handle such chemicals and supplies.

3. SCOPE OF WORK

3.1. CHEMICALS AND CHEMICALS DELIVERY

A. BARC water and wastewater facilities use various chemicals to support the treatment processes at these facilities. These chemicals are critical to the operations and to maintaining the permitted discharge limits at the wastewater treatment plants and to maintaining the regulated water quality standards at the water treatment plant. As such, delivery of these chemicals must be made once every quarter (once every three months) at the estimated quantities as indicated below to ensure the maintenance of these permitted limits and regulated standards.

B. Chemicals quantities used depend mostly on water demand at the water treatment plant and the wastewater flows at the wastewater treatment plants. As such, the quantities listed below are the best estimates using the average water demand and wastewater flow rates historically experienced at these plants. Accordingly, quarterly quantities may slightly change from the quantities noted below.

C. At some instances and under certain circumstances, additional chemicals maybe required at one of these plants at times other than the regularly scheduled quarterly deliveries. In such instances, the Contractor shall be capable of and responsible for delivering such chemicals within ONE WEEK of their order date.

D. Table 1 below lists all chemicals required at BARC water and wastewater facilities. The table lists each chemical name, detailed description, delivery container capacity, estimated quantity of the chemical required annually, estimated quantity of the chemical required monthly and the estimated quantity of the chemical required quarterly for deliver in quarterly basis.

1 | Page

Table 1

Chemical Name
Description
Container Size
Estimated Quantity/year
Estimated Quantity/Month
Estimated Delivery Quantity/Quarter
*Chlorine
Chlorine 1 Ton CY or 150lb CY542 NSF LIQ. GAS
1 Ton

or 150 lb. Cylinder or 1/6 Or 0.5 Or

Chlorine
Chlorine 150lb CY542 NSF LIQ GAS
150 lb. Cylinder
36
6
18
Sulfur Dioxide
Sulfur Dioxide 150lb CY542 TECH GAS
150 lb. Cylinder
36
3
9
Soda Ash
Sodium Carbonate, CAS #: 497-19-8
Pallet (49-50lb bags/pallet)
36
3
9
CES PACL 900S
Concentrated solution of polyaluminum hydroxychlorosulfate
Bulk (lb.)
80,000
6700
20,000
Micro C2000
Micro C Glycerin, Proprietary glycerin-based and non-hazardous product series
Bulk (lb.)
30,000
2500
7,500
Magnesium Hydroxide
Flomag HUS Bulk, Magnesium Hydroxide in Water, NMFC 045080
Tote (275 gal)
36
3
9
Liquichlor
12.5% Solution hypochlorite
15-gallon drums
12
1
3

* Along with the 1-ton cylinders, the Eastside WWTP shall receive three 150 pounds cylinders every 6 months along with the 1-ton cylinder to act as a spare supply if the 1-ton cylinder is depleted before the next delivery time.

3.2. SUPPLIES AND SUPPLIES DELIVERY

A. BARC water and wastewater facilities use various supplies in addition to the chemicals noted above. These supplies are critical to the operations and to maintaining the permitted discharge limits at the wastewater treatment plants and to maintaining the regulated water quality standards at the water treatment plant. These supplies are used for fine tuning processes, testing of permitted and regulated limits and standards, and for maintaining certain critical equipment that require frequent supply of these items. As such, delivery of these chemicals must be made once every quarter (once every three months) at the estimated quantities as indicated below if no direction is provided by the UMUM at least one week before the scheduled delivery date.

B. Supplies quantities used depend mostly on water demand at the water treatment plant and the wastewater flows at the wastewater treatment plants. As such, the quantities listed below are the best estimates using the average water demand and wastewater flow rates historically experienced at these plants. Accordingly, quarterly quantities may slightly change from the quantities noted below.

C. At some instances and under certain circumstances, additional supplies maybe required at one of these plants at times other than the regularly scheduled quarterly deliveries. In such instances, the Contractor shall be capable of and responsible for delivering such supplies within ONE WEEK of their order date.

D. Table 2 below lists all supplies required at BARC water and wastewater facilities. The table lists each required item/supply name, detailed description, delivery container/unit/capacity, estimated quantity required annually, estimated quantity required monthly and the estimated quantity required quarterly for delivery on a quarterly basis.

Table 2

Name
Description
Container Size
Estimated Quantity/year
Estimated Quantity/Month
Estimated Delivery Quantity/Quarter
Envirozyme Nutrient ML
25-1 lb. Pouches
50 lb. Pails
24
2
6
DPD #1 Reagent
Lamotte DPD # 1 Liquid
30 ml droppers
24
2
6
DPD #2 Reagent
Lamotte DPD # 2 Liquid
30 ml droppers
24
2
6
DPD #3 Reagent
Lamotte DPD # 3 Liquid
30 ml droppers
24
2
6
pH Buffer 4
pH Buffer 4 Liquid
20 L Container
6
0.5
2
pH Buffer 7
pH Buffer 7 Liquid
20 L Container
6
0.5
2
pH Buffer 10
pH Buffer 10 Liquid
20 L Container
6
0.5
2
pH Meter
Hach HQ411D Single Input pH Meter or Equivalent
Meter
3
-
As needed
pH Probe
pH probe for Hach HQ411D pH meter
Probe
3
-
As needed
UV Lamps
Trojan 302418 UV Lamp for UV3000 or equivalent
UV Lamps
36
3
12
UV Quartz Sleeve
Trojan 302208 UV Lamp Sleeve for UV3000 or equivalent
UV Lamp Sleeve
36
3
12
Nitrile Gloves
Industrial Nitrile Gloves - Powder-Free, 4 Mil, assorted sizes
100/carton
72
6
18
Oil
Mobil Mobilgear 600 XP 460 Industrial Gear Oil or equivalent
1 gallon
30
2.5
8
Grease
Extreme Duty Multi-Purpose Grease NLGI #2 or equivalent
Tube
24
2
6
Blower Filters
Filters: PN 81-0474
1/box
12
1
3
Blower Filters
Filters: PN 81-0475
1/box
12
1
3
DO Meter
Hach HQ30D53000000 Portable Meter with Rugged Conductivity Probe with 5-meter cable
Meter
2
-
As needed
DO Replacement Parts
Probe CDC40105
Parts
2
-
As needed
Gas Detector
BW Gas Alert Four-Gas Detector PN 77930
Meter
1
-
As needed
Gas Detector Replacement Parts
Replacement Sensors, calibration supplies, PN 55818, PN 71674, PN 72498, PN 31772,73,74
Parts
1
-
As needed

4. PERIOD OF PERFORMANCE

The period of performance will be one base year, dates to be determined at time of award, and four additional one-year ordering periods.

Estimated periods are September 30, 2023, to August 31, 2024 and four additional ordering periods of one year each to run concurrently for a full term of contract of FIVE YEARS.