This is a specifications document from the State of Michigan for the 12-year inspection and rebuild of an Aspen A62 Under Bridge Inspection Unit (Serial Number 10156), identified as Specification C10-0070UBR.20. The document outlines comprehensive inspection, maintenance, and restoration requirements for this specialized equipment used for bridge inspections. The scope of work encompasses 18 major work categories including visual and operational inspections, chassis and sub-frame work, front and rear axle lock servicing, turntable refurbishment, four-boom assembly overhauls, platform restoration, control and limit system upgrades, hydraulic system replacement, and final testing and finishing. All work must comply with manufacturer standards and current ANSI A92.8 stability testing requirements, with final testing including operational verification on a bridge.
The specifications require bidders to respond with agreement or propose alternates for each work item. The scope includes mandatory non-destructive testing for critical structural components, replacement of worn components including pins, bushings, hoses, wires, and fasteners, complete repainting using Dupont 43106X or equivalent paint to match original colors, installation of new electrical systems and limit switches, full hydraulic system service with new filters and oil, and comprehensive stability and operational testing. All removed items from the cab, chassis, and tower remain state property and must be returned with the unit. Specific electrical connection standards are mandated, prohibiting scotch locks and wire nuts in favor of soldered connections with heat shrink or waterproof junction blocks. The document does not specify pricing, contract term, award date, or other commercial terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Purchasing Documents.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Specification # C10-0070UBR.20 Underbridge Inspection Unit, 12 year Inspection and Rebuild. | Bidders Response (Agree or Alternate) | ||
| Under Bridge Inspection Unit: | |||
| Make: Aspen, A62 Serial number 10156 | |||
| 1.0 | Inspection and Reporting | ||
| 1.1 | Perform visual/operation inspection | ||
| 1.2 | Test control and intercom system to manufactures standards | ||
| 1.3 | Test operational limit system to manufactures standard | ||
| 1.4 | Visually inspect hydraulic cylinders for leaks and damage | ||
| 1.5 | Inspect chassis lighting components | ||
| 1.6 | Inspect counter weight ball screw, including motor and wear pads | ||
| 2.0 | Chassis and Sub-frame: | ||
| 2.1 | Inspect units sub-frame and chassis frame | ||
| 2.2 | Replace deck side marker and rear lighting wiring | ||
| 2.3 | Torque sub-frame mounting bolts | ||
| 2.4 | Repair/replace access step and grab rails as needed | ||
| 2.5 | Inspect master panel in truck and replace defective lights or switches as needed | ||
| 2.6 | Ensure that there is proper circuit breaker relay protection installed between truck battery and unit | ||
| 2.7 | Replace front and rear springs if needed | ||
| 3.0 | Axle Locks - Front: | ||
| 3.1 | Remove upper side plates, jaws, and pin rollers, bushings and lower axle lock assemblies | ||
| 3.2 | Make required repairs | ||
| 3.3 | Sand blast, perform magnetical particle test | ||
| 3.4 | Repaint axle lock assemblies | ||
| 3.5 | Install new bolts, nuts and structural fasteners to manufactures standards | ||
| 3.6 | Adjust clearance to manufactures standards | ||
| 4.0 | Axle Locks - Rear: | ||
| 4.1 | Remove pins and bushings | ||
| 4.2 | Replace spherical ball bushings as needed | ||
| 4.3 | Replace upper yoke weldment | ||
| 4.4 | Make required repairs as needed | ||
| 4.5 | Sand blast, perform magnetical particle test | ||
| 4.6 | Repaint axle lock assemblies | ||
| 4.7 | Install new bolts, nuts and structural fasteners to manufactures standards | ||
| 4.8 | Adjust clearance to manufactures standards | ||
| 5.0 | Sliding Counterweight: | ||
| 5.1 | Remove counter weight and inspect components | ||
| 5.2 | Repair as needed for proper operation | ||
| 6.0 | Turntables (T-1 and T-2): | ||
| 6.1 | Remove paint to bare metal (white metal) and non-destructive test (NDT) | ||
| 6.2 | Perform structural repairs per NDT test results | ||
| 6.3 | All repairs must be non-destructively tested | ||
| 6.4 | Remove pins and bushings | ||
| 6.5 | Measure the pin bosses with a micrometer | ||
| 6.6 | Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced | ||
| 6.7 | Paint inside and outside of components | ||
| 6.8 | Unit to be reassembled with all new fasteners | ||
| 6.9 | Install new hoses, wires, clamps and protection | 6.1 | |
| 6.10 | Install new limit switches | ||
| 6.11 | Perform service test on rotational bearings | ||
| 6.12 | Inspect rotation gearboxes and hydraulic motors | ||
| 6.13 | Inspect turret cylinder # 2 and repair as needed | ||
| 7.0 | Boom One: | ||
| 7.1 | Remove pins and bushings | ||
| 7.2 | Measure the pin bosses with a micrometer | ||
| 7.3 | Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced | ||
| 7.4 | Remove paint to bare metal (white metal) and non-destructive test (NDT) | ||
| 7.5 | Perform structural repairs per NDT test results | ||
| 7.6 | All repairs must be non-destructively tested | ||
| 7.7 | Paint inside and outside of components | ||
| 7.8 | Install new pins and bushings | ||
| 7.9 | Unit to be reassembled with all new fasteners | ||
| 7.10 | Install new hoses, wires, clamps and protection | ||
| 7.11 | Install new limit switches and new boom angle switches | ||
| 7.12 | Inspect boom cylinder #1 and repair as needed | ||
| 8.0 | Boom Two: | ||
| 8.1 | Remove pins and bushings | ||
| 8.2 | Measure the pin bosses with a micrometer | ||
| 8.3 | Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced | ||
| 8.4 | Remove paint to bare metal (white metal) and non-destructive test (NDT) | ||
| 8.5 | Perform structural repairs per NDT test results | ||
| 8.6 | All repairs must be non-destructively tested | ||
| 8.7 | Paint inside and outside of components | ||
| 8.8 | Install new pins and bushings | ||
| 8.9 | Unit to be reassembled with all new fasteners | ||
| 8.10 | Install new hoses, wires, clamps and protection | ||
| 8.11 | Install new limit switches and new boom angle switches | ||
| 8.12 | Inspect boom cylinder #2 and repair as needed | ||
| 9.0 | Boom Three and Catrac: | ||
| 9.1 | Install new rollers and bearings on boom three extension structures | ||
| 9.2 | Install extension cylinder mounting system | ||
| 9.3 | Remove pins and bushings | ||
| 9.4 | Measure the pin bosses with a micrometer | ||
| 9.5 | Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced | ||
| 9.6 | Remove paint to bare metal (white metal) and non-destructive test (NDT) | ||
| 9.7 | Perform structural repairs per NDT test results | ||
| 9.8 | All repairs must be non-destructively tested | ||
| 9.9 | Paint inside and outside of components | ||
| 9.10 | Install new pins and bushings | ||
| 9.11 | Unit to be reassembled with all new fasteners | ||
| 9.12 | Install new hoses, wires, clamps and protection | ||
| 9.13 | Install new limit switches and new boom angle switches (non mercury) | ||
| 9.14 | Replace wear pads | ||
| 9.15 | Inspect Catrac and cover and repair as needed | ||
| 9.16 | Inspect boom cylinder #3 and telescoping cylinders and repair as needed | ||
| 10.0 | Boom Four: | ||
| 10.1 | Remove pins and bushings | ||
| 10.2 | Measure the pin bosses with a micrometer | ||
| 10.3 | Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced | ||
| 10.4 | Remove paint to bare metal (white metal) and non-destructive test (NDT) | ||
| 10.5 | Perform structural repairs per NDT test results | ||
| 10.6 | All repairs must be non-destructively tested | ||
| 10.7 | Paint inside and outside of components | ||
| 10.8 | Install new pins and bushings in cylinders | ||
| 10.9 | Unit to be reassembled with all new fasteners | ||
| 10.10 | Install new hoses, wires, clamps and protection | ||
| 10.11 | Install new limit switches | ||
| 10.12 | Inspect Catrac and cover and repair as needed | ||
| 10.13 | Inspect boom cylinder #4 and telescoping cylinders and repair as needed | ||
| 11.0 | Platform: | ||
| 11.1 | Platform will be inspected and refurbished | ||
| 11.2 | New 110 and 12-volt outlets and wiring system installed | ||
| 11.3 | Install new grade 8 mounting bolts | ||
| 11.4 | Rebuild or replace Helac rotator | ||
| 11.5 | Inspect leveling cylinder and repair as needed | ||
| 12.0 | Boom Rest: | ||
| 12.1 | Install new stow pads | ||
| 12.2 | Install new platform rest pads and update rest as necessary | ||
| 13.0 | Control and Limit System: | ||
| 13.1 | All wires shall be replaced through booms and turntables | ||
| 13.2 | If system wiring is located at the fire wall and boom aeras will be relocated in a new LED box, mounted at turntable one | ||
| 13.3 | Unit shall have all new limit switches and foot switches installed | ||
| 13.4 | Unit shall have new control system cable installed | ||
| 13.5 | Controls shall be properly adjusted and settings recorded | ||
| 13.6 | Replace Intercom system | ||
| 13.7 | New circuit breaker and relay protection shall be installed | ||
| 13.8 | Replace coils and spools as needed | ||
| 14.0 | Hydraulic system and pumps: | ||
| 14.1 | Remove and replace hydraulic pumps | ||
| 14.2 | Install new PTO for main unit hydraulic pump | ||
| 14.3 | Install new hydraulic filters and oil | ||
| 14.4 | Set relief valves | ||
| 14.5 | Set all port relief valves | ||
| 14.6 | Set all controls to current factory settings | ||
| 14.7 | Service hydraulic oil cooler | ||
| 15.0 | Stability Testing: | ||
| 15.1 | Stability test unit to current ANSI A92.8 requirements | ||
| 15.2 | Operational test run unit on bridge | ||
| 16.0 | Miscellaneous: | ||
| 16.1 | All items removed from the cab, chassis and tower by vendor(frame ends, fuel tanks mirrors, etc..) remain the property of the State of Michigan and are to be returned with the truck | ||
| 16.2 | All wires passing through holes in metal or non-metal wearing surfaces, which could cause wear of the insulation, shall be adequately protected by rubber or plastic grommets, and/or non-metal conduit. | ||
| 16.3 | Ends of all wires shall be adequately anchored to prevent loosening | ||
| 16.4 | All electrical connections shall be soldered and enclosed in heat shrink or in water tight junction blocks | ||
| 16.5 | Scotch locks and wire nuts are not acceptable | ||
| 17.0 | Painting: | ||
| 17.1 | Repaint boom assemblies to match original color - Dupont 43106X or equivalent | ||
| 17.2 | Repaint deck as needed | ||
| 17.3 | Rust proof as needed | ||
| 17.4 | Install protective sleeves over hydraulic hose and electric wire at pivot points | ||
| 18.0 | Final Finish: | ||
| 18.1 | Install a complete set of operational, caution and warning decals | ||
| 18.2 | Testing of all AC and DC electrical systems | ||
| 18.3 | Operational test of all systems | ||
| 18.4 | Final adjustments to all system and components | ||
| END OF SPECIFICATION |