Specifications C10-0070UBR.20.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Twelve Year Under Bridge Inspection Unit Inspection/rebuild
Solicitation number
RFP 591 200000002067 1
Issued by
Grand Traverse County, Lansing City, Michigan

About this file

This is a specifications document from the State of Michigan for the 12-year inspection and rebuild of an Aspen A62 Under Bridge Inspection Unit (Serial Number 10156), identified as Specification C10-0070UBR.20. The document outlines comprehensive inspection, maintenance, and restoration requirements for this specialized equipment used for bridge inspections. The scope of work encompasses 18 major work categories including visual and operational inspections, chassis and sub-frame work, front and rear axle lock servicing, turntable refurbishment, four-boom assembly overhauls, platform restoration, control and limit system upgrades, hydraulic system replacement, and final testing and finishing. All work must comply with manufacturer standards and current ANSI A92.8 stability testing requirements, with final testing including operational verification on a bridge.

The specifications require bidders to respond with agreement or propose alternates for each work item. The scope includes mandatory non-destructive testing for critical structural components, replacement of worn components including pins, bushings, hoses, wires, and fasteners, complete repainting using Dupont 43106X or equivalent paint to match original colors, installation of new electrical systems and limit switches, full hydraulic system service with new filters and oil, and comprehensive stability and operational testing. All removed items from the cab, chassis, and tower remain state property and must be returned with the unit. Specific electrical connection standards are mandated, prohibiting scotch locks and wire nuts in favor of soldered connections with heat shrink or waterproof junction blocks. The document does not specify pricing, contract term, award date, or other commercial terms.

View the file

Other files

File Type Posted
RFP Purchasing Documents.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Specification # C10-0070UBR.20 Underbridge Inspection Unit, 12 year Inspection and Rebuild.Bidders Response (Agree or Alternate)
Under Bridge Inspection Unit:
Make: Aspen, A62 Serial number 10156
1.0Inspection and Reporting
1.1Perform visual/operation inspection
1.2Test control and intercom system to manufactures standards
1.3Test operational limit system to manufactures standard
1.4Visually inspect hydraulic cylinders for leaks and damage
1.5Inspect chassis lighting components
1.6Inspect counter weight ball screw, including motor and wear pads
2.0Chassis and Sub-frame:
2.1Inspect units sub-frame and chassis frame
2.2Replace deck side marker and rear lighting wiring
2.3Torque sub-frame mounting bolts
2.4Repair/replace access step and grab rails as needed
2.5Inspect master panel in truck and replace defective lights or switches as needed
2.6Ensure that there is proper circuit breaker relay protection installed between truck battery and unit
2.7Replace front and rear springs if needed
3.0Axle Locks - Front:
3.1Remove upper side plates, jaws, and pin rollers, bushings and lower axle lock assemblies
3.2Make required repairs
3.3Sand blast, perform magnetical particle test
3.4Repaint axle lock assemblies
3.5Install new bolts, nuts and structural fasteners to manufactures standards
3.6Adjust clearance to manufactures standards
4.0Axle Locks - Rear:
4.1Remove pins and bushings
4.2Replace spherical ball bushings as needed
4.3Replace upper yoke weldment
4.4Make required repairs as needed
4.5Sand blast, perform magnetical particle test
4.6Repaint axle lock assemblies
4.7Install new bolts, nuts and structural fasteners to manufactures standards
4.8Adjust clearance to manufactures standards
5.0Sliding Counterweight:
5.1Remove counter weight and inspect components
5.2Repair as needed for proper operation
6.0Turntables (T-1 and T-2):
6.1Remove paint to bare metal (white metal) and non-destructive test (NDT)
6.2Perform structural repairs per NDT test results
6.3All repairs must be non-destructively tested
6.4Remove pins and bushings
6.5Measure the pin bosses with a micrometer
6.6Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
6.7Paint inside and outside of components
6.8Unit to be reassembled with all new fasteners
6.9Install new hoses, wires, clamps and protection6.1
6.10Install new limit switches
6.11Perform service test on rotational bearings
6.12Inspect rotation gearboxes and hydraulic motors
6.13Inspect turret cylinder # 2 and repair as needed
7.0Boom One:
7.1Remove pins and bushings
7.2Measure the pin bosses with a micrometer
7.3Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
7.4Remove paint to bare metal (white metal) and non-destructive test (NDT)
7.5Perform structural repairs per NDT test results
7.6All repairs must be non-destructively tested
7.7Paint inside and outside of components
7.8Install new pins and bushings
7.9Unit to be reassembled with all new fasteners
7.10Install new hoses, wires, clamps and protection
7.11Install new limit switches and new boom angle switches
7.12Inspect boom cylinder #1 and repair as needed
8.0Boom Two:
8.1Remove pins and bushings
8.2Measure the pin bosses with a micrometer
8.3Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
8.4Remove paint to bare metal (white metal) and non-destructive test (NDT)
8.5Perform structural repairs per NDT test results
8.6All repairs must be non-destructively tested
8.7Paint inside and outside of components
8.8Install new pins and bushings
8.9Unit to be reassembled with all new fasteners
8.10Install new hoses, wires, clamps and protection
8.11Install new limit switches and new boom angle switches
8.12Inspect boom cylinder #2 and repair as needed
9.0Boom Three and Catrac:
9.1Install new rollers and bearings on boom three extension structures
9.2Install extension cylinder mounting system
9.3Remove pins and bushings
9.4Measure the pin bosses with a micrometer
9.5Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
9.6Remove paint to bare metal (white metal) and non-destructive test (NDT)
9.7Perform structural repairs per NDT test results
9.8All repairs must be non-destructively tested
9.9Paint inside and outside of components
9.10Install new pins and bushings
9.11Unit to be reassembled with all new fasteners
9.12Install new hoses, wires, clamps and protection
9.13Install new limit switches and new boom angle switches (non mercury)
9.14Replace wear pads
9.15Inspect Catrac and cover and repair as needed
9.16Inspect boom cylinder #3 and telescoping cylinders and repair as needed
10.0Boom Four:
10.1Remove pins and bushings
10.2Measure the pin bosses with a micrometer
10.3Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
10.4Remove paint to bare metal (white metal) and non-destructive test (NDT)
10.5Perform structural repairs per NDT test results
10.6All repairs must be non-destructively tested
10.7Paint inside and outside of components
10.8Install new pins and bushings in cylinders
10.9Unit to be reassembled with all new fasteners
10.10Install new hoses, wires, clamps and protection
10.11Install new limit switches
10.12Inspect Catrac and cover and repair as needed
10.13Inspect boom cylinder #4 and telescoping cylinders and repair as needed
11.0Platform:
11.1Platform will be inspected and refurbished
11.2New 110 and 12-volt outlets and wiring system installed
11.3Install new grade 8 mounting bolts
11.4Rebuild or replace Helac rotator
11.5Inspect leveling cylinder and repair as needed
12.0Boom Rest:
12.1Install new stow pads
12.2Install new platform rest pads and update rest as necessary
13.0Control and Limit System:
13.1All wires shall be replaced through booms and turntables
13.2If system wiring is located at the fire wall and boom aeras will be relocated in a new LED box, mounted at turntable one
13.3Unit shall have all new limit switches and foot switches installed
13.4Unit shall have new control system cable installed
13.5Controls shall be properly adjusted and settings recorded
13.6Replace Intercom system
13.7New circuit breaker and relay protection shall be installed
13.8Replace coils and spools as needed
14.0Hydraulic system and pumps:
14.1Remove and replace hydraulic pumps
14.2Install new PTO for main unit hydraulic pump
14.3Install new hydraulic filters and oil
14.4Set relief valves
14.5Set all port relief valves
14.6Set all controls to current factory settings
14.7Service hydraulic oil cooler
15.0Stability Testing:
15.1Stability test unit to current ANSI A92.8 requirements
15.2Operational test run unit on bridge
16.0Miscellaneous:
16.1All items removed from the cab, chassis and tower by vendor(frame ends, fuel tanks mirrors, etc..) remain the property of the State of Michigan and are to be returned with the truck
16.2All wires passing through holes in metal or non-metal wearing surfaces, which could cause wear of the insulation, shall be adequately protected by rubber or plastic grommets, and/or non-metal conduit.
16.3Ends of all wires shall be adequately anchored to prevent loosening
16.4All electrical connections shall be soldered and enclosed in heat shrink or in water tight junction blocks
16.5Scotch locks and wire nuts are not acceptable
17.0Painting:
17.1Repaint boom assemblies to match original color - Dupont 43106X or equivalent
17.2Repaint deck as needed
17.3Rust proof as needed
17.4Install protective sleeves over hydraulic hose and electric wire at pivot points
18.0Final Finish:
18.1Install a complete set of operational, caution and warning decals
18.2Testing of all AC and DC electrical systems
18.3Operational test of all systems
18.4Final adjustments to all system and components
END OF SPECIFICATION