Specifications B3.pdf

PDF 2 MB Posted

Attached to
Heated Refueler Bay Federal contract opportunity
Solicitation number
W50S8S-20-B-0001
Issued by
Department of the Army National Guard

About this file

This is a pre-solicitation notice for a federal construction contract. The 180th Fighter Wing Contracting Office at Toledo Air National Guard Base is seeking to construct a heated vehicle operations parking structure to house two refueling vehicles and protect them from frozen temperatures and heavy snow accumulation. The project includes appropriate spill containment, lightning protection, fire protection, heating and ventilation, and compliance with NEC hazard classification requirements. Existing utilities, pavements, fencing and landscaping will also be modified to accommodate the new facility. The construction duration is 270 calendar days with a total contract period ending no later than December 31, 2020. The NAICS code is 236220 with a size standard of $36.5 million in average annual revenue. The magnitude is estimated between $500,000 to $1 million. The solicitation will be issued on or around July 15, 2020 with a pre-bid conference on July 22, 2020. Bids must be submitted by August 17, 2020. Funds are anticipated but not yet available through September 30, 2020. The award will be a total small business set-aside to the responsible bidder offering the most advantageous price.

View the file

Other files for this federal contract opportunity

Other files attached to Heated Refueler Bay, newest first.
File Type Posted
Drawings 24x36 -Part 1.pdf PDF
Drawings 24x36 -Part 2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

HEATED VEHICLE OPERATIONS PARKING STRUCTURE

OWNER'S PROJECT NUMBER: WYTD182052

TOLEDO AIR NATIONAL GUARD BASE

2660 E EBER ROAD

SWANTON, OHIO, 43558

04/13/2020

PREPARED BY:

WANIX ARCHITECTS

PART 1 GENERAL

1.1 PROJECT IDENTIFICATION

SECTION 000102

PROJECT INFORMATION

A. Project Name: Heated Vehicle Operations Parking Structure

B. Owner's Project Number: WYTD 182052

Project Address:

2660 E Eber Road

Swanton, Oh 43558

C. The Owner, hereinafter referred to as Owner: Toledo Air National Guard Base

1.2 NOTICE TO PROSPECTIVE BIDDERS

A. These documents constitute an Invitation to Bid to and request for qualifications from General Contractors for the construction of the project described below.

1.3 PROJECT DESCRIPTION

A. Summary Project Description:

Construct a facility to house two refueling vehicles and protect them from frozen temperatures and heavy snow accumulation. Install appropriate spill containment, lightning protection, fire protection, heating and ventilation and comply with NEC hazard classification requirements. Modify existing utilities, pavements, fencing and landscaping as need to accommodate new facility.

B. Contract Scope: Construction and demolition.

C. Contract Terms: Lump sum (fixed price, stipulated sum).

1.4 PROJECT CONSULTANTS

A. The Architect: Wanix Architects, LLC.

1. Address: 4208 Prospect Ave., Cleveland, OH 44103.

B. The Engineer: REWarner & Associates

1. Address: 25777 Detroit Road

1.5 CONTRACT TYPE

A. Firm Fixed Price contract

END OF SECTION

Heated Vehicle Operations

Parking Structure 000102 - 1 Project Information

000110 - 1 Table of Contents

SECTION 000110

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

000101 - Project Title Page

000102 - Project Information

000110 - Table of Contents

SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

011000 – General Requirements

016000 - Product Requirements

018000 – Environmental Requirements and References

DIVISION 02 -- EXISTING CONDITIONS

DIVISION 03 -- CONCRETE

033000 - Cast-in-Place Concrete

033511 - Concrete Floor Finishes

DIVISION 04 -- MASONRY (NOT USED)

DIVISION 05 -- METALS

055000 - Metal Fabrications

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES (NOT USED)

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

076200 - Sheet Metal Flashing and Trim

077123 - Manufactured Gutters and Downspouts

079200 - Joint Sealants

DIVISION 08 -- OPENINGS

080671 - Door Hardware Schedule

081113 - Hollow Metal Doors and Frames

083613 - Sectional Doors

087100 - Door Hardware

089100 - Louvers

DIVISION 09 -- FINISHES

092116 - Gypsum Board Assemblies

092216 - Non-Structural Metal Framing

099123 - Interior Painting

DIVISION 10 -- SPECIALTIES (NOT USED)

DIVISION 11 -- EQUIPMENT (NOT USED)

DIVISION 12 -- FURNISHINGS (NOT USED)

000110 - 2 Table of Contents

DIVISION 13 -- SPECIAL CONSTRUCTION

133419 - Metal Building Systems

DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)

DIVISION 21 -- FIRE SUPPRESSION (NOTE USED)

DIVISION 22 -- PLUMBING

221316 - Sanitary Waste and Vent Piping

221319 - Sanitary Waste Piping Specialties

DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

230513 - Common Motor Requirements for HVAC Equipment

230529 - Hangers and Supports for HVAC Piping and Equipment

230553 - Identification for HVAC Piping and Equipment

230593 - Testing, Adjusting, and Balancing for HVAC

230900 - Instrumentation and Control for HVAC

230993 - Sequence of Operations for HVAC Controls

231123 - Facility Natural-Gas Piping

233113 - Metal Ducts

233300 - Air Duct Accessories

233423 - HVAC Power Ventilators

233713.23 - Air Registers and Grilles

235416.23 - Gas Fired Equipment

DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 -- ELECTRICAL

260519 - Low-Voltage Electrical Power Conductors and Cables

260526 - Grounding and Bonding for Electrical Systems

260529 - Hangers and Supports for Electrical Systems

260533 - Raceways and Boxes for Electrical Systems

260543- Under ground Ducts and Raceway for Electrical Systems

260544- Sleeves and Sleeve Seals for Electrical Raceway and Cabling

260553 - Identification for Electrical Systems

260923 - Lighting Control Devices - Lutron

262726 - Wiring Devices

262813 - Fuses

262816 - Enclosed Switches and Circuit Breakers

263600 - Transfer Switches

264113 - Lightning Protection for Structures

265119 - LED Interior Lighting

265219 - Emergency and Exit Lighting

265619 - LED Exterior Lighting

DIVISION 27 -- COMMUNICATIONS (NOT USED)

000110 - 3 Table of Contents

DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY (NOT USED)

DIVISION 31 -- EARTHWORK

311000 - Site Clearing

312000 - Earth Moving

DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED)

DIVISION 33 – UTILITIES (NOTE USED)

DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT (NOT USED)

Parking Structure 011000 - 1 Summary

SECTION 011000

GENERAL REQUIREMENTS

PART 1 INSURANCE

REFER TO SOLICITATION DOCUMENTS

PART 2 ORDER OF PRECEDENCE (REFERENCE FAR 52.236-21)

REFER TO SOLICITATION DOCUMENTS

PART 3 SCHEDULING

REFER TO SOLICITATION DOCUMENTS

PART 4 INVOICING AND PAYMENT

REFER TO SOLICITATION DOCUMENTS

PART 5 CONTRACT ADMINISTRATIONS

REFER TO SOLICITATION DOCUMENTS

PART 6 PAPERLESS CONTRACTING

REFER TO SOLICITATION DOCUMENTS

PART 7 TELEPHONE COMMUNICATIONS SECURITY MONITORING

REFER TO SOLICITATION DOCUMENTS

PART 8 UTILITY SERVICES

The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets area available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14). The following utilities will be available: Water and Electrical

PART 9 PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The contractor shall submit all materials and articles requiring approval, as required by the Material and Workmanship Clause, FAR 52.236‐5. Submittals shall be made using AF Form 3000, or approved equal. Submittals shall be processed in accordance with the procedure in section 016000.

Submittals shall be given a distinct identification system by CLIN if multiple CLINs are applicable.

Individual submittal documents shall not be comprised of items for more than one CLIN. Address for delivery of submittals will be provided at the post award/pre‐construction conference. The contractor is reminded that an individual within the company who has authority to make the certification must sign the certification on the AF form 3000.

PART 10 WORK PROGRESS AND PREPARATION OF PROGRES SCHEDULES AD REORTS

A. A bi-weekly meeting wil be held with the contractor, COR and Contracting Officer (KO), if nedessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. The Contractor shall record meeting minutes and distribute to attendees within 48 hours after the meeting. Agenda items shall include, but not limited to the following:

a) Schedule and Progress with two week look ahead

b) Submittals

c) RFI’s

d) RFP’s/Modifications

Parking Structure 011000 - 2 Summary

e) OC deficiencies and activities

f) Safety

g) Planned utility interruptions

B. In accordance with FAR Clause 52.236-15, “Schedule for Construction Contracts”, the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval three copies of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer generated format similar to the AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. Both the Contractor and COR are required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer. This reports shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer generated format. These reports shall tract progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes.

C. The contractor shall prepare a work progress schedule required for completion of each of the various division of work. Updated plans and Form 3064 showing work progress (hardcopy and formatted diskette or CD, or email file copy), unless otherwise directed by the Contracting Officer, shall be provided Bi-weekly if there are possible deviations from the original plan, those must be noted and approved by the Contracting Officer before work changes are implemented. The schedule shall be submitted to the Contracting Officer, in the number of copies as directed. Reference Contract Clause FAR 52.236-15, “Schedule for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, “Contract Progress Schedule” and a National Guard Contract Progress Report”.

PART 11 NOTICE OF COMPLETION OF CONSTRUCTION/PRE-FINAL AND FINAL INSPECTION

A. The contractor shall conduct a pre-final inspection in the presence of the Contracting Officer’s Representative (COR) prior to the date schedule for final inspection. Any discrepancies noted shall be corrected prior to Final Inspection

B. The contractor shall request scheduling of a final inspection in writing to the Contracting Officer at least five (5) working days prior to the desired date or as otherwise negotiated with the Contracting Office.

C. Contracting Officer will perform the final inspection in the presence of the contractor, and any discrepancies noted shall be corrected within the time specified by the Contracting Officer.

D. Final Inspection shall not constitute acceptance of a project unless so stipulated by issuance of a separate acceptance notice

E. The contractor is cautioned to ensure they have completed adequate Quality Control reviews prior to scheduling pre-final or final inspections. In the event the Contracting Officer finds that the project is not ready for the applicable inspection, (too many discrepancies)the

Parking Structure 011000 - 3 Summary contractor may be held liable for the costs of a repeat inspection. In the inspection involves A/E personnel these costs may include additional labor, travel and miscellaneous expenses.

PART 12 DESIGNATION OF TECHNICAL REPRESENTATIVE

REFER TO SOLICITATION DOCUMENTS

PART 13 CONTRACTOR STAFF AND EMPLOYEES

REFER TO SOLICITATION DOCUMENTS

PART 14 CONTRACTOR OFFICE AND STORAGE

A. Parking of contractor vehicles shall be restricted to the contractor’s designated on-site or the work area. The company name shall be prominently displayed on all construction vehicles parked on the job site.

B. Security of material storage areas on the job site shall be the responsibility of the contractor. The area shall be kept neat and orderly and free of debris.

PART 15 RECORD DRAWINGS

During construction of a project and on the job site, the contractor shall maintain a completed record of all changes and corrections from the layout shown on the drawings, if applicable. The contractor shall enter such changes and corrections on contract or record drawings promptly, and submit the ‘red line’ drawings to the Contracting Officer upon completion of the project. The record drawings shall indicate all changes and corrections concerning the actual locations of all sub‐surface utility lines. In order for the location of these lines and appurtenances to be determined in the event the surface opening or indictors become covered or obscured, the record drawings shall show, by offset dimensions or two permanently fixed surface features, the end of the each run including each change in direction. Valves splice boxes, and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded. The Government does not guarantee the accuracy of existing record drawings; it is the contractor’s responsibility to verify all as built conditions.

PART 16 VERIFICATION OF DIMENSIONS

The contractor shall be responsible for the coordination and proper relation of all aspects of the work. He/she shall field verify all dimensions and advise Contracting Officer of any discrepancies prior to proceeding with any phase of the work. Where exact locations are not given for the positioning of equipment and devices, they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts.

PART 17 SECURITY REQUIREMENTS

A. The contractor shall comply with all security regulations imposed by the base/post commander and/or agency occupying the space where work is performed. Any necessary security clearances shall be obtained prior to commencement of work

B. It is expected that new security requirements to satisfy contractor personal identification requirements in Homeland Security Presidential Directive (HSPD-12), ‘Policy for a Common Identification Standard for Federal Employees and Contractors.” And Federal Information Processing Standards Publication (FIPS PUB) Number 201, “Personal Identity Verification (PIV) of Federal Employees and Contractors” are incorporated in the life of this contract.

Contractor shall comply with all requirements, at no additional cost to the Government.

C. The contractor shall ensure that all parts of the facility where work is being performed are adequately protected against vandalism and theft.

Parking Structure 011000 - 4 Summary

D. Contractors shall follow instructions provided by the Security Forces for access to the 180th FW. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer. Be sure that all of your employees have the proper ID (driver’s license, state ID, immigration card, US Passport, etc.) If they do not have the proper ID, they will be turned away.

E. The Prime Contractor and all of its subcontractors will be required to wear orange or lime colored safety vests while performing work on the installation

F. U. S. Government will not be held liable for any delays or breach of contract caused by refusal of the Security Forces to allow entry.

G. All Prospective Contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and area authorized by the US government to work in the United States (i.e. Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of U.S. government issued photo identification (driver’s license, U.S. Passport, U.S. work visa, etc.) for entry to the installation. Security Forces will review any questionable identification documents for determination as to whether or not said identification is authorized for access to the installation.

H. All prospective contractors/contractor employees, once it has been established that they maintain the appropriate credential as described in one above, are subject to a Criminal History Check.

I. Note: for the purposes of the contracting services, it is implied that, that any and all parties agree to a Criminal History Background Check once entered into any contract. Any documents that are provided and found fraudulent to include, but not limited to driver’s license, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.

J. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within a National Guard controlled installation, facility or area.

All contractor employees, to include subcontractor employees, requiring access to National Guard installations, facilities and controlled access shall complete AT Level I awareness training. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Contracting Officer’s Reprehensive (COR).

At Level I awareness training is available at the following website:

https://atlevel1.dtic.mil/at

AT/OPSEC

K. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contacting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy.

Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

Parking Structure 011000 - 5 Summary

L. For contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI31- 101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

M. AT Level I Training. This standard language is for contractor employees with an area of performances within a Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT Level I Awareness Training is available at the following website: http://jko.jten.mil

PART 18 REGULATIONS

REFER TO SOLICITATION DOCUMENTS

PART 19 TRANSPORTATION, HANDLING AND STORAGE

A. The contractor shall coordinate with suppliers and shippers to ensure that incoming materials are properly identified with the contractor’s name, contract number and project title. The contractor shall designate an authorized individual to be available to receive shipment. The Government will not provide storage other than that available at the project site.

B. Storage of supplies, materials and equipment on the project site shall be accomplished in such a manner so as to prevent mechanical and climatic damage and loss due to vandalism or theft. Equipment temporarily removed in the performance of work and stored on the job site shall be stored and protected in accordance with previous paragraphs, and shall be replace in a condition compatible with its original state. Security for equipment and material removed from the job site for the temporary storage until reuse shall be responsibility of the contractor.

PART 20 CLEANUP AND DISPOSAL OF DEBRIS AND FILL MATERIALS

A. At the end of each workday, the contractor shall clean up the work and starage areas and stack all material in a manner approved by the Contracting Officer or COR. Upon completion of a project, the contractor shall ensure that all dirt, trash and debris resulting from the construction operations are removed from the work area. Unless directed otherwise in the contractor by the Contracting Officer, disposal of debris shall be made at the contractor’s expense and shall be delivered to a state approved disposal site located off base. Debris shall not be left in such a manner that wind or other weather conditions can cause the debris to be the scattered outside the work area (i.e. on nearby runways, driveways, buildings)

B. The hauling and disposal of excess fill material including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be the responsibility of the contractor. Disposal shall be in accordance with applicable state and local regulations.

Parking Structure 011000 - 6 Summary

PART 21 ENVIOROMNETAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state and local laws, ordinances, regulations, court orders and other types of rulings having the effect of the law. Should the united

States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal any hazardous waste, the contractor shall reimburse the Government all such liability.

SEE SECTION 018000 ENVIRONMENT REQUIREMENTS FOR MORE INFORMATION.

PART 22 HAZARDOUS MATERIALS

A. Any material suspected of being hazardous of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the Contractor to perform the test, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the term of the contract.

B. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in the project area. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize of reduce to powder when dry. Non-friable asbestos-containing materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating. Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handing and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance project.

PART 23 POLLUTION ABATEMENT

A. All work shall be performed in a manner minimizing pollution of air, water and land as required.

B. Transporting materials to or from the site shall be accomplished in a manner preventing materials or particles from becoming airborne. Earth materials shall be wetted or otherwise protected. Gravel, sand and concrete shall be contained within vehicles to prevent spillage.

Tarpaulins must be fastened over load before entering surrounding streets. Removal of any materials dropped or blown off vehicles shall be the responsibility of the contractor.

C. Burning of any material is strictly prohibited.

D. Stream beds, lakes, drainage ways, sanitary and storm sewers, etc., shall not be polluted by fuels, oils, bitumen, acids or other harmful materials. Grading shall be accomplished to prevent surface drainage from the construction site containing harmful amounts of sediment from drawing onto adjacent areas.

E. Flushing of concrete trucks is restricted to the location specifically designed for this purpose by the Contracting Officer’s Representative.

F. Excess mortar, plaster or drywall materials shall not be disposed of on Government property. Water utilized for plastering or drywall equipment shall be disposed of in

Parking Structure 011000 - 7 Summary accordance with the instructions of the COR, and under no circumstances shall water be disposed of in areas which are planted or scheduled to be planted.

016000 - 1 Product Requirements

PART 1 GENERAL

SECTION 016000 - PRODUCT REQUIREMENTS

1.1 SECTION INCLUDES

A. General product requirements.

B. Transportation, handling, storage and protection.

C. Product option requirements.

D. Substitution limitations.

E. Maintenance materials, including extra materials, spare parts, tools, and software.

1.2 RELATED REQUIREMENTS

A. Section 011000 - Summary: Lists of products to be removed from existing building.

B. Solicitation Requirement.

1.3 SUBMITTALS

A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.

PART 2 PRODUCTS

2.1 NEW PRODUCTS

A. Provide new products unless specifically required or permitted by Contract Documents.

B. Use of products having any of the following characteristics is not permitted:

1. Made outside the United States, its territories, Canada, or Mexico.

2. Made using or containing CFC's or HCFC's.

3. Made of wood from newly cut old growth timber.

4. Containing lead, cadmium or asbestos.

C. Where other criteria are met, Contractor shall give preference to products that:

1. If used on interior, have lower emissions, as defined in Section 016116.

2. If wet-applied, have lower VOC content, as defined in Section 016116.

2.2 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

016000 - 2 Product Requirements

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.

2.3 MAINTENANCE MATERIALS

A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.

B. Deliver to Project site; obtain receipt prior to final payment.

PART 3 EXECUTION

3.1 SUBSTITUTION LIMITATIONS

A. See Section 01100 Substitution Procedures and solicitation requirement.

3.2 TRANSPORTATION AND HANDLING

A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.

B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.

C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

D. Transport and handle products in accordance with manufacturer's instructions.

E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.

H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.

3.3 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. See Section 017419.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. Store sensitive products in weather tight, climate-controlled enclosures in an environment favorable to product.

E. For exterior storage of fabricated products, place on sloped supports above ground.

F. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.

G. Comply with manufacturer's warranty conditions, if any.

H. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

I. Prevent contact with material that may cause corrosion, discoloration, or staining.

016000 - 3 Product Requirements

J. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

K. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

Heated Vehicle Operations Parking Structure 018000 - 1 Environmental Requirements and

References

SECTION 018000

ENVIRONMENTAL REQUIREMENTS AND REFERENCES

1. WING ENVIRONMENAL COMMITMENT STATEMENT

1.1 The 180th Fighter Wing (FW) mission is to provide for America; protection of the homeland, effective combat power and defense support to civil authorities, while developing Airmen, sup-porting their families and serving in the community. Activities at the 180th FW include operating and maintaining F-16 fighter aircraft, corrosion control, aerospace ground equipment, vehicle maintenance, facilities maintenance, and administrative support. The 180th FW is committed to conducting its mission in an environmentally responsible manner that will protect human health, natural resources, and the environment. In doing so, we will strive for compliance with all Fed-eral, state, and local environmental laws and regulations, as well as Executive Orders, Air Force Policy Directive 90-8, Environment, Safety & Occupational Health Management and Risk Man-agement, Air Force Instructions, and other guidance applicable to the conduct of our mission and strive for continual improvement in our environmental performance. This commitment goes be-yond compliance with the law and encompasses the integration of sound environmental infor-mation and practices into our daily decisions and activities at all levels. We have in the past, and will continue in the future, to pursue a course of responsible environmental stewardship. In sup-port of our environmental commitment, we will:

• Maintain an effective environmental management system, promote the use of safe technolo-gies and operating practices, and remain ready to respond to emergencies in order to im-prove our environmental performance and minimize adverse impacts to installation workers, their families, and the environment.

• Use the cooperative efforts of the Wing’s environmental professionals and multi-discipline environmental working groups and committees to set and review environmental goals, ob-jectives, and targets, measure progress, take corrective action when necessary, and com-municate results and other environmental information regarding the installation's operations and its environmental accomplishments to workers, the community, suppliers, regulators and the public.

• Working in partnership with all stakeholders, investigate and evaluate new and innovative technologies and practices as appropriate, establish and implement an effective pollution prevention program, minimize the generation of wastes, recycle materials otherwise destined to become waste when possible, and dispose of any remaining wastes in an environmentally responsible manner.

• Ensure the responsible use of energy throughout the installation, including the adoption of innovative practices and procedures that will conserve energy and improve energy efficien-cy.

• Promote the conservation and sustainable use of natural and manmade materials.

• Provide regular operation-specific environmental performance reviews and assessments, de-velop plans to address actual or potential noncompliance situations, and build environmental concerns into all policies, programs, and missions.

1.2 Compliance with this environmental commitment statement is the responsibility of everyone supporting this Wing including military, state, and civilian employees, contractors, and vendors in accordance with his or her role and responsibilities in the organization. This commitment will be communicated to the public through posting on the Wing’s public website.

Structure 018000 - 2 Environmental Requirements and

1.3 The Wing commander’s environmental commitment statement applies to EVERYONE working at the 180th Fighter Wing including designers and contractors.

1.4 The Wing’s Environmental Management System is a continuous process designed to identify, prioritize, manage, and check progress towards meeting the Wing’s organizational and environmental goals, minimizing environmental risk, and identifying areas for continual improvement.

1.5 The 180th FW’s Environmental Commitment Statement (available from EM) and EMS will be briefed at all kickoff meetings.

1.6 The Office of Primary Responsibility (OPR) for this document is the 180th Environmental Management Office (EMO).

1.7 Questions related to this document should be addressed to the 180th Fighter Wing Environmental

Management Office at (419) 868-4270.

2. PERMIT REQUIREMENTS

2.1 Designer shall identify all environmental permit requirements, prepare all draft environmental permit applications and/or provide the necessary information to complete environmental permitting. Required environmental permits include (but are not limited to):

2.1.1 Air Program

• Permit-by-rule notification for fire pumps and emergency generators over 50 BHP

• Permit-by-rule notification for boilers/furnaces over 10 MMBTU

• Permit-to-install/permit-to-operate for spray paint booths fugitive emissions sources, etc.

2.1.2 Sanitary Sewage

• PTI/PTO for new sanitary sewage service connections, lift stations; a PTI/PTO is typically not required for interior renovation where a new service connection is not installed.

2.1.3 Storm Water

• Notice of Intent (NOI) for construction storm water discharge.

• Notice of Termination (NOT) at Project close-out.

2.1.4 Wetlands

• Wetlands 401/404 permits.

2.1.5 Asbestos

• Inspection and demolition notifications

• NOTE: All demolition projects and certain renovation projects require an asbestos notification, regardless of whether asbestos is involved. See Paragraph 13 of this section for additional details.

2.1.6 Storage Tanks

• Permit to install (State Fire Marshal)

2.2 Designer will provide draft permit applications to EM for review no later than the 60% design submission. Final permit applications will be provided to EM for submission to the appropriate regulatory agency no later than the 100% design submission. Provide copies of any written correspondence with regulatory agencies to EM. Permits will be signed by Wing Commander with EM as the technical contact.

Structure 018000 - 3 Environmental Requirements and

2.3 Designer will identify permit costs in the project’s working cost estimate; required permits are to be included as part of the maximum construction cost (MCC) and permits will be paid by the Government using construction funds.

EXCEPTION: Contractor shall be responsible for developing, submitting, and paying all costs associated with storm water permitting (i.e. Notice of Intent (NOI)). The contractor will be the primary responsible party for all issues associated with storm water permits. A copy of all permits and correspondence should be provided to EM.

2.4 Contractor shall identify any specific brands, models, serial numbers, capacities, etc. needed to complete the required environmental permit applications.

2.5 No project site work shall start until all required environmental permits have been submitted to, and approved by, the appropriate regulatory agency.

3. GREEN PROCUREMENT PROGRAM

3.1 NOTE: The contracting officer should be notified if the provisions of this section conflict with other guidance.

3.2 Designer will incorporate the use of recycled materials and energy-efficient equipment to the maximum extent possible. Green procurement programs are mandated by Executive Orders and directed by several Federal Acquisition Regulation clauses to include:

3.2.1 EO 13693, Planning for Federal Sustainability in the Next Decade. The goal of EO 13693 is to maintain Federal leadership in sustainability and greenhouse gas emission reductions.

3.2.2 Federal Acquisition Regulation (FAR), including Defense FAR and Air Force FAR:

• 52.223-1 -- Biobased Product Certification

• 52.223-2 -- Affirmative Procurement of Biobased Products Under Service and Construction

Contracts

• 52.223-3 -- Hazardous Material Identification and Material Safety Data.

• 52.223-4 -- Recovered Material Certification.

• 52.223-5 -- Pollution Prevention and Right-to-Know Information.

• 52.223-7 -- Notice of Radioactive Materials.

• 52.223-9 -- Estimate of Percentage of Recovered Material Content for EPA Designated

Products.

• 52.223-10 -- Waste Reduction Program.

• 52.223-11 -- Ozone-Depleting Substances.

• 52.223-12 -- Refrigeration Equipment and Air Conditioners.

• 52.223-13 -- Certification of Toxic Chemical Release Reporting.

• 52.223-14 -- Toxic Chemical Release Reporting.

• 52.223-15 -- Energy Efficiency in Energy-Consuming Products.

• 52.223-16 -- IEEE 1680 Standard for the Environmental Assessment of Personal Computer

Products.

• 52.223-17 -- Affirmative Procurement of EPA-designated Items in Service and Construction

Contracts.

• 52.204-4 -- Printed or Copied Double-Sided on Recycled Paper.

• 252.223-7001 Hazard Warning Labels. ------(DFAR)

• 252.223-7006 Prohibition on Storage and Disposal of Toxic and Hazardous Materials.-----

(DFAR)

Structure 018000 - 4 Environmental Requirements and

• 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS).---

(AFFAR)

3.3 In addition to the above Executive Orders, certain laws concern green procurement and mandate the specific procurement of supplies/services. For example:

3.3.1 Section 6002 of the Resources Conservation and Recovery Act (RCRA) requires federal agencies to comply with the Environmental Protection Agency’s (EPA’s) regulation concerning procurement of items composed of recovered materials. EPA’s “Buy Recycled” program requires the purchase of recycled content products for specific designated products.

3.3.2 The U.S. Department of Agriculture (USDA)’s “BioPreferred” program, under Section 9002 of the Farm Security and Rural Investment Act, requires the purchase of biobased products for specific designated products.

3.3.3 The Energy Policy Act of 2005 (EPAct 2005) requires Federal agencies to purchase ENERGY STAR® and Federal Energy Management Program (FEMP)-designated products.

3.3.4 The Energy Independence and Security Act of 2007 requires agencies to purchase electronic products that use one watt or power in stand-by mode. It also has several requirements regarding energy efficiency in Federal buildings, including the purchase and installation of energy efficient lighting.

3.4 The information provided in this section is for general guidance only; for specific information on green procurement programs, the following sites should be referenced:

3.4.1 EPA's Comprehensive Procurement Guidelines;

http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm

3.4.2 USDA's BioPreferred Designated Products;

http://www.biopreferred.gov/ProposedAndFinalItemDesignations.aspx

3.4.3 ENERGY STAR; http://www.energystar.gov/index.cfm?fuseaction=find_a_product.

3.4.4 The Federal Energy Management Program;

http://www1.eere.energy.gov/femp/pdfs/eep_productfactsheet.pdf

3.4.5 EPA's WaterSense; http://epa.gov/watersense/

3.4.6 Significant New Alternatives Policy (SNAP) Program;

http://www.epa.gov/ozone/snap/lists/index.html

3.5 Comprehensive Procurement Guidelines. All non-chemical products proposed for use under this contract must conform to the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) if the products are EPA-designated. It is desirable for products that meet the desired objective (e.g., ability to clean effectively) and are not CPG-designated items also containing the highest possible amounts (by percentage) of recovered material(s) and postconsumer content.

3.6 Designer will provide written justification for deviations from the CPG. Acceptable reasons for deviation include:

3.6.1 Material is not available competitively within the required timeframe.

3.6.2 Material does not meet appropriate performance standards.

3.6.3 Material is not available at reasonable pricing.

3.7 The following tables provide the required recovered content and/or minimum requirements for

Structure 018000 - 5 Environmental Requirements and common building materials. Reference the CPG website for additional information.

Category Product Product Type Content Levels Building Construction, Renovation, and Maintenance

Building insulation (R, ES)

Rock wool

75% recovered slag

Fiberglass 20-25% recovered glass

Cellulose loose-fill and spray-on 75% postconsumer paper

Perlite composite board 23% postconsumer paper

Rigid foam 9% recovered material

Foam-in-place 5% recovered material

Glass fiber reinforced 6% recovered material

Phenolic rigid foam 5% recovered material

Plastic, non-woven batt

100% recovered and/or postcon-sumer plastics

Plastic Insulating Foam for Residential and Com-mercial Construction (BP)

7% - Minimum Biobased Content

Cement and concrete (R) Coal fly ash

See EPA guidance at www.epa.gov/cpg

Ground granulated blast furnace slag www.epa.gov/cpg

Cenospheres

Sililca fume www.epa.gov/cpg

Composite Panels (BP) Acoustical 37% - Minimum Biobased Content

Interior Panels 55% - Minimum Biobased Content

Plastic Lumber 23% - Minimum Biobased Content

Structural Interior Panels 89% - Minimum Biobased Content

Structural Wall Panels 94% - Minimum Biobased Content

Floor tiles (R) 90-100% postconsumer rubber

90-100% recovered plastic

Flowable fill (R) www.epa.gov/cpg

Laminated paperboard (R) Paperboard 100% postconsumer paper

Structural fiberboard Paper 80-100% recovered material

Modular threshold ramps (R) Steel

25-100% recovered steel, including 16-67% postconsumer content

Aluminum 10% recovered aluminum

Rubber 100% postconsumer rubber

Nonpressure pipes (R) Steel

HDPE

100% postconsumer High Density Polyethylene

PVC

25-100% recovered Polyvinyl Chloride, including 5-15% post-consumer content

Concrete

Structure 018000 - 6 Environmental Requirements and

Patio blocks (R) Rubber 90-100% postconsumer rubber or rubber blends

Plastic

90-100% recovered plastic or plas-tic blends

Roofing materials (R, BP, ES/FEMP) Steel

Aluminum www.epa.gov/cpg 20-90% recovered aluminum, in-cluding 20-90% postconsumer content

Fiber

50-100% recovered fiber or fiber composite, including 50-100% postconsumer content

Rubber

100% recovered rubber, including 12-100% postconsumer content

Plastic/composites

Wood/composites

Concrete

100% postconsumer plastic or plastic/rubber composite 100% recovered wood/plastic composite See EPA guidance at www.epa.gov/cpg

Plastic (polyol) 20% biobased content

ENERGY STAR and FEMP

Ceiling Fans (ES) ENERGY STAR

Windows (ES/ FEMP) ENERGY STAR and FEMP

Doors and Skylights (ES) ENERGY STAR

Fluid-Filled Transformers (BP) Syntheric Ester-Based 66% - Minimum Biobased Content

Vegetable Oil-Based 95% - Minimum Biobased Content

Bathroom Fixtures

Bathroom sink faucets (WS/

FEMP)

FEMP and WaterSense

Showerheads (WS/FEMP) FEMP and WaterSense

Toilets (WS) WaterSense

Urinals (WS/ FEMP) FEMP and WaterSense

Shower and restroom divid-ers/partitions (R) Steel

Plastic

20-100% recovered plastic, includ-ing 20-100% postconsumer content

HVAC Room AC (ES/ FEMP) ENERGY STAR and FEMP

Air-Source Heat Pumps (ES/

FEMP)

ENERGY STAR and FEMP

Geothermal or Ground-Source Heat Pumps (ES/ FEMP)

Boilers (ES/ FEMP) ENERGY STAR and FEMP

Furnaces (ES/ FEMP) ENERGY STAR and FEMP

Light Commercial Heating and Cooling (ES)

ENERGY STAR

Ventilating Fans (ES) Commerical Unitary Air Con-ditioners (FEMP)

FEMP

Air-Cooled Chillers (FEMP) Water-Cooled Chillers

(FEMP)

Structure 018000 - 7 Environmental Requirements and

Commercial Heat Pumps

Centrifugal Pumping System

(FEMP)

Electric Water Heaters

Gas Water Heaters (FEMP) FEMP

Appliances

Programmable Thermostats

(ES)

Commercial Dishwashers

(ES)

Clothes washers (ES/ FEMP) ENERGY STAR and FEMP

Dishwashers (ES/ FEMP) ENERGY STAR and FEMP

Miscellaneous Water tank coatings (BP) Concrete and Asphalt Release Fluids (BP) Fire Suppression and Explo-sion Protection

Total flooding agents

59% biobased content

87% - Minimum Biobased Content

SNAP

Streaming applications SNAP

Landscaping Products

Compost (R)

Halon substitute manufac-turers Yard trimmings, food waste, manure, biosolids, or other recovered organic materials

SNAP

100% recovered organic materials

Hoses (R) Garden hose

60-65% postconsumer rubber and/or plastic

Soaker hose

60-70% postconsumer rubber and/or plastic

Hydraulic mulch (R)

Paper-based hydraulic mulch 100% postconsumer paper

Wood-based hydraulic mulch 100% recovered wood and paper

Lawn and garden edging (R)

Plastic lumber landscaping

30-100% recovered plastic and/or rubber, including 30-100% post-consumer content 75-100% recovered High Density Polyethylene, including 25-100% timber and posts (R) postconsumer content 100% recovered mixed plas-tics/sawdust, including 50% post-consumer content 95% recovered High Density Poly-ethylene/fiberglass, including 75% postconsumer content 95-100% other mixed recovered resins, including 50-100% postcon-sumer content

Fertilizers (BP) 71% - Minimum Biobased Content

Landscape irrigation services

(WS)

Weather- or sensor-based irrigation control technologies

(WS)

WaterSense

WaterSense

Roadway Construction

Cement and concrete (R) Coal fly ash

Structure 018000 - 8 Environmental Requirements and

Ground granulated blast furnace slag See EPA guidance at www.epa.gov/cpg

Cenospheres See EPA guidance at www.epa.gov/cpg

Sililca fume See EPA guidance at www.epa.gov/cpg

Railroad grade crossing sur-faces (R) Concrete 15-20% recovered coal fly ash

Rubber 85-95% recovered tire rubber

Steel

Wood

Plastic

See EPA guidance at www.epa.gov/cpg 90-97% recovered wood or wood composite, including 90-97% post-consumer content 100% recovered plastic or plastic composite, including 85-95% post-consumer content

Concrete and Asphalt Release Fluids (BP)

87% - Minimum Biobased Content

Building Finishes

Carpet (R)

Polyester carpet face fiber

25-100% recovered Polyethylene Terephthalate, including 25-100% postconsumer content

Carpet (BP)

Woven, tufted, or knitted fiber and a backing system 7% - Minimum Biobased Content

Carpet cushion (R) Bonded polyurethane

15-50% old carpet cushion, includ-ing 15-50% postconsumer content

Carpet cushion (R) Jute 40% postconsumer burlap

Carpet cushion (R)

Carpet cushion (R)

Synthetic fibers

Rubber

100% recovered carpet fabrication scrap 60-90% recovered tire rubber, in-cluding 60-90% postconsumer content

Reprocessed latex paint (R)

White, off-white, pastel colors 20% postconsumer content

Reprocessed latex paint (R)

Grey, brown, earthtones, and other dark colors

50-99% recovered material, includ-ing 50-99% postconsumer content

Consolidated latex paint (R) 100% postconsumer content

Mats (R) Rubber

85-100% recovered rubber, includ-ing 75-100% postconsumer content

Mats (R) Plastic

100% recovered plastic, including 10-100% postconsumer content

Mats (R) Blends

100% postconsumer rubber/plastic composite

Compact Fluorescent Lamps (CFLs) (ES/ FEMP)

Light Fixtures (ES) ENERGY STAR

Decorative Light Strings (ES) ENERGY STAR

LED Lighting ENERGY STAR

Fluorescent Tube Lamps

Fluorescent Ballasts (FEMP) FEMP

Structure 018000 - 9 Environmental Requirements and

Fluorescent Luminaires

Structure 018000 - 10 Environmental Requirements and

Downlight Luminaires

(FEMP) FEMP

Industrial HID Luminaires

(FEMP) FEMP

Lighting Controls (FEMP) FEMP

4. WETLANDS

4.1 All drainage ditches on-site are considered to be journalized wetlands. Designer will minimize impacts or ditch crossing and will coordinate any work impacting ditches with the appropriate US Army Corps of Engineers (USACOE) office.

5. UNDERGROUND STORAGE TANKS (USTS)

5.1 Designer will verify all requirements for OWSs and/or USTs. At this time, there are no regulated

USTs on the installation.

6. STORM WATER POLLUTION PREVENTION

6.1 Storm Water Pollution Prevention Plan

6.1.1 All projects disturbing one (1) or more acre of land will require a site-specific Storm Water

Pollution Prevention Plan (SWP3). Generic plans or “corporate” plans are not acceptable. For projects disturbing an area smaller than (1) acre, a SWP3 will not be required unless the smaller project is part of an overall construction program disturbing over one acre. The requirement for a SWP3 for these projects (< 1 acre) will be addressed on a case-by-case basis.

6.1.2 Designer will develop a site-specific SWP3 in accordance with the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .