Specifications_All.pdf

PDF 218 KB Posted

Attached to
Nursery Building ACBM Flooring Removal & Replacement Federal contract opportunity
Solicitation number
1240BH21Q0032
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Nursery Building ACBM Flooring Removal & Replacement, newest first.
File Type Posted
Amendment One_Nursery Flooring.pdf PDF
AsbestosSurveys.pdf PDF
Flooring Solicitation.pdf PDF
Wage Rates.pdf PDF
FINAL_DRAWINGS_Signed.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE PROJECT SPECIFICATIONS

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 1/1 Specification List

SPECIFICATION LIST

EMPLOYEE CENTER ASBESTOS CONTAINING MATERIAL REMOVAL

AND FLOORING

J. Herbert Stone Nursery Rogue River – Siskiyou National Forest

Jackson County, Oregon

CONSTRUCTION SPECIFICATION INSTITUTE (CSI) SPECIFICATIONS

SECTION TITLE

DIVISION 01 – GENERAL REQUIREMENTS

01020 Intent of Contract

01025 Measurement and Payment

01200 Mobilization

DIVISION 09 – FINISHES

09655 Sheet Flooring

DIVISION 13 – SPECIAL CONSTRUCTION

13281 Asbestos Containing Material Abatement

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 01020 - 1/1 Intent of Contract

SECTION 01020

INTENT OF CONTRACT

1. PART 1 - GENERAL

1.01 SUMMARY

A. The intent of the contract is to provide for the complete construction of a fully functional project as described in the contract documents and Drawings. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and shall perform all work required to complete the project within reasonably close conformity to the Drawings and Specifications, and in accordance with provisions of the contract.

2. PART 2 – PRODUCTS (NOT USED)

3. PART 3 – EXECUTION (NOT USED)

4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)

END OF SECTION

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 01025 - 1/3 Measurement and Payment

SECTION 01025

MEASUREMENT AND PAYMENT

1. PART 1 - GENERAL

1.01 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

C. Not all units and measurement methods may be used under this Contract.

1.02 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computation shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting, and erosion control blankets shall be along slope lines.

2. For excavation or embankment volume, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For structures they shall be measured according to neat lines shown on the Drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurement shall be made parallel to the base of foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions.

Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 01025 - 2/3 Measurement and Payment

1.03 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: 43,560 square feet. Make longitudinal and transverse measurements for area computations horizontally unless specified on the ground surface.

2. Cubic Yard (CY): 27 cubic feet, computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.

Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

3. Each (EA): One complete unit, which may consist of one or more parts.

4. Gallon (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially packaged volume.

5. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

6. Linear Foot (LF): Measurement of work along its length from point-to-point;

parallel to the base or foundation. Do not measure overlaps.

7. Lump Sum (LS): One complete unit, not directly measured. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.

8. Mile: 5,280 linear feet. Measure horizontally along the centerline of each roadway, approach, or ramp.

9. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

10. Square Foot (SF): Measured on a plane parallel to the surface being measured.

11. Square Yard (SY): 9 square feet. Measure on a plane parallel to the surface being measured.

12. Square (SQ): Roofing unit of area equal to 100 square feet. Measure on a plane parallel to the surface.

13. Ton: Measured as a short ton consisting of 2,000 pounds.

14. Station (STA): 100 Linear feet. Measure horizontally along centerline or reference line of each roadway, approach road, or ramp.

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 01025 - 3/3 Measurement and Payment

1.04 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that causes a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

2. PART 2 – PRODUCTS (NOT USED)

3. PART 3 – EXECUTION (NOT USED)

4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)

Rev. Date 02/21 JHSN Employee Center ACBM Removal and Flooring 01200 - 1/1 Mobilization

SECTION 01200

MOBILIZATION

1. PART 1 - GENERAL

1.01 SUMMARY

A. This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

2. PART 2 - PRODUCTS (NOT USED)

3. PART 3 - EXECUTION (NOT USED)

4. PART 4 - MEASUREMENT AND PAYMENT

4.01 PROGRESS PAYMENTS WILL BE MADE AS FOLLOWS:

A. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

B. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

D. The total of all payments shall not exceed the original contract amount for this item.

4.02 BASIS OF PAYMENT

A. Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

01200-1 Mobilization Lump Sum

Rev. Date 02/21 JHSN Employee Center ACBM Removal and Flooring 09655 - 1/3 Resilient Sheet Flooring

SECTION 09655

RESILIENT SHEET FLOORING

1. PART 1 - GENERAL

1.01 SUMMARY

A. This section specifies flooring underlayment, resilient sheet flooring and wall base where shown on the Drawings.

1.02 SUBMITTALS

A. Submit sufficient descriptive literature fully describing product to be used for CO approval.

B. Color samples. Submit full spectrum of manufacturer’s product choices to CO for selection.

1.03 DELIVERY, STORAGE, AND HANDLING

A. Store all materials at the job site at a minimum temperature of 70 degrees F for not less than 48 hours before installation.

2. PART 2 - PRODUCTS

2.01 MATERIALS

A. Plywood Underlayment

1. 1/4-inch, A-A, fully sanded face, Exterior or Exposure 1.

2. UltraplyXL Premium Underlayment or approved equal.

B. Vinyl Sheet Flooring.

1. ASTM F1913, Wear layer Thickness 2.0 mm, Diamond infused coating

2. Armstrong Medintech or approved equal.

C. Vinyl Wall Base.

1. ASTM F1861, Group 1 (homogeneous), Style B6 (cove), 0.125 inches thick, 6 inches high, Job Formed outside corners.

2. Johnsonite vinyl wall base, or approved equal.

D. Adhesive.

1. Waterproof type as recommended by the flooring manufacturer.

E. Crack Filler.

1. As recommended by the flooring manufacturer.

F. Metal Edge Strips.

1. Aluminum, profile similar to Futura Industries or an approved equal.

Rev. Date 02/21 JHSN Employee Center ACBM Removal and Flooring 09655 - 2/3 Resilient Sheet Flooring

3. PART 3 - EXECUTION

3.01 PREPARATION – SUBFLOORING

A. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.

B. Pound down all existing protruding fasteners flush with existing surface of the subflooring

3.02 UNDERLAYMENT

A. Install underlayment with printed side down.

B. Install the long dimension of the panels perpendicular to the floor joists for maximum rigidity.

C. Make sure underlayment seams offset any sub-floor panel seams by at least 6-inches.

D. Stagger panels so that four corners do not meet.

E. Fasten panels to sub floor with 18-gauge staples and/or 12-gauge non-staining, galvanized ring groove nails.

F. Position fasteners in the field on 4” centers

G. Attach edge fasteners 1-1/2-inch apart and 3/8-inch from edge

H. Set fasteners flush or slightly below the panel surface.

3.03 VINYL FLOORING

A. Follow manufacturer's specifications and recommendations for all installations.

B. Spread adhesive uniformly with a notched steel trowel or other device recommended by the manufacturer of the adhesive and flooring.

C. Carefully match the pattern and fuse all joints and seams. Make all seams are straight, and aligned square with the room axis. Neatly trim material abutting other work to form a true, clean joint. Where flooring edges are covered by other materials, make cuts sufficiently accurate so that edges are completely concealed.

D. Roll with a 3 section, 150 pound roller.

E. Complete flooring before installing base. Thoroughly bond base to wall with bottom edge in uniform contact with floor surface. Make all joints tight and surfaces aligned. Minimize joints to the extent possible.

F. Install metal edge strips wherever flooring terminates with an unprotected edge.

3.04 VINYL WALL BASE

A. Comply with manufacturer's written instructions for installing vinyl base.

B. Install vinyl base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required

C. Install vinyl base in lengths as long as practical without gaps at seams and with tops of adjacent pieces aligned.

Rev. Date 02/21 JHSN Employee Center ACBM Removal and Flooring 09655 - 3/3 Resilient Sheet Flooring

D. Tighly adhere vinyl base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.

E. Do not stretch vinyl base during installation.

3.05 CLEANING

A. Thoroughly clean all surfaces free of adhesive, soil, manufacturer’s markings, and stains.

4. PART 4 - MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT

A. Measurement will be made of completed floor areas as identified in the Drawings and Specifications.

4.02 BASIS OF PAYMENT

A. Payment will be made under the following item:

09655-1 Area 1 and Area 2 Installation of Underlayment, Square Foot

Vinyl Sheet Flooring, and Wall Base

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 13281-1/3 ACBM Abatement

SECTION 13281

ASBESTOS CONTAINING MATERIAL ABATEMENT

1. PART 1 GENERAL

1.1 SUMMARY

A. This section specifies the removal of asbestos containing building material and non-asbestos containing material. This includes rubber base, sheet vinyl, composite floor tiles, mastic, and underlayment.

1.2 APPLICABLE REGULATIONS AND GOVERNING AGENCIES

A. The contractor shall be responsible to be familiar with and comply with the requirements set for by the following regulations and agencies:

1. State of Oregon Department of Environmental Quality (ODEQ)

2. Oregon Administrative Rules 340, Division 248

3. Occupational Safety and Health Act (OSHA)

4. Other State and local codes in affect that regulate this type of work.

B. The contractor shall purchase and obtain all necessary ODEQ permits, complete notifications, associated documentation, and correspondence required of the permit.

1.3 QUALIFICATIONS

A. An Asbestos Abatement Contractor licensed by the Oregon Department of Environmental Quality shall perform all work associated with the removal of friable and non- friable asbestos containing material and utilize certified workers and supervisors.

1.4 SUBMITTALS

A. Provide documentation that company performing abatement work is licensed for such work by the Oregon Department of Environmental Quality (ODEQ).

B. Provide evidence that the Contractor has submitted project notification requirements to the Oregon Department of Environmental Quality within the allowable time period as required by ODEQ.

C. Provide documentation of disposal from the landfill.

1.5 ASBESTOS SURVEY

A. In 2018 and 2019 an asbestos survey was completed of the existing rubber base, sheet vinyl, composite floor tiles, mastic, and underlayment. Copies of these surveys are given in Attachment 1 . Summary of testing results as follows:

1. Rubber base: Non-detect

2. 12”x12” composite tile: Friable, non-detect.

3. Sheet vinyl: Friable, 18% Chrysotile

4. Mastic: Non-friable, 2% Chrysotile

5. Underlayment: Not tested

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 13281-2/3 ACBM Abatement

2. PART 2 PRODUCTS

2.1 MATERIALS

A. As is necessary for removal and protection of other portions of the structure during the removal process.

3. PART 3 EXECUTION

3.1 PREPARATION

A. Post warning signs and labels as required by per EPA, OSHA, and State laws.

B. Temporarily move and reinstall cabinets, appliances, doors, fixtures, trim, etc. as is necessary for the complete removal of all ACM identified for this project.

C. Adjacent processing facility may be used for the temporary storage of appliances during the ACM removal process. See Drawing Sheet T1

D. Isolate the work area for the duration of the work according to acceptable trade practice and code requirements.

E. Build double barriers of plastic sheeting at all ingress and egress points of the work area to that the work area is always closed off by one barrier when workers enter or exit.

F. Cover all non-removable items and equipment in the work area with plastic sheeting taped securely in place.

G. Coordinate with Building Manager to disable all HVAC systems affected by the work.

3.2 REMOVAL

A. Remove existing wall base, sheet vinyl, composite floor tiles, mastic, and underlayment in identified areas. Removal shall fully expose presumed structural sub-floor.

B. The asbestos material shall be sprayed with water containing a wetting agent in the form of a fine spray. The material shall be sufficiently saturated to prevent emission of airborne fibers in excess of the exposure limits.

C. The asbestos material shall be removed in small sections. Before beginning the next section, the material shall be packed while still wet into double-wrapped sealable plastic bags and labeled per regulations for transporting.

D. All plastic sheeting, tape, cleaning material, clothing and all other disposable material or items used in the work area shall be packed into double-wrapped sealable plastic bags and labeled per regulations for transporting.

3.3 INSPECTION

A. While performing asbestos abatement work, the Contractor shall be subject to on-site inspection by agency officials. Work shall also be subject to inspection by OSHA and EPA inspector (and/or local building or health officials).

Rev. Date 2/21 JHSN Employee Center ACBM Removal & Flooring 13281-3/3 ACBM Abatement

3.4 DISPOSAL

A. Waste asbestos material shall be disposed of in accordance with all Federal and State regulations implementing the intent of the Resource Conservation and Recovery Act (40 CFR 260-265) and at an approved sanitary landfill. The "small quantity exclusion" of the regulations shall not apply to disposal of waste asbestos materials. Establish a temporary holding area approved by the COR for properly packaged asbestos waste.

4. PART 4 MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Measurement will be made of completed floor areas as identified in the Drawings and Specifications.

4.2 BASIS OF PAYMENT

A. Payment will be made under the following item:

13281-1 Area 1 Abatement to Subfloor Elevation Square Foot 13281-2 Area 2 Abatement to Subfloor Elevation Square Foot