Specifications (59).pdf
PDF 304 KB Posted
- Attached to
- ITB - Friendswood Regional Stormwater Detention Basin for the Harris County Flood Control District
- Solicitation number
- 26/0332
- Issued by
- Harris County, Texas
About this file
This document contains specifications and bid requirements for Harris County, Texas, in conjunction with the Harris County Flood Control District (HCFCD), for construction of the Friendswood Regional Stormwater Detention Basin (Project ID: A500-09-00-E001). The project requires vendors to furnish all personnel, labor, materials, and incidentals necessary for construction of the stormwater detention basin. A voluntary pre-bid conference is scheduled for October 13, 2026, at 10:00 a.m. CST via Microsoft Teams, though attendance is not mandatory. Vendors must submit written questions through the Bonfire platform by the deadline specified in the Events Schedule, and all questions and answers will be released as public notices to all firms. The project specifications and drawings are available for download through Bonfire, and vendors must review the Project Manual for detailed requirements. All bids are public record once opened, and no alterations may be made to the bid document.
Pricing on the BidTable must be all-inclusive, incorporating all charges for labor, material, equipment, and other costs, with no separate line item rates accepted. Unit pricing governs in cases of discrepancy between unit and total pricing. Payment terms are Net 30 from the date HCFCD approves the invoice, meaning payment may occur up to one month after approval. Vendors must comply with Texas Government Code Section 2258 regarding prevailing wage rates and submit certified weekly payroll records. Additionally, vendors must comply with Harris County's Contractor Minimum Wage policy (currently $21.65/hour) and pay workers the higher of either the prevailing wage or minimum wage. Performance bonds are required for public works projects exceeding $100,000, and payment bonds are required for projects exceeding $25,000. The County reserves the right to withhold payment for wage discrepancies and may assess penalties of $60.00 per day per person per incident for underpayment. All invoices must include certified payroll records and lien waivers as applicable, routed through HCFCD. Funding is subject to appropriation and availability, and the County may terminate the contract without penalty if funds become unavailable.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 10.17.25
SPECIFICATIONS
SCOPE
Harris County is soliciting bids for construction of the Friendswood Regional stormwater detention basin for the Harris County Flood Control District (HCFCD).
Respondent understands if funds are not appropriated or otherwise become unavailable, the County may terminate the Contract and/or option, in whole or in part, without penalty or further obligation to the Proposer, except for amounts lawfully owed for goods or services properly provided before the effective date of termination. Any contract resulting from this solicitation will be subject to the availability of funds and shall not be construed as creating a debt on behalf of Harris County in violation of Article III, Section 49a of the
Texas Constitution.
PRE-BID CONFERENCE
A VOLUNTARY pre-bid conference is scheduled for October 13, 2026 at 10:00 a.m. CST, local time via Microsoft Teams.
https://teams.microsoft.com/meet/260024613080328?p=fsEfunSuYgEe3J1Pxu
Meeting ID: 260 024 613 080 328
Passcode: Wg6R4BW6
Or call in (audio only)
+ 1 281-985-1862, 263 184 126#
Attendance is not mandatory but encouraged so vendors can gain a better understanding of the requirements listed within this bid. The pre-bid conference will not be rescheduled due to tardiness or any other issues that may arise, no exceptions. Persons with disabilities requiring special accommodations should contact the Purchasing Office at (713) 274- 4400 at least two (2) days prior to the pre-bid conference.
It is the responsibility of each vendor to examine the entire bid package, seek clarification in writing, and review their bid for accuracy before submitting. Questions relating to this bid must be submitted in writing online within Bonfire at https://harriscountytx.bonfirehub.com. The deadline for submission of questions relating to this bid is listed on the Events Schedule within Bonfire. All questions submitted in writing prior to the deadline will be compiled and answered in writing. A copy of all questions and answers will be released as a Public Notice to all firms through Bonfire. The County will not be bound by any information conveyed verbally.
CERTIFICATE OF INTERESTED PARTIES (FORM 1295)
Texas law requires all parties who enter into any contract with the County which must be approved by Commissioners Court to disclose all interested parties. Form 1295 must be completed in its entirety at the following website: https://www.ethics.state.tx.us/filinginfo/1295/ prior to submitting your response.
Failure to do so may result in disqualification of your response.
SPECIAL REQUIREMENTS
Where these special requirements and information as detailed in the attachment titled Project Manual, under Supporting Documents inside Bonfire, differ from the preceding Harris County General Requirements for bids within the specific requirements and attachment titled Project Manual, under Supporting Documents inside Bonfire, supersede where applicable.
Friendswood Regional Stormwater Detention Basin for the Harris County Flood Control District –
Project ID: A500-09-00-E001
Coordination of the project will be through HCFCD and all invoices must be routed through their department. All invoices shall include submission requirements stated herein including completed certified payroll records and lien waivers (if applicable). Payment terms are “Net 30” from date the invoice is approved by HCFCD; therefore, payment to the vendor may be up to one (1) month from the date the invoice is approved by HCFCD.
In addition, the vendor must comply with Texas Government Code (GC) 2258, Prevailing Wage Rates, and GC 2253.021, Performance and Payment Bonds. Accordingly, GC 2258 requires the vendor to submit a certified payroll record as detailed in the attachment titled Prevailing Wage Rates, Worker Classification
Definitions and Payroll Submittal Instructions (http://www.eng.hctx.net/Consultants/Construction/Prevailing-Wage-Rates), and compensate any worker employed on a public works project not less than as applicable. As well, GC 2253.021, Performance and Payment Bonds, requires the vendor to provide a payment bond on all public works jobs that exceed
$25,000, and a performance bond on all public works jobs that exceed $100,000.
The rates quoted on the BidTable (bid pricing sheets) within Bonfire must be all-inclusive. “All-inclusive" shall be construed as costs incorporating all charges for labor, material, equipment and any other cost incurred. No separate line item rates or charges will be accepted. Quantities are estimated. Harris County may require more or less. In case of a discrepancy between unit and total pricing, unit pricing governs.
The Extra Work Items section of the BidTable are to be used only on the instructions of the field engineer on the job. No compensation will be received for any part of these items unless they are actually used on the job under the direction of the field engineer. Any additional items required over and above those listed on the BidTable will have to be secured on a change-in-contract and are not to be used until they have been approved by the Harris County Auditor’s Office and/or Commissioners Court.
It may be required that the vendor submit a sample of specified items on the BidTable for inspection and approval by the Office of the County Engineer prior to order placement.
This bid or Commissioners Court approved award does not obligate Harris County to the eventual purchase of any product/service described, implied or which may be proposed. Progress toward this end is solely at the discretion of Harris County and may be terminated at any time.
NO CONFIDENTIALITY OF BIDS
Once opened, bids are public record. There are no exceptions. When submitting a bid, the vendor must be sure to redact confidential information if the information is needed to address requirements of the bid. If there are any questions concerning confidentiality of information to be submitted, contact Luke Herdrich immediately at Luke.Herdrich@harriscountytx.gov.
ALTERATION OF DOCUMENT
No alterations may be made to this document. Any alterations made may result in the bid being rejected.
The terms and conditions contained within this bid supersede all conflicting terms within any cooperative purchasing contracts associated with this purchase.
TOLL/PARKING FEES
Any and all toll/parking FEES incurred by the vendor during the term of this contract will be the responsibility of the vendor.
DRAWINGS/ADDITIONAL SPECIFICATIONS
Vendors may download the drawings, plans, and/or maps for this project through Bonfire at https://harriscountytx.bonfirehub.com as referenced in the attachments titled Project Manual and Drawings.
Do NOT include the drawings from this bid package with the bid submittal.
SPECIFICATION
This project will consist of furnishing all personnel, labor, materials, and incidentals necessary for construction for the Friendswood regional stormwater detention basin for the HCFCD.
For bidding purposes and to get a better understanding of the requirements of this bid, please refer to the attachment titled Project Manual, and Drawings under Supporting Documents inside Bonfire.
PREVAILING WAGES
In accordance with Section 2258 of the Texas Government Code, contractor and any subcontractor hired by contractor for the construction of any project, shall not pay less than the rates set forth in the Schedule of Prevailing Wages attached and incorporated by reference in each Project Manual. Contractor warrants that it and its subcontractors shall comply with all requirements and worker ratios per the applicable Schedule of Prevailing Wages and Texas state law.
In addition to these wage rates, Contractors must separately comply with Harris County's Minimum Wage Policy [see link] and pay all workers on county projects at least Harris County's Contractor Minimum Wage (currently $21.65/hour). Every worker on a Harris County construction project will make at least the higher of the Harris County Minimum Wage or their applicable Prevailing Wage.
Contractor shall submit certified payroll of contractor and all subcontractors on a weekly basis. At County’s request, contractor shall make available and shall require its subcontractors to make available, copies of cancelled checks and check stubs for comparisons by the County or its agents.
County reserves the right for its agents to visit the project site and to interview contractor, its subcontractors and employees of each on any date or time, as often as desired during the construction period, without prior notification.
County will ascertain if proper wage rates are being paid to the employees as required by the Project Manual. In the event of a discrepancy between the work performed and the wages paid, County will document same and notify contractor. All initial determinations of the classification of workers or the appropriate prevailing wage shall be made by the Harris County Contract Compliance Officer. Her determinations shall be binding.
If, for any length of time and as determined by the Harris County Contract Compliance Officer, discrepancies appear between the certified payrolls and the actual wage paid, County shall require check stubs to be attached to each weekly certified payroll.
Pursuant to TEX. GOV’T CODE ANN. §2258.051, the County reserves the right to withhold any monies due contractor until such discrepancy is resolved and the necessary adjustment made. Contractor shall also pay a penalty in accordance with TEX. GOV’T CODE ANN. § 2258.023(b), of Sixty and No/Dollars ($60.00) per day per person per incident that such person is underpaid. Contractor shall impose these same obligations upon its Subcontractors. Contractor understands that with monthly certified payrolls, contractor is responsible for any and all penalties that shall accrue during the month, regardless of the fact that any error could not be discovered by the Contract Compliance Officer until the following certified payroll.
File details come from the government source that posted it. Updated .