Specifications (50).pdf

PDF 5 MB Posted

Attached to
Private Sanitary Sewer Force Main and Public Waterline Extension on Rankin Road
Solicitation number
R315987.02
Issued by
Harris County, Texas

About this file

This specifications document outlines the bidding requirements for a private sanitary sewer force main and public waterline extension project for King Fuel's Food Store in the Greens Parkway Municipal Utility District, prepared by Huitt-Zollars, Inc. The project involves construction of a private lift station with a force main consisting of approximately 1,925 linear feet of 2" PVC pipe, shallow bore work of 230 linear feet, and extension of a public 12" waterline with an 8" waterline totaling approximately 700 linear feet. Sealed bids are due by 2:00 p.m. on Monday, September 28, 2026, addressed to Niazi Family Investments, Ltd. at the engineer's office in Houston, Texas. A non-mandatory pre-bid conference is scheduled for 2:00 p.m. on Wednesday, September 23, 2026, at the same location. Bidding documents are available for download from www.civcastusa.com and can be examined at no charge at the engineer's office. The contractor must specify the number of calendar days required to complete the work, with a daily economic disincentive of $150 per calendar day assessed for late completion beyond the contract time limit.

Bids must be accompanied by bid security equal to 5 percent of the greatest individual bid amount in the form of a cashier's check, bank draft, or bid bond from a surety company authorized in Texas. The successful bidder must execute a Performance & Maintenance Bond and a Payment Bond, each in the amount of 100 percent of the total contract price, within fifteen days of award notification. The bonds must remain in effect for at least one year beyond final acceptance. Harris County prevailing wage rates apply to all workers on the project, with penalties of $60 per worker per day for non-compliance. The owner is exempt from Texas sales and use taxes, and the contractor must pass on cost savings related to exempt items to the owner. The owner reserves the right to reject any or all bids and evaluate bids based on bidder qualifications, compliance with requirements, and overall project advantageousness.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GREENS PARKWAY

MUNICIPAL UTILITY DISTRICT

KING FUEL’S FOOD STORE

SPECIFICATIONS

FOR

PRIVATE SANITARY SEWER FORCE MAIN AND

WATERLINE EXTENSION

Prepared by

Firm Number F-761

10350 Richmond Avenue, Suite 300

Houston, Texas 77042

Ph. 281-496-0066 Fax 281-496-0220

September 2026

HZI Job No. R315987.02 mperales Text Box

FOR BID

August 27, 2026 King Fuel’s Food Store Huitt-Zollars, Inc.

Sanitary Force Main & Waterline Extension

HZI JOB NO. R315987.02 TABLE OF CONTENTS 00002 - 1

J:\Proj\GREENS PARKWAY MUD\Rankin Road King Fuels\05 Design\05.10 Specifications\00-Division 00

TABLE OF CONTENTS

DIVISION 00 - DOCUMENTS No. of Pages

00100 INSTRUCTIONS AND BID SCHEDULE

00300 PROPOSAL AND BID SCHEDULE ……………………………………….. 10

00500 CONTRACT AGREEMENT

00612 PERFORMANCE & MAITENANCE BOND

00622 PAYMENT BOND

00630 GUARANTEE

00799 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

00800 SUPPLEMENTARY CONDITIONS

00900 MINIMUM WAGE RATES

DIVISION 01 - GENERAL REQUIREMENTS

01005 GENERAL REQUIREMENTS

01026 UNIT PRICES

01410 TESTING LABORATORY SERVICES

01501 TRENCH EXCAVATION SAFETY SYSTEMS

DIVISION 02 - SITE WORK

02100 SITE PREPARATION

02223 EXCAVATING, TRENCHING, AND BACKFILLING FOR PIPE

02225 STRUCTURAL EXCAVATION AND BACKFILL

02300 EARTHWORK …………………………………………………….………….. 13

02506 POLYVINYL CHLORIDE PIPE

02514 DISINFECTION OF WATER LINES

02515 HYDROSTATIC TESTING OF PIPELINES

02532 SANITARY SEWER FORCE MAINS

02660 WATER DISTRIBUTION SYSTEM

02730 SANITARY SEWER SYSTEM

02921 HYDROMULCH SEEDING

DIVISION 11 - EQUIPMENT

11306 SUBMERSIBLE PUMP SEWAGE LIFT STATION

11307 LIFT STATION SUBMERSIBLE SEWAGE PUMP CONTROL SYSTEM . 3

Sanitary Force Main & Waterline Extension

HZI JOB NO. R315987.02 TABLE OF CONTENTS 00002 - 2

LIBERTY PUMPS

2460LSG/LSGX-Series Omnivore 2 HP Simplex Grinder Packages

September 9, 2026 King Fuel’s Food Store Huitt-Zollars, Inc.

Sanitary Force Main & Waterline Ext.

HZI JOB NO. R315987.02 00100 - 1

SECTION 00100

INSTRUCTIONS TO BIDDERS

1. Sealed bids in duplicate addressed to Niazi Family Investments, Ltd. (“OWNER”) will be received at the office of Huitt-Zollars, Inc. ("ENGINEER"), 10350 Richmond Avenue, Suite 300, Houston, Texas 77042-4248, until 2:00 p.m., Monday, September 28, 2026 to furnish all labor, materials and equipment, and performing all work required for construction. Bid envelopes must be sealed and addressed to Niazi Family Investments, Ltd., c/o Huitt- Zollars, Inc. Copies of the bidding documents may be downloaded from www.civcastusa.com. Search for “Private Sanitary Sewer Force Main and Public Waterline Extension on Rankin Road”. Bidders must register on this website in order to view/download specifications and plans for this project. Said documents may be examined without charge in the office of Huitt-Zollars. Inc., 10350 Richmond Ave., Suite 300, Houston, Texas 77042. A pre-bid conference for bidders and ENGINEER will be held at the Office of Huitt-Zollars located at 10350 Richmond Avenue, Suite 300, Houston, Texas 77042 at 2:00 p.m., Wednesday, September 23, 2026. Pre-Bid conference is not mandatory.

2. The OWNER reserves the right to reject any or all bids and waive any or all irregularities.

3. Bids shall be submitted in sealed envelopes upon the blank form of proposal furnished.

Sealed envelopes shall be marked in the upper left-hand corner as follows:

"DO NOT OPEN IN MAIL ROOM

BID FOR

NIAZI FAMILY INVESTMENTS, LTD

PRIVATE SANITARY SEWER FORCE MAIN AND WATERLINE EXTENSION

TO BE OPENED, 2:00 P.M.,

MONDAY, SEPTEMBER 28, 2026."

4. Bid prices in the Proposal, written in words and in figures, shall be typewritten or plainly printed.

5. Proposal shall be accompanied by a bid security in the form of a cashier's check or bank draft purchased from a national or state bank in the amount of 5 percent (5%) of the greatest amount bid payable to the Owner, or a bid bond in the same amount from a reliable surety company licensed to operate and authorize to execute and issue bid bonds in the State of Texas and listed in the United States Treasury Department's current publication of Accepted Sureties, Department Circular 570, as a guarantee that the bidder will enter into a http://www.civcastusa.com/

HZI JOB NO. R315987.02 00100 - 2

contract and execute the required bonds within ten days after notice of award. Bids without check, bank draft, or bid bond will not be considered.

6. Bid securities will be returned to the respective bidders within ten days after bids are opened, upon written request, except those which the Owner elects to hold until the successful bidder has executed the Contract and furnished a Performance Bond, Maintenance Bond and Payment Bond. The successful bidder will receive his bid security within ten days after execution of Contract, receipt, and acceptance by Owner of required bonds.

7. The right is reserved, as the interest of the Owner may require, to reject any and all bids, and to waive any informality in bids received.

8. Bidders are responsible for carefully examining the Specifications, Drawings, and other bidding documents; visiting the site of the work; and fully informing themselves as to all conditions and matters, which can in any way affect the work or cost thereof. Should a bidder find discrepancies in or omissions from the Drawings, Specifications, or other bidding documents, or should he be in doubt as to their meaning, he shall at once notify the A-E in writing prior to submitting any bid. Clarification will be issued only in writing to all prime bidders.

9. Addenda to the Specifications and Drawings issued to bidders prior to the receipt of bids shall be considered part of the Contract Documents. Bidders shall acknowledge receipt of Addenda on the proposal form. Failure to acknowledge receipt of Addenda may subject bidder to disqualification.

10. Alternate bids will not be considered unless specifically requested as part of the blank form of proposal furnished.

11. Qualifying or modifying statements, substantial irregularities, or letters accompanying the proposal of any bidder may be cause for rejection of the bid.

12. OWNER reserves the right to reject any or all bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced or conditional bids and to reject the bid of any bidder if OWNER believes that it would not be in the best interest of the Project to make award to that bidder, whether because the bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria by OWNER. OWNER also reserves the right to waive all informalities and defects in the bids and the bidding process, except time of submitting a bid.

Discrepancies between the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures

HZI JOB NO. R315987.02 00100 - 3

and the correct sum thereof will be resolved in favor of the correct sum. In case of ambiguity or lack of clarity in stating the prices in the Bid, the OWNER reserves the right to consider the most advantageous construction thereof or to reject the Bid.

13. In evaluating bids, OWNER will consider, among other things, the qualifications of bidders, whether or not the bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the bid form or prior to the Notice of Award.

14. OWNER may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of subcontractors, suppliers, and other persons and organizations must be submitted as provided herein. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.

15. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the CONTRACT DOCUMENTS to OWNER’s satisfaction. OWNER may require Bidders to submit bank references and financial statements in connection with bid evaluation. OWNER may also consider Bidder’s (or Bidder’s officers’, partners’, directors’, affiliates’) prior dealings with OWNER or with any entity responsible for payment to Bidder under this Contract.

16. Basis of Award: If the contract is to be awarded, the bid to be considered the most advantageous in determining award of the Contract will be the bid from the conforming qualified bidder that in the Owner's judgment will be the most advantageous to the Owner and result in the best and most economical completion of the proposed work.

17. Bidder shall include an amount in each blank in the Bid Schedule of the Proposal.

18. The Conditions of the Contract require the successful bidder, within fifteen (15) days after written notification of award of the Contract, to provide and execute a Performance & Maintenance Bond and a Payment Bond of required form and of even date with the Contract each in the amount of 100 percent of the total Contract price. The Performance & Maintenance Bond shall be for satisfactory performance of the Contract and fulfillment of any guarantees required. The Payment Bond shall guarantee payment of all lawful claims for labor performed and materials furnished in fulfillment of the Contract. Bidders shall submit, along with the bid, the name of the person, firm, or corporation that will execute Payment and Performance & Maintenance Bonds. The criteria for acceptability of the Surety

HZI JOB NO. R315987.02 00100 - 4

Company issuing Payment Bonds, Performance Bonds and Maintenance Bonds shall include the following:

a. The Surety Company must be authorized to do business in the State of Texas, which authorization must be recorded in the files of the Texas State Board of Insurance.

b. The surety company must be authorized to issue payment and performance bonds in the amount required for the Contract, which authorization must be recorded in the files of the Texas State Board of Insurance.

c. The person executing the Payment Bond, Performance Bond and Maintenance

Bond must be a licensed Texas local recording agent and such licensing must be recorded in the files of the Texas State Board of Insurance.

d. The person executing the Payment Bond, Performance Bond and Maintenance

Bond must be authorized by the surety company to execute performance and payment bonds on behalf of the company in the amount required for the Contract and such authorization must be recorded in the files of the Texas State Board of Insurance, and

e. The surety company must have a rating of at least "B", “A” or “A+” in the current

Best's Key Rating Guide; or, if the surety company does not have any such rating due to the length of time it has been a surety company, the surety company must demonstrate eligibility to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety company listed in the current United States Department of Treasury Circular 570. Such performance and payment bonds shall meet the criteria contained in the rules and regulations promulgated by the United States Department of Treasury with respect to performance and payment Bonds for federal jobs, including specifically the rules related to the underwriting limitation. The District shall satisfy itself that such surety company and bonds meet such criteria.

Failure to meet the criteria for acceptability of Surety Company issuing Payment Bonds, Performance Bonds and Maintenance Bonds will result in disqualification of the bid.

The Payment Bonds, Performance Bonds and Maintenance Bonds shall remain in effect at least one year beyond final acceptance of work under the Contract by the Owner.

HZI JOB NO. R315987.02 00100 - 5

19. Owner reserves right to require bidders upon request to submit financial statement and summary of experience in construction of similar projects, including project costs, locations, references, and resumes of personnel assigned to jobs; and to reject bids of bidders Owner finds unqualified.

20. ECONOMIC DISINCENTIVE FOR LATE COMPLETION OF WORK.

The CONTRACTOR and the OWNER agree that time is of the essence of this Contract. The CONTRACTOR and the OWNER agree that the Contract is based on completion of the Work by CONTRACTOR in the time specified in the Contract. CONTRACTOR and the OWNER agree that for each and every calendar day the work or any portion thereof shall remain uncompleted after the expiration of the time limit set in the Contract, or as extended under the provisions for extension of time in this Contract, CONTRACTOR shall be liable to OWNER for an economic disincentive pursuant to Section 49.271(e) of the Texas Water Code, in the amount of $150 for each calendar day. The OWNER shall have the option to deduct and withhold said amount from any monies that the OWNER owes the CONTRACTOR or to recover such amount from the CONTRACTOR or the Sureties on the CONTRACTOR’s bond.

21. INSURANCE.

CONTRACTOR shall maintain such insurance as specified in the Supplementary Conditions.

22. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.

a. General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall ascertain the general prevailing wage rate received by the classes of workers employed on projects similar to this project and shall specify in the call for bids and in the Contract the minimum wage rates which shall be paid for each type of worker. This statute further provides that the CONTRACTOR or subcontractors shall pay, as penalty, to the OWNER Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. The OWNER is authorized to withhold from the CONTRACTOR the amount of this penalty from any payment due under the Contract.

The statute likewise requires that the CONTRACTOR and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the accrual per diem wages paid to each worker. These records are open to the inspection of the OWNER.

HZI JOB NO. R315987.02 00100 - 6

b. The minimum wage rates that apply to this Contract are those adopted by Harris

County. Contractor agrees to review and ascertain such wage rates and to pay at least such minimum rates.

23. TAXES, LICENSES AND FEES.

Certain taxes, licenses, fees and other similar items are part of the cost of the work and it shall be CONTRACTOR’S responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to the same. The prices, sums, rates and other charges set forth in the CONTRACTOR’S bid shall cover and include all such costs. OWNER is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. OWNER shall provide CONTRACTOR, if requested by CONTRACTOR in writing, with a completed Texas Sales and Use Tax Exemption Certification as evidence of the applicability of such exemption and CONTRACTOR shall not collect Texas sales and use taxes from OWNER with respect to this contact. CONTRACTOR and all subcontractors to CONTRACTOR shall issue a Texas Sales and Used Tax Exemption Certification with respect to, and shall not pay Texas sales and use taxes on, all purchases of the following items that are exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.311: (i) tangible personal property that will be incorporated into OWNER’s realty; (ii) tangible personal property that is necessary and essential for the performance of this contact and is consumed entirely on the job site; and

(iii) taxable services for use in the performance of this contract that are performed at the job site and are either integral to the performance of this contract or expressly required to be provided by this contract. In addition, CONTRACTOR and all subcontractors to CONTRACTOR (i) shall not include any provision for Texas sales and use taxes with respect to such exempt items in any bid or contract amount, and (ii) shall pass on to the OWNER cost savings due to the exempt status of such exempt items. CONTRACTOR’s contracts with all subcontractors to CONTRACTOR shall include the foregoing provision regarding the exemption from Texas Sales and use taxes. CONTRACTOR must pay taxes on items that are not exempt.

24. OWNER and ENGINEER disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others.

OWNER and ENGINEER further disclaim responsibility for interpretation of that data by Bidder, i.e. projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or underground facilities.

END OF SECTION

HZI JOB NO. R315987.02 00300 - 1

SECTION 00300

PROPOSAL AND BID SCHEDULE

For furnishing necessary plant, labor, material, equipment, incidentals, and operations, and performing necessary work required for the Private Sanitary Sewer Force Main and Public

Waterline Extension on Rankin Road serving Niazi Family Investments, Ltd.

FOR

Niazi Family Investments, Ltd.

Niazi Family Investments, Ltd.

c\o Huitt-Zollars, Inc.

10350 Richmond Avenue, Suite 300

Houston, Texas 77042

Gentlemen:

The undersigned, as bidder, declares that he has carefully examined the Instructions to Bidders, Drawings, and Specifications, Supplementary Conditions and has carefully examined the locations, conditions, and classes of materials of the proposed work, and agrees that he will provide all necessary machinery, tools, apparatus, services, and other means of construction, and will do all the work and furnish all the materials called for in the Contract Documents in the manner prescribed therein and according to the requirements of the Owner as therein set forth, for the unit price amounts according to the accompanying bid schedule, which becomes part of this proposal. (Refer to Section 01026, Unit Prices.)

If, for any bid item, there is a conflict between unit price written in words and unit price in figures, or between unit price and item total price, unit price written in words will govern.

It is understood that the Owner reserves the right to award any combination of the bid items included in the Bid Schedule.

It is understood and agreed that all the work is to be complete and ready for use within ____ calendar days (to be filled by the Contractor) after the date on which written notice to commence work is received.

HZI JOB NO. R315987.02 00300 - 2

It is understood that final payment and remaining retained percentage will not become due until acceptance of the work by the Owner.

Accompanying this Proposal is a Certified or Cashier's Check, or Bidder's Bond conforming to the requirements of the Instructions to Bidders payable to the Owner for 5 percent (5%) of the greatest individual amount bid, said bid security being in the amount of:

(Amount Written in Words)

Dollars $

It is understood that the bid securities will be returned to the bidder in compliance with the provisions of the Instructions to Bidders, except when the bidder is the successful bidder but fails to enter into a Contract with the Owner and furnish the required bonds within ten (10) days after the acceptance by the Owner of this Proposal, in which case, the deposit shall be forfeited and become the property of the Owner.

It is understood that the Owner reserves the right to reject any or all bids, or to accept any bid considered advantageous.

In the event of award of the Contract to the undersigned, the undersigned will furnish a

Performance & Maintenance Bond and a Payment Bond conforming to the requirements of the

Instructions to Bidders each in the amount of 100 percent of the amount of the Contract. These

Bonds shall remain in effect at least until one year after the date when final payments become due, except as otherwise provided by laws and regulations or by the Contract Documents. The

Performance & Maintenance Bond shall be security for the faithful performance of the Work and fulfillment of any guarantees required including to maintain and keep free from defects in materials and workmanship and to properly repair, replace and restore defects in materials and workmanship within one year after acceptance of the work. The Payment Bond shall be a material and labor payment bond in the amount 100 percent of the amount of the contract to guarantee payment of all lawful claims for labor performed and materials furnished in the fulfillment of the Contract; and the surety for such bonds shall be a bonding company whose name appears on the current list published by the United States Treasury Department of Accepted Sureties or a bonding company furnishing a certificate from Texas State Board of Insurance, unless otherwise authorized by the

Owner in writing.

HZI JOB NO. R315987.02 00300 - 3

The undersigned certifies that the bid amounts contained in the Proposal have been carefully checked and are submitted as correct and final, and these amounts will remain firm for 90 days following submittal.

Witness Contractor

Seal By

(If Bidder is a Corporation)

Date

Title

Street Address

Secretary of Corporation City, State, and Zip Code

Telephone Number

Acknowledge receipt of Addenda below:

Date Received

Addendum No.

BID SCHEDULE

Item Approx. Meas. Item Description with Unit Unit Total No. Quant. Unit Bid Price Written in Words Price Bid

HZI JOB NO. R315987.02 00300-4

J:\Proj\GREENS PARKWAY MUD\Rankin Road King Fuels\05 Design\05.10 Specifications\00-Division 00\00300.doc

PREPARATION ITEMS

01 1 JOB Site preparation shall be considered incidental to the various items and no separate payment will be made for site preparation.

$0.00______ $0.00________

02 1 JOB Mobilization, performance & maintenance bond, payment bond and insurance; at

Dollars and Cents per the complete job.

03 1 LS Storm Water Pollution Prevention Plan for the duration of construction; at per Lump Sum.

04 1 LS Traffic Control Plan, Complete In Place, the sum of;

per Lump Sum.

PREPARATION ITEMS - SUBTOTAL $_______________________________

HZI JOB NO. R315987.02 00300-5

00\00300.doc

SANITARY SEWER FORCE MAIN ITEMS

05 1 LS Liberty Pumps 2460 LSG/LSGX-

Series "Omnivore" 2 HP Simplex Grinder Package Lift Station, Complete in Place, 06 1925 LF 2” PVC Force Main, including

Pipe and installation, Complete in Place, the sum of;

per Linear Foot.

07 230 LF Shallow Bore (<9 FT.)

2” PVC Force Main with 6” Steel Casing; at per Linear Foot.

08 410 LF Deep Bore (Approx. 9+ FT.)

2” PVC Force Main with 6” Steel Casing; at

HZI JOB NO. R315987.02 00300-6

00\00300.doc

09 1 EA 4-Foot Diameter Sanitary Corrosion Resistant Force Main Discharge Manhole, Complete in Place, per Each.

010 260 LF Trench Excavation and Safety System for Access Pit for Sanitary Lines Over 5-Foot Deep, Complete In Place, the sum of;

per LF.

011 1 LS Restore all Disturbed Areas With Grass Sod Where Access Pits, Receiver Pits, Service Pits, Point Repairs, Open-Cut Installation, and Trench Excavation Areas are to be Excavated for Sanitary Sewer Force Main Installation, Complete In Place, the sum of;

SANITARY SEWER FORCE MAIN ITEMS - SUBTOTAL $

HZI JOB NO. R315987.02 00300-7

00\00300.doc

WATERLINE EXTENSION ITEMS

012 600 LF 8” C-900 PVC Waterline including pipe, and installation, Complete in Place, the sum of;

per linear foot.

013 3 EA 8” Gate Valve and Box Complete in Place; at per each.

014 1 EA Fire Hydrant Set including #9700

Portable Automatic Flushing Device or Approved Equal as per plans, Complete in Place, at

015 1 EA Fire Hydrant Assembly as per plans, Complete in Place, at

HZI JOB NO. R315987.02 00300-8

00\00300.doc

016 1 EA 8-Inch to 12-Inch Wet Connection, per Each.

017 490 LF Trench Excavation and Safety System for Access Pit for Water Lines Over 5-Foot Deep, 018 1 LS Restore all Disturbed Areas With

Grass Sod Where Access Pits, Receiver Pits, Service Pits, Point Repairs, Open-Cut Installation, and Trench Excavation Areas are to be Excavated for Waterline Installation, Complete In Place, the sum of;

WATERLINE EXTENSION ITEMS - SUBTOTAL $

HZI JOB NO. R315987.02 00300-9

00\00300.doc

SUPPLEMENTAL ITEMS

019 1000 LF

Well Pointing, at Thirty Dollars

And Zero Cents

$ 30.00 $ 30,000.00

020 1000 LF Wet Sand Bedding, at

Thirty Dollars

And Zero Cents

$ 30.00 $ 30,000.00

SUPPLEMENTAL ITEMS - SUBTOTAL $ 60,000.00

HZI JOB NO. R315987.02 00300-10

00\00300.doc

BID SUMMARY

PREPARATION ITEMS - SUBTOTAL $

SANITARY SEWER FORCE MAIN ITEMS - SUBTOTAL $

WATERLINE EXTENSION ITEMS - SUBTOTAL $

SUPPLEMENTAL ITEMS – SUBTOTAL $ 60,000.00

BASE BID GRAND TOTAL $

HZI JOB NO. R315987.02 00500 - 1

SECTION 00500

CONTRACT AGREEMENT

STATE OF TEXAS :

COUNTY OF HARRIS :

THIS AGREEMENT is dated as of the ______ day of __________________ in the year 2026 by and between Niazi Family Investments, Ltd of the County of Harris, and the State of Texas, a government agency of the State of Texas with its principal place of business at 14825 Willis St., Houston, Texas 77039, hereinafter called OWNER, and CONTRACTOR, a Texas corporation with its principal place of business at _____________________, hereinafter called CONTRACTOR.

OWNER and CONTRACTOR, for and in consideration of the mutual covenants hereinafter set forth, and other good and valuable consideration the sufficiency of which is acknowledged by

CONTRACTOR and OWNER, agree as follows:

ARTICLE 1. WORK

CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.

ARTICLE 2. ENGINEER

The Project has been designed by Huitt-Zollars, Inc., of Houston, Texas, who is hereinafter called

ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the

Work in accordance with the Contract Documents.

ARTICLE 3. CONTRACT TIME

3.1 The Work will be substantially completed within ____ calendar days after the date when the

Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.07 (B) of the

General Conditions within ____ calendar days after the date when the Contract Time commences to run.

HZI JOB NO. R315987.02 00500 - 2

3.2 Liquidated Damages

OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with

Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER One Hundred Fifty Dollars ($150.00) for each day that expires after the time specified in paragraph 3.1 for substantial completion until the Work is substantially complete. CONTRACTOR and OWNER agree that the amount of One Hundred Fifty Dollars ($150.00) for liquidated damages is a reasonable forecast of just compensation to OWNER in the event of a delay.

ARTICLE 4. CONTRACT PRICE

4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with the unit prices stipulated in the Bid Proposal, which is hereby made a part of this Agreement. It is understood that any bid item may be either reduced or increased in quantity up to twenty-five percent (25%) of the total quantity at the option of the OWNER and the

CONTRACTOR's unit bid prices shall remain the same.

ARTICLE 5. PAYMENT PROCEDURES

CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General

Conditions. Applications for Payment will be processed by ENGINEER as provided in the General

5.1 Progress Payments

OWNER shall make progress payments on account of the Contract Price on the basis of

CONTRACTOR's Applications for Payment as recommended by ENGINEER, on or about the fifth(5) day of each month during construction as provided below. All progress payments will be on the basis of the progress of Work measured by the schedule of values provided for in paragraph 14.01 of the General Conditions. Prior to Substantial Completion progress payments will be in the amount equal to 90% of the Work completed, and 90% of materials and equipment not incorporated in the Work but delivered and suitably stored, less in each case the aggregate of payments previously made. The retainage will be as governed by the

“Texas Water Code” as currently amended.

HZI JOB NO. R315987.02 00500 - 3

5.2 Final Payment

Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07.

ARTICLE 6. CONTRACTOR'S REPRESENTATIONS

In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:

6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract

Documents, Work, locality, and with all local conditions and federal, state and local ordinances, rules and regulations that in any manner may affect cost, progress or performance of the Work.

6.2 CONTRACTOR has studied carefully all reports of investigations and tests of subsurface and latent physical conditions at the site or otherwise affecting cost, progress or performance of the Work which were relied upon by ENGINEER in the preparation of the

Drawings and Specifications and which have been identified in the Supplementary

6.3 CONTRACTOR has made or caused to be made examinations, investigations and tests and studies of such reports and related data in addition to those referred to in paragraph 6.2 and he deems necessary for the performance of the Work at the Contract Price, within the

Contract Time and in accordance with the other terms and conditions of the Contract

Documents; and no additional examinations, investigations, tests, reports or similar data are or will be required by CONTRACTOR for such purposes.

6.4 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract

Documents.

6.5 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by

ENGINEER is acceptable to CONTRACTOR.

ARTICLE 7. CONTRACT DOCUMENTS

The Contract Documents which comprise the entire agreement between OWNER and

CONTRACTOR are attached to this Agreement, made a part hereof and consists of the following:

HZI JOB NO. R315987.02 00500 - 4

J:\Proj\GREENS PARKWAY MUD\Rankin Road King Fuels\05 Design\05.10 Specifications\00-Division 00

7.1 This Agreement;

7.2 Performance and other Bonds;

7.3 Notice of Award;

7.4 General Conditions;

7.5

7.6

7.7

7.8

7.9

7.10

7.11

7.12

Supplementary Conditions;

Special Conditions;

Specifications bearing the title "Specifications for PRIVATE SANITARY SEWER FORCE

MAIN AND WATERLINE EXTENSION for Niazi Family Investments, Ltd. dated

September 2026;

Construction Drawings;

Addenda (if any);

CONTRACTOR's Bid;

Documentation submitted by CONTRACTOR prior to Notice of Award; and

Any Modification, including Change Orders, duly delivered after execution of Agreement.

There are no Contract Documents other than those listed above in this Article 7. The Contract

Documents may only be altered, amended or repealed by a Modification (as defined in Section 1 of the General Conditions).

ARTICLE 8. MISCELLANEOUS

8.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions still have the meanings indicated in the General Conditions.

8.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding or another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any

HZI JOB NO. R315987.02 00500 - 5

written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

8.3 OWNER and CONTRACTOR each binds himself, his partners, successors, assigns and legal representatives to the other party hereto, his partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the

Contract Documents.

IN WITNESS WHEREOF, the parties hereto have signed this Agreement in quintuplicate (5). One counterpart each has been delivered to OWNER, CONTRACTOR, SURETY and ENGINEER (2).

All portions of the Contract Documents have been signed or identified by OWNER and

CONTRACTOR or by ENGINEER on their behalf.

This Agreement will be effective on _________________________, 2026.

OWNER: CONTRACTOR:

Niazi Family Investments LTD

By: By:

(Signature) (Signature)

Name: Name:

Title: Title:

Attest: Attest:

(Signature) (Signature)

Name: Name:

Title: Title:

HZI JOB NO. R315987.02 00612 - 1

SECTION 00612

PERFORMANCE AND MAINTENANCE BOND

STATE OF TEXAS Contract Date

COUNTY OF Date Bond Executed

PRINCIPAL

SURETY

OWNER: Niazi Family Investments LTD

PENAL SUM OF BOND (in words and figures) being 100 percent of the Contract Price.

CONTRACT for Private Sanitary Sewer Force Main and Public Waterline Extension located in Green’s Parkway Municipal Utility District, Harris County, Texas.

KNOW ALL PERSONS BY THESE PRESENTS, that we, Principal and Surety above named, are held and firmly bound unto OWNER, its successors and assigns, in the penal sum of the amount stated above, for the payment of which sum well and truly to be made, we bind ourselves and our respective heirs, executors, administrators, officers, directors, shareholders, partners, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, Principal entered into that certain Contract with OWNER, dated the same date as this bond, to which Contract reference is made for all purposes.

NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if Principal shall well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of the Contract during the original term of the Contract and any extensions thereof that may be granted by OWNER, with or without notice to Surety, and during the life of any guaranty or warranty required under the Contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of the Contract that may hereafter be made, notice of which modifications to Surety being hereby waived, then this obligation to be void; otherwise to remain in full force and effect.

HZI JOB NO. R315987.02 00612 - 2

The bound parties have executed this instrument pursuant to authority of their respective governing body, to be effective on the same date of the Contract.

ATTEST

By By

Name Name

Title Title

Address

(SEAL)

By By

Name Name

Title Title

Physical Address:

Mailing Address:

Telephone

LOCAL RECORDING AGENT PERSONAL IDENTIFICATION NUMBER:

The name and address of the Resident Agent of Surety is:

Surety must attach its original power of attorney to this BOND.

HZI JOB NO. R315987.02 00612 - 3

CERTIFICATE AS TO CORPORATE PRINCIPAL

I, , certify that I am the secretary of the corporation named as Principal in the Bond; that , who signed the bond on behalf of Principal, was then of the corporation; that I know his or her signature, and his or her signature is genuine; and that the Bond was duly signed for and on behalf of the corporation by authority of its governing body.

(Corporate Seal)

ATTACH POWER OF ATTORNEY

(to Performance & Maintenance Bond)

HZI JOB NO. R315987.02 00622 - 1

SECTION 00622

PAYMENT BOND

STATE OF TEXAS Contract Date

COUNTY OF Date Bond Executed

OWNER: Niazi Family Investments LTD

PENAL SUM OF BOND (in words and figures) being 100 percent of the Contract Price.

CONTRACT for Private Sanitary Sewer Force Main and Public Waterline Extension located in Green’s Parkway Municipal Utility District, Harris County, Texas.

KNOW ALL PERSONS BY THESE PRESENTS, that we, Principal and Surety above named, are held and firmly bound unto OWNER, its successors and assigns, in the penal sum of the amount stated above, for the payment of which sum well and truly to be made, we bind ourselves and our respective heirs, executors, administrators, officers, directors, shareholders, partners, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, Principal entered into the Contract with OWNER, dated the same date as this bond, to which Contract reference is made for all purposes.

NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if Principal shall promptly pay claimants for all labor, subcontracts, materials, specially fabricated materials performed or furnished under or by virtue of the Contract, and duly authorized modifications and normal and usual extras thereto, notice of which modifications to Surety being hereby waived, then this obligation shall be void, otherwise to remain in full force and effect; labor, subcontracts, materials, and specially fabricated materials shall be construed in accordance with Chapter 2253, Texas Government Code.

HZI JOB NO. R315987.02 00622 - 2

PROVIDED, HOWEVER, that OWNER having required Principal to furnish this Bond in order to comply with the provisions of Chapter 2253, Texas Government Code, all rights and remedies on this Bond shall inure solely to such claimants and shall be determined in accordance with the provisions, conditions, and limitations of the aforesaid Government

Code to the same extent as if they were copied at length herein.

The bound parties have executed this instrument pursuant to authority of their respective governing body, to be effective on the same date of the Contract.

By By

Name Name

Title Title

Address

By By

Name Name

Title Title

Physical Address:

Mailing Address:

Telephone

LOCAL RECORDING AGENT PERSONAL IDENTIFICATION NUMBER:

The name and address of the Resident Agent of Surety is:

Surety must attach its original power of attorney to this BOND.

HZI JOB NO. R315987.02 00622 - 3

CERTIFICATE AS TO CORPORATE PRINCIPAL

I, , certify that I am the secretary of the corporation named as Principal in the Bond; that , who signed the bond on behalf of Principal, was then of the corporation; that I know his or her signature, and his or her signature is genuine; and that the Bond was duly signed for and on behalf of the corporation by authority of its governing body.

(Corporate Seal)

ATTACH POWER OF ATTORNEY

(to Payment Bond)

HZI JOB NO. R315987.02 00630 - 1

SECTION 00630

GUARANTEE

STATE OF TEXAS :

COUNTY OF HARRIS :

KNOWN ALL MEN BY THESE PRESENTS:

That, _____________________ (the undersigned), Contractor for King Fuel’s Private Sanitary

Sewer Force Main and Public Waterline Extension in Green’s Parkway MUD, Harris County, Texas, jointly and severally represent, warrant, and guarantee as follows:

1. That all of the work ("Work") contemplated by that certain Contract dated

, 20 , between Niazi Family Investments LTD ("Owner") and CONTRACTOR, the undersigned ("Contractor") has been completed in accordance with the plans, specifications, and change orders referred to therein.

2. That all Work is free from faulty material in every particular throughout.

3. That all Work is free from improper workmanship throughout.

4. That all Work is guaranteed against unusual damage from proper and usual wear.

5. That Contractor will replace and/or re-execute, without cost to the Owner, such work as may be found to be defective or not completed in accordance with the plans, specifications, and change orders, and will make good all damages caused to other work or materials as a result of such defective work or its required replacement of re-execution.

6. That Contractor agrees to replace and/or re-execute defective or improperly completed work for maintenance and all other purposes found within one (1) year after the date of final and unconditional acceptance of the Work by Owner, evidenced by Owner's Certificate of Acceptance of Work and/or the date of Owner's written acceptance of Work.

HZI JOB NO. R315987.02 00630 - 2

7. That Contractor agrees in the event that Contractor attempts to replace and/or re-execute defective or improperly completed work during the initial one year period of this Guarantee, but Contractor does not properly replace and/or re-execute such defective or improperly completed work, then the Guarantee period may be extended by Owner at its sole option for an additional period necessary for proper replacement and/or re-execution of the Work by the Contractor within the terms of this Guarantee.

8. That Contractor agrees that the one (1) year period of this Guarantee will not limit

Owner's other rights under common law to have defects remedied when discovered after one (1) year.

9. That notices of defective or improperly completed work shall be made in writing by certified or registered mail, return receipt requested, and addressed as follows:

OWNER Niazi Family Investments LTD

CONTRACTOR ________________________

EXECUTED on this the day of , 20 .

(Contractor)

BY:

(Printed Name and Title)

HZI JOB NO. R315987.02 GENERAL REQUIREMENTS 00799 - 1

GENERAL CONDITIONS

OF THE CONTRACT

for

CONSTRUCTION

When these documents make reference to the General Conditions, the General Conditions of the Contract for Construction as prepared by the AIA and referenced as document No. A201-1997 shall serve as such

General Conditions. Although the General Conditions are not included herein in written form and are only included by reference, they shall be in full force and effect as though they were included herein in their entirety. A copy of the General Conditions is available to Bidders or the CONTRACTOR upon request.

HZI JOB NO. R315987.02 SUPPLEMENTARY CONDITIONS 00800 - 1

SECTION 00800

SUPPLEMENTARY CONDITIONS

These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract and other provisions of the Contract Documents as indicated below. All provisions which are not so amended or supplemented remain in full force and effect.

1. Definitions

The terms used in these Supplementary Conditions which are defined in the Standard General Conditions of the Construction Contract have the meanings assigned to them in the General Conditions.

The following definitions are added to Article 1 of the Standard General Conditions:

"or equal" wherever used in these Contract Documents shall mean "equivalent". "Ap-prove or Approval" wherever used in these Contract Documents shall mean "is in General Conformance". "Inspection or Supervision" wherever used in these Contract Documents shall mean "Periodic Observation of the Work."

2. Copies of Documents

Amend the first sentence of paragraph 2.02 of the General Conditions to read as follows:

OWNER shall furnish to CONTRACTOR up to five copies of the Contract Documents as are reasonably necessary for the execution of the Work.

3. Before Starting Construction

Delete paragraph 2.01 (B) of the General Conditions and replace with the following:

Before any work at the site is started, CONTRACTOR shall deliver to OWNER, with a copy to ENGINEER, insurance certificates (and other evidence of insurance requested by OWNER) which CONTRACTOR is required to purchase and maintain in accordance with Article 5 of the General Conditions.

4. Physical Conditions at Site

The contract drawings or technical specifications may contain soil boring logs or geotechnical reports which indicate subsoil conditions at the site. As noted in the General Conditions, neither the OWNER nor the ENGINEER guarantees the accuracy of the information obtained through these investigations, and such information, though provided as assistance to the CONTRACTOR, is not part of the Contract documents.

The CONTRACTOR shall make such examinations, investigations, tests, and studies as he deems necessary in order to furnish the Work at the Contract Price, within the Contract Time and in accordance with the terms and conditions of the Contract

5. CONTRACTOR'S Liability Insurance

Add the following requirements and specified limits of liability to paragraph 5.04 of the General Conditions:

HZI JOB NO. R315987.02 SUPPLEMENTARY CONDITIONS 00800 - 2

The CONTRACTOR shall not commence work under this Contract until he has obtained, at his expense, all insurance required under this section of the General Conditions and by the Contract Documents, and such insurance has been approved by the OWNER, nor shall the CONTRACTOR allow any subcontractor to commence work on any subcontract until all similar insurance required of the subcontractor has been so obtained and approved. Such insurance shall remain in full force and effect on all phases of the work, whether or not the work is occupied or utilized by the OWNER, until all work under the Contract is completed and has been accepted by the OWNER.

Nothing contained in the insurance requirements shall be construed as limiting the extent of the CONTRACTOR's responsibility for payment of damages resulting from his operations under the Contract.

Any insurance bearing an adequacy of performance will be maintained after completion of the project for the full guarantee period.

The CONTRACTOR shall obtain and maintain for the full period of the Contract the following types of insurance in the form, minimum limits and amounts herein specified or as may be otherwise required in the Contract Documents. The CONTRACTOR shall automatically renew any policy which expires during the performance of his Contract and notify the OWNER and ENGINEER of such a renewal prior to expiration date.

A. Workmen's Compensation Including Occupational Disease, and Employer's

Liability Insurance

Before commencement of the work, the CONTRACTOR shall take out and maintain during the life of this Contract, Statutory Workmen's Compensation Insurance and Occupational Disease Disability Insurance for all of his employees to be engaged in work under this Contract, and in any case any work is sublet, the CONTRACTOR shall require any subcontractor similarly to provide Workmen's Compensation and Occupational Disease Disability Insurance for the latter's employees engaged in such work unless such employees are covered by the protection afforded by the CONTRACTOR'S insurance. In case any class of employees engaged in hazardous work under the Contract is not protected under the Workmen's Compensation Statute, or in case there is no applicable Workmen's Compensation Statute, the CONTRACTOR shall provide, and shall cause each subcontractor to provide adequate insurance for the protection of his employees not otherwise protected.

B. Public Liability and Property Damage Insurance

Before commencement of the work, the CONTRACTOR shall submit written evidence that he and all his subcontractors have obtained for the period of the Contract full Comprehensive General Liability and Property Damage Insurance coverage. This coverage shall protect the CONTRACTOR; the OWNER; the ENGINEER, its architects and engineers; and each of their officers, agents and employees; from claims for damages for bodily or injury, sickness or disease, including death, and from claims for damages to property, which may arise directly or indirectly out of, or in connection with the performance of work under this Contract by the CONTRACTOR, by any of his subcontractors, or by anyone directly or indirectly employed of either of them, or under the control of either of them, and the minimum amount of such insurance shall be as follows unless higher amounts are otherwise required in the Contract Documents:

Public Liability Insurance in an amount not less than One Million Dollars ($1,000,000) for damages arising out of bodily or personal injury, sickness or disease, or death of one persons and subject to the same

HZI JOB NO. R315987.02 SUPPLEMENTARY CONDITIONS 00800 - 3

limit for each person and in an amount not less than Two Million ($2,000,000) in any one occurrence; and Property Damage Insurance in any amount not less than One Million Dollars ($1,000,000) for all damages arising out of injury to or destruction of property of others in any one occurrence with an aggregate limit in the same amount.

The Property Damage portion of this coverage shall include, where applicable, explosion, collapse, and underground exposure coverage. In addition, where Completed Operation Insurance is applicable, such coverage will be maintained after completion and acceptance of the project for the full guarantee period.

C. Automobile Liability and Property Damage Insurance

Before commencement of the Work, the CONTRACTOR shall submit written evidence that he and all his subcontractors have obtained Automobile Liability and Property Damage Insurance coverage on all self-propelled vehicles used in connection with the Contract, whether owned, non-owned, or hired. The CONTRACTOR shall provide and maintain business automobile liability insurance with limits for bodily injury and property damage combined of not less than One Million Dollars ($1,000,000).

6. Property Damage

Delete paragraph 5.06 (A) of the General Conditions in its entirety and insert the following in its place:

5.06(A)Unless otherwise provided in these Supplementary Conditions, CONTRACTOR shall purchase and maintain property insurance upon the Work at the site to the full insurable value thereof…

This is the start of the file's text. The full file is on GovTribe.