This document is a specification section (Section 02510) for Base Course Gravel Surfacing, issued under project number 25IFB17399, involving CSP (likely Colorado State Parks). The project requires furnishing and constructing gravel surfacing at specified locations, with delivery scheduled between October 1st and November 15th, 2025. Contractors are asked to bid on two potential tonnage amounts - 2,000 tons or 2,500 tons - with CSP reserving the right to select the most appropriate quantity. The gravel will be hauled to a CSP gravel pit near the corrals, with CSP providing a loader and operator to manage the gravel pile.
The aggregate specifications require sound, durable gravel and sand particles with specific gradation requirements, including precise sieve size percentages and a plasticity index of 0-6. Payment will be made at the contract price per ton for gravel surfacing, with tonnage weight tickets mandatory for the project. The contractor is responsible for obtaining all necessary permits and haul agreements. The technical specifications provide detailed requirements for material composition, ensuring the gravel meets precise engineering standards for base course surfacing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SDVendorManual_20240822.pdf | ||
| Delivery Map 25IFB17399.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02510
SPECIFICATIONS 25IFB17399 BASE COURSE GRAVEL SURFACING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The work shall consist of furnishing all labor, tools, equipment and materials necessary to construct the gravel surfacing at the locations shown on the plans.
PART 2 - MATERIALS
2.1 The aggregate for gravel surfacing shall consist of sound durable particles of gravel and sand, which may include limited amounts of fine soil particles. The gravel surfacing shall conform to the following gradation requirements:
Sieve Size Percent Passing by Weight
1" 100 3/4" 80-100 1/2” 68-91 No. 4 42-70 No. 8 29-58 No. 40 10-35 No. 200 3.0–20.0
Plasticity Index: 0-6
PART 3 - EXECUTION
3.1 Gravel will be hauled to the CSP gravel pit near the corrals. Contractor is responsible for all necessary permits and haul agreements. CSP will provide a loader and operator to push up gravel into a pile. Delivery will be Oct 1st through Nov 15th, 2025.
Gravel needs to be bid in two tonnage amounts for the location.
2,000 ton 2,500 ton CSP will choose which tonnage will work best for the project.
PART 4 - METHOD OF PAYMENT
4.1 The accepted quantities of gravel surfacing shall be paid for at the contract price per ton complete in place.
4.2 Tonnage weight tickets for gravel surfacing will be required on this project.