Specifications 23IFB8275.pdf

PDF 72 KB Posted

Attached to
Air Compressor
Solicitation number
23IFB8275
Issued by
Day County, South Dakota

About this file

This document is an Invitation for Bid (IFB) from the South Dakota Army National Guard for the delivery and installation of a 40HP Ingersoll Rand SSR-EP-40SE or equivalent air compressor unit at their Mitchell, SD facility. The scope of work includes the removal of the current air compressor, installation of the new unit, and proper disposal and recycling of all materials. The work must be performed in accordance with applicable South Dakota building codes and standards. Site visits are available upon request to assess the installation location. Bids are due by the date specified in the IFB.

The IFB stipulates that the new air compressor must meet or exceed the specifications of the existing 460V, 3-phase Ingersoll Rand model, including operating pressure, maximum discharge pressure, and electrical requirements. The contractor's price must include all parts, equipment, and labor needed to complete the installation, including any subcontractors required. No brand name restrictions are intended, and equivalent models are acceptable.

View the file

Other files

File Type Posted
SDVendorManual_20211221.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Compressor IFB 23IFB8275

• 40HP Ingersoll Rand model: SSR-EP-40SE, 460V or equal. (This solicitation includes the use of a brand name for the purpose of describing the standard of quality, performance, and characteristics desired and is not intended to limit or restrict competition as required by SDCL 5- 18A-19.)

• 125psi rated operating pressure.

• 128psi max discharge pressure.

• 54 total package amps.

• 120 control voltage with a contactor and assembly amp rating of 85.

• Removal of current air compressor, and installation of new air compressor at Mitchell SD

CSMS#1.

Contractor shall replace AC#1, Contractor's price shall include all parts, equipment and labor needed to complete this job, that includes any other contractors that you would need to hire, such as an electrician, and a lift as this compressor is up in a mezzanine. Contractor shall dispose of all materials and recycle when possible. All work shall be in accordance with State of South Dakota currently adopted codes in accordance with South Dakota Codified Law Chapter 11-10 Building codes and Standards. If you would like to come out to the CSMS and look at where it is to know what you will need for equipment.

Must be equivalent to what is currently installed: Ingersoll Rand Model: SSR-EP40SE which is 460V 3-phase.

For site questions or visit contact:

Matt Podhradsky matthew.c.podharadsky.nfg@army.mil Office: 605.995.1629 mailto:matthew.c.podharadsky.nfg@army.mil