This specification document details the fire detection system replacement for the USCGC SPENCER (WMEC-270B), a Coast Guard vessel, for Fiscal Year 2025. The specification requires replacing the existing Siemens/Pyrotronic III fire detection system with a new Consilium Salwico Fire detection system, including all ancillary components. The government will furnish a Consilium Salwico Fire detection system installation kit with an estimated cost of $77,550.00.
The comprehensive document outlines technical requirements including installation procedures, electrical work, system testing, and quality assurance protocols. Key requirements include providing an Original Equipment Manufacturer (OEM) authorized technical representative to assist with installation, ensure manufacturer compliance, and provide onsite training. The contractor must remove all existing system components, install new electrical cabling, conduct thorough system testing across 16 different zones of the vessel, and complete detailed quality assurance documentation. The specification references multiple Coast Guard drawings, technical publications, and federal regulations governing fire detection systems, with a focus on precise installation, testing, and documentation standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specification_SPENCER_Rev. 1.pdf | ||
| 70Z08025QMECP0016_0001.pdf | ||
| 70Z08025QMECP0016_Solicitation.pdf | ||
| Schedule of Prices.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 (Rev-0)
USCGC SPENCER (WMEC 905)
SPECIFICATION FOR DEPOT REPAIRS
FY2025
Developed By: Celestin Jules
(Rev-0, 18 April 2025)
USCGC SPENCER (WMEC-270B) DEPOT AVAILABILITY FY2025
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .................................................................................. v Consolidated List of Critical Inspection Items ............................................................................................. vi Principal Characteristics ............................................................................................................................. vii General Requirements WORK ITEM 1: 270 Class Fire and Smoke Detection System, Renew iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 320-035, Rev AU, As-Built Electrical One-Line Diagram Coast Guard Drawing 901 WMEC 436-003, Rev R, Fire & Smoke Detection Sys & QDeck Monitoring
Sys Blk & IWD Coast Guard Drawing 901 WMEC 436-006, Rev -, Ship Wide Fire Detection Wiring Diagram Coast Guard Drawing 905 WMEC 320-014, Rev AP, Electrical One-Line Diagram
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) 3365B, SWBS 436, Oct 2000, Fire and Smoke Detection System Coast Guard Technical Publication (TP) ME-H4-0001-V0, SWBS 436, April 2025, Fire Detection
System – Salwico Cruise – Quick & User Guide, Service, Maint & Install Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard
Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
46 CFR 113.10, July 2024, Fire and Amoke Detecting and Alarm Systems 46 CFR 161.002, July 2024, Fire Detection System Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment MIL-DTL-24643B, August 2002, Cables, Electric, Low Smoke Halogen-Free, for Shipboard Use General
Specification MIL-STD-2003B, October 2020, Department of Defense Standard Practice: Electric Plant Installation
Standard Methods for Surface and Submarines v (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 N *** Consilium Salwico
Fire detection system installation Kit
PN: Q2401251-8Â 1 kt. 77,550.00
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vi (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
This section is not applicable to this package.
vii (Rev-0)
PRINCIPAL CHARACTERISTICS
270' WMEC (B-CLASS)
PHYSICAL
Length overall 270' 0" Length between perpendiculars 255' 0" Beam molded 38' 0" Depth molded, main deck amidships, 01 level amidships
23' 7" 31' 4"
Full load displacement 1,886 long tons Draft, full load to baseline amidships 14' 2" Highest projection above baseline *height approximated
≈ 110' 0"
Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each Ship’s service generators 2 Caterpillar Model C-18 6056464 Diesel engines each coupled to its own Weg model GPW/355B3T AC Generator. 656 KW each @ 0.8 power factor, 450 VAC, 3 phase, 60 cycle
Emergency generators Caterpillar Model C-18 6056464 Diesel engines coupled to its own Weg model GPW/355B3T AC Generator. 656 KW each @ 0.8 power factor, 450 VAC, 3 phase, 60 cycle
Number of propellers 2 Propeller diameter 9' 0" Number of blades, each 4 Pitch Controllable Shaft RPM 260 Shaft diameter 10.55" at exit of hull Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 79,950 gal.
JP-5 total (95%) 19,626 gal.
Potable water total (100%) 8,553 gal.
Hydraulic & lube oil total (95%) 2,561 gal.
1 (Rev-0)
00000_0824_FLT
REC_00000_FLT_Commercial Project @ CG Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color
Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health
Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken. Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm. For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet; for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3 (Rev-0)
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project.
Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Large Quantity Generator (LQG).
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws.
Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities.
Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal;
4 (Rev-0) implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor must be aware of the following:
3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154.
Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.6.1 The Contractor must obtain RapidGate Credentials for access to Base Portsmouth
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
3.7.1 None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK
ITEM # WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT, TOP
COAT, ETC…)
LOCATION (FRAME
& DECK, RELATION
TO EQUIPMENT,
ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE
MANUFACTURER:
ABRASIVE SIEVE
SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN
AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH
SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15
READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE
MANUFACTURER:
ABRASIVE SIEVE
SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA
IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading (mils)
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK
ITEM # WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME
REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
TCTO_TN3060_43600_CJ_0425_270
WORK ITEM 1: 270 Class Fire and Smoke Detection System, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to replace the existing Siemens/Pyrotronic III system to include all ancillary components onboard all 270 WMEC class cutter with the Consilium Salwico Fire detection system.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN
QTY ESTIMATED
COST
($/UNIT)
N *** Consilium Salwico Fire detection system installation Kit
PN: Q2401251-8 1 kt. 77,550.00
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.
2. REFERENCES
COAST GUARD DRAWINGS
FOR A CLASS CUTTERS
Coast Guard Drawing 901 WMEC 320-035, Rev AU, As-Built Electrical One-Line Diagram Coast Guard Drawing 901 WMEC 436-003, Rev R, Fire & Smoke Detection & Quarterdeck
Monitoring System Blk & IWD Coast Guard Drawing 901 WMEC 436-006, Rev -, Ship Wide Fire Detection Wiring Diagram
FOR B CLASS CUTTERS
Coast Guard Drawing 901 WMEC 436-003, Rev R, Fire & Smoke Detection Sys & QDeck
Monitoring Sys Blk & IWD Coast Guard Drawing 901 WMEC 436-006, Rev -, Ship Wide Fire Detection Wiring Diagram Coast Guard Drawing 905 WMEC 320-014, Rev AP, Electrical One-Line Diagram
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3365B, SWBS 436, Oct 2000, Fire and Smoke Detection
System Coast Guard Technical Publication (TP) ME-H4-0001-V0, SWBS 436, April 2025, Fire
Detection System – Salwico Cruise – Quick & User Guide, Service, Maint & Install Manual
12 (Rev-0)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
MIL-DTL-24643B, August 2002, Cables, Electric, Low Smoke Halogen-Free, for Shipboard Use
General Specification MIL-STD-2003B, October 2020, Department of Defense Standard Practice: Electric Plant
Installation Standard Methods for Surface and Submarines 46 CFR 113.10, July 2024, Fire and Amoke Detecting and Alarm Systems 46 CFR 161.002, July 2024, Fire Detection System
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor must provide the services of an OEM authorized/ licensed Tech Rep for the Consilium Salwico fire detection system to accomplish the following on site:
• Provide manufacturer's proprietary system/ equipment information, software, and tools.
• Assist with and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
3.1.2.1 Ensure the Tech Rep is an OEM Certified Representative for the system/equipment stated above and demonstrated on their résumé.
3.1.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.
3.1.2.3 Training. The Tech Rep must provide training documents on how to operate and trouble shoot newly installed Consilium Salwico system to the cutter due upon completion of installation and testing of system.
3.1.2.3.1 Provide onsite training, which must include the following
• Review of documentation
• Safety
13 (Rev-0)
• Review of start-up and operation procedures
• Emergency procedures
• Trouble shooting
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
• Sheathing
• Bulkhead insulation
• Cable ways
3.2 Electrical work. The Contractor must accomplish all electrical work in accordance with SFLC Std Spec 3042, and test cables in accordance with SFLC Std Spec 3041. Utilize the existing wire ways for new cable runs as much as possible.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.3 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.4 Temporary fire and smoke detection system. The Contractor must provide a temporary fire detection system or leave the existing system in place and functional while installing the new fire and smoke detection system.
3.5 Fire and Smoke Detection system removal. The Contractor must accomplish the following
3.5.1 Remove all existing Siemens/Pyrotronics system III components associated with the existing fire detection system as shown on Coast Guard drawing 901 WMEC 436-003 and using Coast Guard drawings 901 WMEC 320-035 FOR A CLASS CUTTERS and 905 WMEC 320-014 FOR B CLASS CUTTERS, as guidance.
3.5.1.1 Contractor must retain the following fire detection system components and package and ship to the address indicated below. Contractor must notify COR when shipped:
NOTE
COR will notify SFLC Supply item manager that components below are being shipped to warehouse and request a due in for the material.
TABLE 1 – SIEMENS/PYROTRONIC SYSTEM III PARTS RETAINED
COMPONENT NSN/PART # QTY
Display Panel PMD-45 NSN: 5998-01-453-4620 4 PLC box located in ECC (contains: PLC, I/O cards, Power Supply) NSN: 1265-01-F25-7046 1
14 (Rev-0)
Aft Vestibule Network Connection Box NSN: 6350-01-F25-7045 1 Aft Vestibule Temperature Box NSN: 6350-01-F25-7042 1 Quarterdeck Remote Annunciator NSN: 6350-01-F25-7041 1
Commander U.S. Coast Guard Surface Forces Logistics Center 2401 Hawkins Point Rd Building 88 Baltimore, MD 21226-5000 ATTN: Receiving
3.5.2 Contractor must remove all existing cable associated with the Siemens/Pyrotronics system III in accordance with SFLC Std Spec 3042.
3.5.3 The Contractor must dispose of all components and cabling not listed in paragraph 3.6.1.1 in accordance with Federal, State and local regulations.
3.6 Fire and Smoke Detection system installation. The Contractor must install the new Consilium Salwico fire detection system as shown on Coast Guard drawing 901 WMEC 436-006 and in accordance with MIL-STD-2003B, 46 CFR 113.10 and 46 CFR 161.002.
3.6.1 The Contractor must run new electrical cabling to the newly installed Consilium Salwico fire detection system and all its ancillary components as shown on Coast Guard Drawing 901 WMEC 436- 006 and in accordance with SFLC Std Spec 3041, SFLC Std Spec 3042 and MIL-DTL-24643B.
3.7 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.7.1 The Contractor must test the newly installed Consilium Salwico fire detection system in accordance with paragraph 4.1 Fire and smoke detection test procedures.
3.8 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
3.9 Boundary test, generic. The Contractor must verify the integrity of all boundaries affected by this work item using one of the methods described in SFLC Std Spec 0740, Appendix C. Submit a CFR.
4. NOTES
4.1 Fire and smoke detection system test procedures. The Contractor must accomplish the following test procedure.
4.1.1 Test each detector listed in the Data Sheet. Contractor must submit a CFR for any discrepancies in the Data Sheet (incorrect locations, incorrect detector type in the space, etc) and provide a “red-line” markup of the corrected Data Sheet. Do not record “UNSAT” data. Any discrepancies must be corrected and retested prior to signing off as “SAT”.
• An ionization or photoelectric detector may be activated by blowing smoke into it or introducing an acceptable aerosol slightly away from the chamber.
15 (Rev-0)
• A thermal detector may be activated by an electric heat gun.
• A flame detector may be activated by holding the flame of a cigarette lighter slightly below or in front of the lens or by producing and infrared light from an IR source into the detector lens.
4.1.2 To test the system, activate a detector or manual pull station. Record each detector and device tested on the attached Data Sheets. Verify the following:
• All audible devices sound and can be silenced from remote annunciators and from the main fire alarm panel.
• System alarm lamp illuminates.
• Proper zone lamp illuminates at the zone module and the remote annunciators.
• Fire Detection System General Alarm activates.
4.1.3 Acknowledge alarm.
• Acknowledge the alarm at the annunciator (without silencing the alarm at the main fire panel).
• Acknowledge alarm at the alarm panel.
4.1.4 Reset the main fire alarm panel.
• Allow time for the smoke to clear out of the detector sensor or for the thermal fire detector to cool down.
• Reset alarm panel.
• Verify on the remote annunciator that the corresponding red LED is not illuminated over the zone for the zone detector sensor being tested.
• Verify on the main fire alarm panel that the corresponding zone is not illuminated.
4.1.5 Record results in Data Sheets below.
16 (Rev-0)
Fire Detection and Alarm System Test Data Sheet
Zone 1
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ar m
Audible alarm (with strobe)
Sm ok e De te ct or
IR
F la m e De te
Th er m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-
-0
An nu nc ia to r, Q ua rt er de ck nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-
-L
Pa ss ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o nl y)
En gi ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
JP
-5
P um p Ro om
Example X X J. Smith 2/16/24
Pilothouse 02-48-0-C X
Passage 02-63-2-L X
XO Stateroom 01-47-2-L X
CO Stateroom 01-47-5-L X
Passage 01-52-0-L X X
P-Way 01-52-0-L in Exh Vent
E02-58-2 X
17 (Rev-0)
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
EO Stateroom 01-58-2-L X
Ward Rm Stateroom 01-68-0-L
X
Ward Rm Stateroom
01-68-3-L
X
Ward Rm Stateroom
01-68-4-L
X
A-Class Only:
Passage
01-68-01-L
(x2)
X
X
B-Class Only:
Passage
01-68-01-L
X X
18 (Rev-0)
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Passenger Stateroom
01-82-0-L
X
Ward Rm Stateroom
01-84-2-L
X
Ward Rm Stateroom
01-85-0-L
X
Crew Locker Rm
1-58-1-L
X
Engr Office/DC Central
1-73-1-Q
19 (Rev-0)
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
A-Class Only:
Passage
1-47-0-L
X
B-Class Only:
Passage
1-47-0-L
X
A-Class only: P- Way 1-47-0-L in
Exh Vnt E02-56-2
X
A-Class only: P- Way 1-47-0-L in
Exh Vnt E02-58-2
X
B-Class only: P- Way 1-47-0-L in
Exh Vnt E02-57-2
X
B-Class only: Lkr 1-56-1-Q in Exh Vent E02-53-1
20 (Rev-0)
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Crew Berthing
1-61-2-L
X
Passage
2-56-0-L (fwd)
X X
A-Class only: P- Way 2-56-0-L in
Exh Vnt E02-58-2
X
B-Class only: P- Way 2-56-0-L in
Exh Vnt E02-57-2
X
IC Room
2-47-1-C
X
Crew Berthing
2-47-0-L
21 (Rev-0)
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Crew Locker Rm
2-59-4-L
X
Crew Lounge
2-72-2-L
X
A-Class Only:
Passage
2-56-0-L (aft)
X X
B-Class Only:
Passage
2-56-0-L (aft)
X
Crew Locker Rm
2-64-1-L
X
Crew Berthing
2-66-1-L
22 (Rev-0)
This Page is left blank Intentionally
23 (Rev-0)
Zone 2
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Passage 1-186-01-L X
CPO Stateroom 1-199-0-L X
CPO Stateroom 1-199-2-L X
Eng Stores 1-186-2-A X
CPO Stateroom 1-177-0-L X
CPO Stateroom 1-165-4-L X
24 (Rev-0)
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
CPO Stateroom 1-165-2-L X
Passage 1-165-0-L X X
CPO Lounge
1-165-3-L
X
Dispensary
1-179-1-L
X
Crew Lounge
2-186-1-L
X
Crew Locker Rm
2-194-0-L
X
Crew Berthing
2-186-4-L
25 (Rev-0)
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Crew Lounge
2-165-2-L
X
Crew Locker Rm
2-175-0-L
X
Crew Berthing
2-165-3-L
26 (Rev-0)
Zone 3
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Flammable Liquid Stores
1-J-0-KL
27 (Rev-0)
Zone 4
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Magazine 1-26-0-M X X
28 (Rev-0)
Zone 5
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Trash Compactor Space
1-186-3-Q
29 (Rev-0)
Zone 6
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Ordnance Workshop 2-40-1-Q
30 (Rev-0)
Zone 7
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Aux Machinery Space No.1
2-82-0-E X
Aux 1 2-82-0-E in Exh Vent
E02-107-1
(x2)
31 (Rev-0)
Zone 8
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Engine Room 3-103-0-E
(x3) X
32 (Rev-0)
Zone 9
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Small Arms Magazine 2-214-2-M
33 (Rev-0)
Zone 10
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
A-Class only:
Steering Gear Rm
3-228-0-E (x2) X
B-Class only:
Steering Gear Rm
3-228-0-E
34 (Rev-0)
Zone 11
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
A-Class only: CPO Bag 2-40-2-A in Exh Vnt E1-46-2
X X
A-Class only: 3- 40-2-A in Exh Vnt
E1-46-2 X X
B-Class only: CPO Bag 2-40-2-A in Exh Vnt E1-45-2
X X
B-Class only: 3- 40-2-A in Exh Vnt
E1-45-2 X X
Bosun Stores 2-17-0-A X
35 (Rev-0)
Zone 12
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e
1-
5- 0-
L
Pa ss ag e
2-ag e
2-
0- 0-
L
Au x
M ac hi n
Sp ac es (w ith B el l, B- Cl as s o ne R oo m
(Q ty
)(w ith B el l, B- Cl as s o
P um p
Comm Ctr 3-47-0-C
36 (Rev-0)
Zone 13
Location
Fire Detection/Alarm System Appliance being tested
Alarm Type ( for satisfactory alarm operation and proper Zone indicated on all annunciators)
Signature and date for SAT appliance operation
Be ll
Au di bl e
Al ok e De te la m e De te m al
D et ec to r
Pu ll
St at io n
Re m ot e
Al ar m L am p
An nu nc ia to r, Pi lo t H ou se
2-nc ia to r, Q ua rt er nc ia to r, He lo
H an ga r 0
1-
7- 0-
L
An nu nc ia to r, Ve st ib ul e
-4 7-
1- L
An nu nc ia to r, Ve st ib ul e 1-
7-
1- L
Pa ss ag e
-6
8-ag e
1-ag e