Specification REV A 4031.doc

DOC document 166 KB Posted

Attached to
PSE Roofing Systems Federal contract opportunity
Solicitation number
SPMYM321Q4031
Issued by
Defense Logistics Agency Land and Maritime

View the file

Other files for this federal contract opportunity

Other files attached to PSE Roofing Systems, newest first.
File Type Posted
Combined Synopsis Solicitation Roofing 4031.docx DOCX document
FAR-DLAD-Local Notes and Clauses 4031.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Storage Building

SPECIFICATION

1. SCOPE

1.1. Provide three (3) roof structures to be installed by the SY on the end of Sierra Pier, Point Loma. Each 22’ wide x 7’-2.25” high x 40’-5” long.

2. APLLICABLE DOCUMENTS

2.1. Issues of Publications - The following documents of the issue date in effect on the date of request for proposal form a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only.

2.1.1. Government

2.1.1.1. OSHA 1910.27 for all safety regulations

2.2. Order of precedence - In the event of conflict between the text of this specification and that of the references cited above, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws or regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1. Three (3) Roof Structures – 22’ wide x 7’-2.25” high x 40’-5” long

3.1.1. See Figure (1) for overhead view of connex boxes it must cover.

3.1.2. Vendor shall provide engineering stamped drawing specific to subject project.

3.1.3. Vendor shall provide all steel framing and fasteners required to build the roof structure.

3.1.3.1. Roof structure must come with the Industrial Connect which goes between the roof panels and the connex box. Industrial Connect must be designed to allow for holes to be drilled through it (holes are not already predrilled) to fasten in to the connex box.

3.1.3.2. There must be no welding required to assemble the structure.

3.1.3.3. The roof structure must prevent rain from leaking through.

3.1.3.4. Panels must have rust preventative coating installed with a warranty of at least 40 years.

3.1.4. Structure including frame members and fasteners to meet engineering stamped drawings meeting all local, state, and federal codes. Structure must meet wind load requirement IAW ASCE 7-16 or equivalent.

3.1.5. Structure will be installed by the SY. Vendor shall answer any questions regarding installation when structure is being assembled. The roof structure will be installed in Point Loma, San Diego.

4. DELIVERY / RETURN

4.1. Delivery - The storage building with its support equipment shall be delivered to the site on or prior to the request date. It is incumbent and the responsibility of the Vendor to either confirm or coordinate the date and time of delivery prior to each shipment via the Point-of-Contact (POC) as designated on the Contract and/or the Contracting Officer's Representative (COR). The Government can provide forklift services for removing machinery from Vendor’s transport during work hours. Documentation with Shipyard copies shall accompany each delivery.

5. GENERAL

5.1. On-Site Shipyard Technical Point of Contact: Michael Vollmer 1-(619)-726-5554

Figure 1

Spec #: 2017-16 Rev: A