Specification P 190.pdf

PDF 273 KB Posted

Attached to
IFB 183-24 5 Year Maintenance Contract for Gas Turbines
Solicitation number
BD-24-1206-40000-40000-106804
Issued by
Suffolk County, Massachusetts

About this file

This document is a bid specification from the Massachusetts Bay Transportation Authority (MBTA) for a Pratt & Whitney FT4C-3F gas turbine maintenance contract. The contract will provide field support for the maintenance, troubleshooting, and repair of two gas turbines used in peaking service over an estimated 5-year period. The contractor will perform hot section inspections, control system function checks, quarterly site visits, and respond to service calls within 48 hours. Additionally, the contractor will conduct performance capacity tests and a station audit of the entire engine and generator control system.

The bid specification includes detailed pricing for the various services over the 5-year contract period. The contractor is required to supply all necessary tools and instrumentation to accomplish the repairs and inspections. Normal working hours are from 6:00 AM to 2:30 PM, and the contractor must provide the hourly overtime rate. The total cost for the items in the bid specification is provided.

View the file

Other files

File Type Posted
IFB 183 Addendum # 3.docx DOCX document
MBTA_Minimum_Insurance_Requirements~13.pdf PDF
IFB 183 Addendum # 2.docx DOCX document
IFB 183 Addendum # 1.docx DOCX document
IFB 183-24 Bid Document~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Bay Transportation Authority, 22 Arlington Ave, Boston, MA 02129

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

SPECIFICATION NO. P-190 – REV. A

PRATT & WHITNEY FT4C-3F MAINTENANCE CONTRACT

JULY 2024

The Massachusetts Bay Transportation Authority operates two (2) Pratt and Whitney FT4C-3F gas turbines, arranged in a twin pack configuration with individual stacks. The liquid fired engines are used in simple cycle peaking service and utilize water injection.

The content and intent of this bid specification is to provide field support for the maintenance, troubleshooting and repair of the gas turbines according to OEM Specifications. All work will be performed according to Pratt and Whitney GG4C Maintenance Manual, Part # 729002. The contractor will provide inspection and testing services for the MBTA’s Unit 6 Generator, Gas Turbine and ancillary equipment over an estimated 5-year period in strict accordance with the specification attached.

SPECIFICATION NO. P-190 – REV. A

BID ITEMS

QUANTITY /

YEAR

PRICE / UNIT

FY 2025

PRICE / UNIT

FY 2026

PRICE / UNIT

FY 2027

PRICE / UNIT

FY 2028

PRICE / UNIT

FY 2029

TOTAL

lA Gas Turbine A /each /each /each /each /each

Hot Section Inspection per OEM 1

Specifications and check sheets

Control System Function Check

Base Plate, Valves, Solenoids, and

Instrumentation

Check Unit Operation

Provide H.S.I. check off list

1B Gas Turbine B /each /each /each /each /each

Hot Section Inspection per OEM 1

Specifications and check sheets

Control System Function Check

Base Plate, Valves, Solenoids, and

Instrumentation

Check Unit Operation

Provide HS.I. check off list

2 Quarterly Site Visit /each /each /each /each /each

Visual Inspection of the Following 4

1) Liquid fuel system

2) Water injection system

3) Engine and Free Turbine Lube

Oil System

4) Electric Generator Lube Oil

System

5) General condition of all structures including intake and exhaust stacks

6) Engine and free turbine base plate hardware and cables

7) Grease all motors and fans

3 Respond to all Gas Turbine service calls /each /each /each /each /each within 48 hours. 40

4A Performance Capacity Test for Gas -

: /each /each /each /each /each

Turbine A performed twice a year. 4

Testing to be performed in accordance with NEPEX heat rate performance curves and regressions.

4B Performance Capacity Test for Gas /each /each /each /each /each

Turbine B performed twice a year. 4

Testing to be performed in accordance with NEPEX heat rate performance curves and regressions.

5 Station Audit /each /each /each /each /each

Provide optional line item. Audit to 2 include testing and calibration of entire engine and generator control system. A detailed list of all the components to be tested is available upon request.

6 Certified calibration/verification of 2 /each /each /each /each /each

Rosemount Model 8800 fuel flow- meter 2

7 Certified calibration/verification of 2 /each /each /each /each /each

Rosemount Model 8800 water flow- meter 2

Contractor to supply all necessary tools and instrumentation to accomplish all repairs and inspections

Normal working hours are from 6:00am until 2:30pm

Please include the hourly overtime rate

Note: travel and accommodations are not billable

Documentation must be provided of all visits to the site

Total of Items 1-7 $