Specification P 190.pdf
PDF 273 KB Posted
- Solicitation number
- BD-24-1206-40000-40000-106208
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Specification (No. P-190 - Rev. A) issued by the Massachusetts Bay Transportation Authority (MBTA) for a 5-year maintenance contract for two Pratt and Whitney FT4C-3F gas turbines. The scope of work includes inspection, testing, and repair services for the gas turbines and ancillary equipment according to OEM specifications. The contractor will provide quarterly site visits, respond to service calls within 48 hours, perform bi-annual performance capacity tests, and conduct a station audit including testing and calibration of the engine and generator control system. The contract term is for 5 years from FY 2025 through FY 2029.
The bid items list the specific tasks and pricing per unit for each fiscal year. Pricing is requested for the Hot Section Inspection, Control System Function Check, Quarterly Site Visits, Service Call Response, Bi-annual Performance Capacity Tests, Station Audit, and Certified Calibration/Verification of Fuel and Water Flow Meters. The contractor is required to supply all necessary tools and instrumentation to accomplish the repairs and inspections. Normal working hours are from 6:00am to 2:30pm, and the hourly overtime rate should be noted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MBTA_Minimum_Insurance_Requirements~13.pdf | ||
| IFB 183-24 Bid Document.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Bay Transportation Authority, 22 Arlington Ave, Boston, MA 02129
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
SPECIFICATION NO. P-190 – REV. A
PRATT & WHITNEY FT4C-3F MAINTENANCE CONTRACT
JULY 2024
The Massachusetts Bay Transportation Authority operates two (2) Pratt and Whitney FT4C-3F gas turbines, arranged in a twin pack configuration with individual stacks. The liquid fired engines are used in simple cycle peaking service and utilize water injection.
The content and intent of this bid specification is to provide field support for the maintenance, troubleshooting and repair of the gas turbines according to OEM Specifications. All work will be performed according to Pratt and Whitney GG4C Maintenance Manual, Part # 729002. The contractor will provide inspection and testing services for the MBTA’s Unit 6 Generator, Gas Turbine and ancillary equipment over an estimated 5-year period in strict accordance with the specification attached.
SPECIFICATION NO. P-190 – REV. A
BID ITEMS
QUANTITY /
YEAR
PRICE / UNIT
FY 2025
PRICE / UNIT
FY 2026
PRICE / UNIT
FY 2027
PRICE / UNIT
FY 2028
PRICE / UNIT
FY 2029
TOTAL
lA Gas Turbine A /each /each /each /each /each
Hot Section Inspection per OEM 1
Specifications and check sheets
Control System Function Check
Base Plate, Valves, Solenoids, and
Instrumentation
Check Unit Operation
Provide H.S.I. check off list
1B Gas Turbine B /each /each /each /each /each
Hot Section Inspection per OEM 1
Specifications and check sheets
Control System Function Check
Base Plate, Valves, Solenoids, and
Instrumentation
Check Unit Operation
Provide HS.I. check off list
2 Quarterly Site Visit /each /each /each /each /each
Visual Inspection of the Following 4
1) Liquid fuel system
2) Water injection system
3) Engine and Free Turbine Lube
Oil System
4) Electric Generator Lube Oil
System
5) General condition of all structures including intake and exhaust stacks
6) Engine and free turbine base plate hardware and cables
7) Grease all motors and fans
3 Respond to all Gas Turbine service calls /each /each /each /each /each within 48 hours. 40
4A Performance Capacity Test for Gas -
: /each /each /each /each /each
Turbine A performed twice a year. 4
Testing to be performed in accordance with NEPEX heat rate performance curves and regressions.
4B Performance Capacity Test for Gas /each /each /each /each /each
Turbine B performed twice a year. 4
Testing to be performed in accordance with NEPEX heat rate performance curves and regressions.
5 Station Audit /each /each /each /each /each
Provide optional line item. Audit to 2 include testing and calibration of entire engine and generator control system. A detailed list of all the components to be tested is available upon request.
6 Certified calibration/verification of 2 /each /each /each /each /each
Rosemount Model 8800 fuel flow- meter 2
7 Certified calibration/verification of 2 /each /each /each /each /each
Rosemount Model 8800 water flow- meter 2
Contractor to supply all necessary tools and instrumentation to accomplish all repairs and inspections
Normal working hours are from 6:00am until 2:30pm
Please include the hourly overtime rate
Note: travel and accommodations are not billable
Documentation must be provided of all visits to the site
Total of Items 1-7 $
File details come from the government source that posted it. Updated .