Special_Provisions.docx
DOCX document 17 KB Posted
- Solicitation number
- IFB199384
- Issued by
- Santa Clara County, California
About this file
This is a Special Provisions document for an Invitation for Bids (IFB) issued by the City of Palo Alto for on-call industrial electrical services at the Regional Water Quality Control Plant. The document outlines mandatory project requirements across four main sections: Project Staff, Project Schedule, Traffic Control, and Insurance Requirements. Section 1 requires that onsite staff assigned on a full-time basis meet specified positions and qualifications, though specific details are not populated in the provided template. Section 2 mandates weekly rolling three-week look-ahead schedules tied to the Construction Schedule, to be submitted to the Construction Manager on an unspecified day and time. Section 3 addresses traffic control, requiring submission of a Traffic Control Plan to the City within five days of the Notice to Proceed, with provisions for more restrictive truck route requirements if applicable. Section 4 establishes modified insurance requirements, specifically mandating that the contractor obtain Builder's Risk insurance on an occurrence basis covering one hundred percent of the completed value on an all-risk basis for the benefit of the City.
The document does not specify pricing terms, contract duration, renewal options, set-asides, or funding sources, as these sections remain incomplete in this template version. The Special Provisions are expressly stated to apply in addition to the General Conditions of the IFB, incorporating by reference all terms defined therein. Notable gaps include unfilled dates for schedule submission deadlines and undefined project staff requirements, indicating this is a preliminary template requiring completion with project-specific details prior to finalization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| On-Call_Industrial_Electricians_for_Regional_Water_Quality_Control_Plant.pdf | ||
| Insurance_Requirements.pdf | ||
| CONTACT_TEMPLATE_Task_Order_Construction_Contract_Template.docx | DOCX document | |
| Performance_Bond.docx | DOCX document | |
| Payment_Bond.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
IFB NO.
PROJECT TITLE:
These Special Provisions apply to this Project in addition to the General Conditions. Terms used in these Special Provisions which are defined in the General Conditions have the meanings assigned to them in the General Conditions.
SECTION 1 – PROJECT STAFF
At a minimum, the onsite staff assigned to this Project on a full-time basis must include the following positions and required qualifications and experience:
SECTION 2 – PROJECT SCHEDULE
Contractor shall provide weekly rolling 3-week look-ahead schedules that are tied to the Construction Schedule for review by the Construction Manager. The weekly look-ahead schedules must be submitted to the Construction Manager each ____________, no later than ____________.
SECTION 3 -- TRAFFIC CONTROL
[Insert more restrictive/ special truck route requirements, if applicable]
|_| Within five (5) days of issuance of the Notice to Proceed Contractor is required to submit a Traffic Control Plan for City approval.
SECTION 4 – INSURANCE REQUIREMENTS
The insurance limits specified in Article 11 of the General Conditions of the IFB are modified as follows:
Builder’s Risk Insurance: Contractor must obtain, at Contractor’s sole expense, a Builders Risk insurance policy issued on an occurrence basis, for all-risk coverage on a one hundred percent (100%) completed value basis on the insurable portion of the Project for the benefit of City.
[Insert special site use requirements or restrictions if applicable.]
END OF SECTION
Invitation for Bids (IFB) Package 136 Rev. September 29, 2021
PART 7 – SPECIAL PROVISIONS
image1.png
File details come from the government source that posted it. Updated .