Special Packaging Instructions P17-2-0214-1.pdf

PDF 80 KB Posted

Attached to
Pump, Radial Pistons Federal contract opportunity
Solicitation number
SPRDL1-23-Q-0090
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document provides special packaging instructions for a variable volume piston pump to be procured by the Defense Logistics Agency Land and Maritime under solicitation SPRDL1-23-Q-0090. The instructions specify preparation of the pump for shipment and storage, including wrapping in cushioning, placement in a barrier bag, and packing in an interior container with additional cushioning and closure. Requirements are outlined for unit packaging, quality assurance testing, certification, and conformance inspections to ensure the pump is properly preserved according to military standards for packaging and storage.

View the file

Other files for this federal contract opportunity

Other files attached to Pump, Radial Pistons, newest first.
File Type Posted
Amendment 0004 - SPRDL123Q0090.pdf PDF
Amendment 0003 - SPRDL123Q0090.pdf PDF
Amendment 0002 - SPRDL123Q0090.pdf PDF
Amendment 0001 - SPRDL123Q0090.pdf PDF
Solicitation - SPRDL123Q0090.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PACKAGING INSTRUCTION (SPI)

DOD SPI INDEX NUMBER

NOMENCLATURE

SPI NUMBER

QUPUI

EA 1

P17---2---0214---1

DRAWING/PART NO.

UNIT PACK AND MILITARY PRESERVATION REQUIREMENTS

NATIONAL STOCK NUMBER

AP14920891

17---2---0214PISTON PUMP, VARIABLE VOLUME

4320---01---492---0891

ITEM WEIGHT---

APPROVAL REVISION DATE

48.1 lbs.

12 Aug 2008PAGE NUMBER NUMBEROF PAGES

3009---E823---002 ---

DISTRIBUTION STATEMENT A: Approved for public release. Distribution is Unlimited.

DJ

STEPS SPECIFICATION STYLE TYPE GRADE CLASS SIZE AND REMARKS (INCHES)

UNIT PACK LOGISTICS DATA (Approximate unit pack weight and size)

WEIGHT (POUNDS) CUBE (CUBIC FEET)

INTERMEDIATE PACKAGING

MARKING

REMARKS

(B)1 V As RequiredTape (B)2

2 III B 20 x 23Container (Bag) (C)3 Closure (C)4 Heat Seal

RSC CF W5c WRContainer (Box) (D)5 14 x 14 x 12

(D)7 (D)8 (D)9

QUALITY PERFORMANCE & TESTING REQUIREMENTS

A---A---59135

ASTM D5486

MIL---DTL---117

ASTM D5118

A---A---59136 A---A---59136

ASTM D1974

IAWMIL---STD---2073---1

As specified hereon.

IAWMIL---STD---129

As specified hereon.

IAWMIL---STD---2073---1

As specified hereon.

Cushioning (Ends) (D)6 A---A---59136

SEE NOTE (F)

51.6 lbs.

X ( )

( )X

( )X

X

1.512 cu. ft.

SIZE (EXTERIOR INCHES)

14.4 x 14.4 x 12.6

UNIT PACKMATERIALS

Cushioning

Methods of Preservation (MOP) --- 31

Cushioning (Sides) Cushioning (Top & Bottom) Closure

A 1 As Required, 1/8 thk.

I A 1 14 x 12 x 2 (Two Required) I A 1 10 x 12 x 2 (Two Required) I A 1 10 x 10 x 2 (Two Required)

Method 2B7

LEVEL OF PACK (EXTERIOR PACKAGING): Level A and B IAWMIL---STD---2073---1 & Contract As specified hereon.( ) SEE NOTE (D)X

( )X

The current revision to each of the specifications, standards, and drawings listed on this SPI in effect on the date of invitation for bid constitute a mandatory part of this Instruction. Unless otherwise specified, materials will be minimum size IAWMIL---STD---2073---1 or material specifications. Tolerances shall be IAWmaterial specifications.

Clean and dry in accordance with (IAW) MIL---STD---2073---1 using any applicable method that is not injurious to the item.

(A) --- This SPI is not applicable for Interplant shipments. Packaging andmarking for interplant shipments are for supplies and materials that do not directly enter the military supply system. Typical interplant shipments are shipments from a vendor to a subcontractor or a prime contractor, or between contractors and subcontractors, or from a vendor or contractor to a military arsenal, plant, or other activity for evaluation, immediate use, or further processing as specified in the applicable contract.

(B) --- Completely wrap Variable Volume Piston Pump completely in specified cushioning (Step 1) and secure cushioning with specified tape (Step 2). Tape shall not come in contact with the Variable Volume Piston Pump.

ITEM SIZE ---

ITEM SI

167645---001 A 22 Aug 2023

Original Preparer:

RFR

Revised by:

10 x 8 x 7

ITEM SIZE ---

ITEM CODE ---

ITEM DATA

Dexter Jennings Regina Ryan inches

(APPROX)

Date: 2 Aug 2023

ITEM CODE ---

Date: 28 Mar 2007

CCDC CBC

81361

NOMENCLATURE

SPI NUMBER

P17---2---0214---1

PAGE NUMBER

DRAWING/PART NO.

NATIONAL STOCK NUMBER

AP14920891

17---2---0214PISTON PUMP, VARIABLE VOLUME

4320---01---492---0891

(C) --- InsertwrappedVariableVolumePiston Pump in specified barrier bag (Step 3) and close (Step 4). Bag material shall conform to A---A---3174 as specified in MIL---DTL---117 and shall have a minimum thickness of 4 mil.

Closure (Step 4) shall be accomplished in accordance with the barrier bag or barrier material supplier’s recommendations for dwell, pressure and temperature requirements. The volume of trapped air within the bag (Step 4) shall be kept to a minimum by compressing the bag around the content, or carefully drawing a vacuum inside the bag, prior to final heat sealing. Caution shall be taken to prevent damage to the item or rupture of bag.

(D) --- Place twoend cushioningpads (Step 6) inside specified box (Step 5), place one oneach endof the box.

Then position two side cushioning pads (Step 7) inside box (Step 5), one on each side of box.

Position bottom pad (Step 8) into box, place wrapped and baggedVariable VolumePiston Pump into box (Step 5) on top of bottom pad (Step 8), then position top pad (Step 8) and close (Step 9) box.

Unit pack may serve as theLevel Bpack, except that box shall be closedwith sealingmethodCand the box shall be reinforced in accordance with the reinforcement method 2D of ASTM D1974.

(E) --- Palletization and Unitization: The shipping container, when not requiring skids, shall be placed on the pallet IAWMIL---STD---147 and ANSI MH1 when:

---Shipments of identical items packed in shipping container(s) exceed the total of 50 cubic feet per destination and do not exceed the size or weight limitations for palletized loads.

---The total number of containers, not having identical items going to the samedestination, weighs250 pounds or greater (excluding pallet), or has a volume of 20 cubic feet or greater and does not exceed the size or weight limitations for palletized loads.

(F) --- Packaging Quality Assurance Provisions:

This section outlines the requirements for conducting appropriate quality conformance inspections, examinations, tests and acceptance for packaging and shall be required as specified in the contract.

1. Classification of inspections: The inspection requirements for the packaged item described herein are conducted during First Article Testing (FAT) and Production Lot Testing (Conformance).

2. First Article Testing: The first article inspection and approval (if FAT is required by the contract) consists of the contractor inspectionof items prior to regular production.Note: If required, packaging inspections shall be part of the FAT and be included as part of the FAT Report submittal to the Government (see paragraph 2.d). The first article testing shall be conducted as follows:

a. Sampling: The first article packaging sample shall consist of not less than three unit pack containers and their contents, and when heat seal seam testing is required, three empty barrier bags.

SPI NUMBER

P17---2---0214---1

PAGE NUMBER

DRAWING/PART NO.

NATIONAL STOCK NUMBER

AP14920891

17---2---0214PISTON PUMP, VARIABLE VOLUME

4320---01---492---0891

Packaged samples shall be producedusing the samemethods,materials andequipment aswill beused during regular production.

b. Visual Examination and Tests: Shall be as specified in MIL---STD---2073---1, Appendix G, and:

(1). Packaged samples shall be examined IAW the preservation examinations to determine compliance IAW Table G---I of MIL---STD---2073---1.

(2). Leakage and heat seal seam tests are required for sealed containers as specified in Table G---II of MIL---STD---2073---1. Note: Method of Preservation 10 does NOT require tests.

(3). Compliant wood requirements shall be IAW the contract. Examination shall include review and acceptance of wood packaging material, containers, pallets and dunnage.

(4). The level of pack shall be as specified in the contract. The exterior shipping configuration shall include examination to verify compliance with MIL---STD---2073---1 guidelines for intermediate and shipping containers for the level of pack specified.

(5). Packaged samples shall be marked IAWMIL---STD---129.

c. Certificate of Compliance: Certification shall be required for ALL packaging materials, containers, including level of pack, and palletization materials specified in this SPI. Format shall be IAW the contract and shall include, at a minimum, the contractor’s name, address, phone number, contract number, item name, part number and/or national stock number, a statement specifying with what it complies (i.e. material, size, specification, standard), dated, printed name and title of certifying official, and shall be signed.

d. Packaging Inspections in the FAT Report: The packaging inspection results and documents shall be included in and as part of the FAT Report submittal. At a minimum, it shall include the following information:

(1) Test data (leakage and heat seal seam tests), if required (see 2.b.(2))

(2) Certificate of compliance sheets (see 2.c), including intermediate and/or shipping containers (level of packs) and palletization materials, even if not used as part of the packaging FAT

(3) Preservation/packaging inspection provisions

(4) Photographs of the unit pack(s) including opened package with the item packed inside

(5) Photographs of markings/labels for each packaging configuration

(6) Photographs of the packing configuration including box seal certification, if applicable

SPI NUMBER

P17---2---0214---1

PAGE NUMBER

DRAWING/PART NO.

NATIONAL STOCK NUMBER

AP14920891

17---2---0214PISTON PUMP, VARIABLE VOLUME

4320---01---492---0891

e. Acceptance criteria: Samples that fail to comply with any of the applicable requirements shall be rejected.

3. Production Lot Testing (Conformance):

a. Sampling: Sampling size shall be IAW the Attributes Sampling Plan Table of MIL---STD---1916 for visual examination. Verification Level I shall be used. If required, three samples from the sampling size shall be selected for destructive testing (leakage and heat seal seam tests). Existing sampling plans in item specifications or quality assurance provisions shall take precedence.

b. Visual Examinations and Tests: Shall be conducted IAW 2.b above. If applicable, destructive testing will be conducted after visual examination.

c. Certificate ofCompliance: Shall be preparedIAW2.c above unless the contractor submits a letter of conformance stating that the packaging materials are the same as those that passed the FAT.

File details come from the government source that posted it. Updated .